台风等效静风荷载作用下输电塔线体系极限承载力分析?
引用本文:刘 石,黄 正,杨 毅,张 楚,高庆水.台风等效静风荷载作用下输电塔线体系极限承载力分析?[J].防灾减灾工程学报,2020(5):757-763.
作者姓名:刘 石  黄 正  杨 毅  张 楚  高庆水
作者单位:广东电网有限责任公司电力科学研究院,广东 广州 510080 ;广东电科院能源技术有限责任公司,广东 广州 510080
基金项目:南方电网科技项目(GDKJQQ20153007)资助
摘    要:台风引起的输电线路破坏情况屡有发生,为了研究台风作用下输电塔线体系的极限承载力,以实际发生倒塔事故的广东省某 220 kV 输电线路的塔-线体系为研究对象,结合台风风剖面和规范中的方法确定塔线体系的等效静力风荷载,考虑输电塔结构的材料非线性和几何非线性特征,通过有限元软件 ANSYS 在逐级加载条件下分析输电塔线体系的极限承载力,研究风向角、相邻塔的变形、导地线张力的变化对极限承载力的影响。结果表明:(1)通过逐级加载的方式可以较为方便的找到不同工况的极限荷载,确定出结构的最不利风向角;(2)塔线体系模型的选取会较大的影响计算结果,应尽量接近真实情况的选取模型,从而得到更为准确的分析结果;(3)导地线初始张力可以一定程度上提高输电塔线体系的极限承载力,在条件允许的情况下可以适当增加导地线的初始张力。

关 键 词:输电塔线体系  等效静力风荷载  非线性特征  极限承载力

Ultimate Bearing Capacity Analysis of Transmission Tower-line System under Equivalent Static Typhoon Wind Load
LIU Shi,HUANG Zheng,YANG Yi,ZHANG Chu,GAO Qingshui.Ultimate Bearing Capacity Analysis of Transmission Tower-line System under Equivalent Static Typhoon Wind Load[J].Journal of Disaster Prevent and Mitigation Eng,2020(5):757-763.
Authors:LIU Shi  HUANG Zheng  YANG Yi  ZHANG Chu  GAO Qingshui
Abstract:The damage of transmission line caused by typhoon occurred frequently. In order to studythe ultimate bearing capacity of transmission tower line system under typhoon load,the transmissiontower-line system of a 220 kV transmission line in Guangdong Province is taken as the example in thisarticle,that many towers was collapsed in a typhoon. The equivalent static wind load of the tower-linesystem is calculated by combining a recommended typhoon wind profile and the wind load calculationmethod of Chinese Load Code. The nonlinear of material and geometric characteristics of the tower isconsidered,and the ultimate bearing capacity of the transmission tower-line system is analyzed understep-loading by ANSYS. The influence on the ultimate bearing capacity caused by the wind direc?tions,the deformation of adjacent towers,and the tension of the line is studied. The analysis resultsshow that:1)the ultimate bearing capacity of the transmission tower-line system and the most danger?ous condition can be obtained by step-by-step upgrade analysis. 2)Finite element modal of tower-linesystem will influence the results the ultimate bearing capacity calculation. Taking more towers into thefinite element modal will get more accurate result. 3)Choosing higher allowable initial force is benefitbecause the ultimate bearing capacity of the transmission tower-line system will increase with the ini?tial tension of the line to some extent.
Keywords: