首页 | 本学科首页   官方微博 | 高级检索  
     

天津市夏季城区道路不同车道积尘负荷的关系
引用本文:朱振宇, 姬亚芹, 张诗建, 张亚飞, 李树立, 赵杰, 赵静波, 张静. 天津市夏季城区道路不同车道积尘负荷的关系[J]. 环境工程学报, 2016, 10(8): 4414-4418. doi: 10.12030/j.cjee.201503058
作者姓名:朱振宇  姬亚芹  张诗建  张亚飞  李树立  赵杰  赵静波  张静
作者单位:1.南开大学环境科学与工程学院, 天津 300071
基金项目:环保公益性行业科研专项(201409004)
摘    要:采用改进的移动式铺装道路积尘采样方法于夏季采集天津市城区不同类型道路各车道的道路积尘样品,计算出积尘负荷,并分析积尘负荷的变化规律。结果表明:天津市区外环线、快速路、主干道、次干道和支路的路面积尘负荷分别为0.06、0.10、0.21、0.22和0.28 g·m-2,天津市道路路面积尘污染强弱顺序为支路 >次干道 >主干道 >快速路 >外环线;对于次干道与支路,不同车道路面积尘负荷差异不大;对于外环线(1车道除外)、快速路和主干道,越接近道路中央积尘负荷越小,且4车道(即慢车道)积尘负荷与其他各车道积尘负荷之间存在线性关系。

关 键 词:积尘负荷   车道   线性关系
收稿时间:2015-03-26

Relationships of silt loading between different lanes of roads in Tianjin,China during summer
ZHU Zhenyu, JI Yaqin, ZHANG Shijian, ZHANG Yafei, LI Shuli, ZHAO Jie, ZHAO Jingbo, ZHANG Jing. Relationships of silt loading between different lanes of roads in Tianjin, China during summer[J]. Chinese Journal of Environmental Engineering, 2016, 10(8): 4414-4418. doi: 10.12030/j.cjee.201503058
Authors:ZHU Zhenyu  JI Yaqin  ZHANG Shijian  ZHANG Yafei  LI Shuli  ZHAO Jie  ZHAO Jingbo  ZHANG Jing
Affiliation:1.College of Environmental Science and Engineering, Nankai University, Tianjin 300071, China
Abstract:Using an improved traveling sampling method to collect road dust from different types of urban roads in Tianjin, China during summer, silt loading was calculated and its variation was analyzed. The results showed that the values of silt loading for outer ring roads, expressways, major arterial roads, minor arterial roads, and collector roads in Tianjin were 0.06, 0.10, 0.21, 0.22, and 0.28 g·m-2, respectively. The decreasing order of polluting road dust was from collector roads >minor arterial roads >major arterial roads >expressways >outer ring roads. For collector roads and minor arterial roads, there was little difference in silt loading between lanes. However, for outer ring roads (except the first lane), expressways, and major arterial roads, silt loading was negatively correlated with the distance from the middle of the road, and there was a linear relationship of silt loading between the fourth lane (slow lane) and the other lanes.
Keywords:silt loading  lane  linear relationship
本文献已被 CNKI 等数据库收录!
点击此处可从《环境工程学报》浏览原始摘要信息
点击此处可从《环境工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号