首页 | 本学科首页   官方微博 | 高级检索  
     检索      

考虑汇流过程的楼梯疏散模型研究?
引用本文:郑霞忠,田 丹,陈 述.考虑汇流过程的楼梯疏散模型研究?[J].防灾减灾工程学报,2020(5):796-802.
作者姓名:郑霞忠  田 丹  陈 述
作者单位:三峡大学水利与环境学院,湖北 宜昌 443002 ;三峡大学安全生产标准化评审中心,湖北 宜昌 443002
基金项目:国家自然科学基金(51878385;51609128)资助
摘    要:为探究汇流过程对楼梯疏散的影响程度,运用排队论原理,计算楼层平台人流输出率;引入楼梯汇流比率,描述单位时间内楼梯人流通过率与楼层通道人流通过率;以楼梯汇流过程为基础,结合楼层平台人流输出率与汇流比率,将整个楼梯疏散划分为三个阶段,剖析各阶段内行人流相互作用关系,构建楼梯疏散模型,刻画楼梯疏散中人流量动态变化的过程。设置不同楼层通道宽度,计算汇流比率,模拟不同汇流比率下楼梯疏散过程,结果表明:楼梯疏散能力受楼层汇流过程的影响,随汇流比率的增加,楼层平台人流输出率与楼梯的疏散能力均呈现先增后减的趋势,当汇流比率为 0.46 时,即楼层通道宽度为 130 cm 时,楼层平台人流输出率与楼梯疏散能力达到最大。

关 键 词:系统工程  疏散能力  排队论  汇流过程  楼梯疏散  汇流比率

Staircase Evacuation Model Considering Merging Flow Process
ZHENG Xiazhong,TIAN Dan,CHEN Shu.Staircase Evacuation Model Considering Merging Flow Process[J].Journal of Disaster Prevent and Mitigation Eng,2020(5):796-802.
Authors:ZHENG Xiazhong  TIAN Dan  CHEN Shu
Abstract:For exploring the influence of merging flow process on staircase evacuation,the queuingtheory is adopted to compute the pedestrian flow output rate in the platform floor;the stairs mergingrate is introduced to describe the pedestrian passing rate of staircase and floor channel at the unit time.Based on the merging process of stairs,combining the pedestrian flow output rate in the platform floorand merging rate,the whole staircase evacuation process is divided into three parts,the interaction re?lationship between the number of pedestrian flow in each stage is analyzed,and the staircase evacua?tion capacity measurement model was constructed,describing the dynamic change process of pedestri?an flow in staircase evacuation. The different widths of floor channel are set to calculate the mergingratio,and to simulate the pedestrian merging process of stairs by the different merging rates. The re?sults of simulation show that the floor merging process affect the staircase evacuation capacity,the pe?destrian output rate of floor platforms and the evacuation capacity of stairs showed a trend of first in?crease and then decrease as the increase of confluence ratio. When the flow rate is 0.46,and the floorchannel width is 130 cm,the output rate of floor platform pedestrian flow and the capacity of evacua?tion reach the maximum values.
Keywords:
点击此处可从《防灾减灾工程学报》浏览原始摘要信息
点击此处可从《防灾减灾工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号