Abstract: | ABSTRACT: A spatial optimization model is developed and used to limit cumulative effects resulting from storm events by strategically arranging and scheduling forest treatments to meet peak storm-flow constraints. A mixed integer forest management scheduling formulation is used to select the location and timing of forest treatments. The approach includes simulated spatial routing of storm-flows imbedded as hydrologic process constraints (in a nested schedule) within longer-term forest management planning periods in the mathematical programming model. Although difficult to solve, the model shows promise for further research. |