首页 | 本学科首页   官方微博 | 高级检索  
     


Geotechnical considerations in mine backfilling in Australia
Affiliation:1. School of Engineering, James Cook University, Townsville 4811, Australia;2. Cannington Mine, BHP Billiton, P.O. Box 5874, Townsville 4810, Australia;1. Hebei Province Key Laboratory of Mining Development and Safety Technique, North China University of Science and Technology, Tangshan 063210, China;2. School of Civil, Environmental and Mining Engineering, University of Western Australia, Perth 6009, Australia;3. School of Resources and Safety Engineering, Central South University, Changsha 410083, China;4. Hebei Iron & Steel Group Mine Design Co., Ltd., Tangshan 063701, China;1. School of Civil, Environmental and Mining Engineering, The University of Western Australia, 35 Stirling Highway, Crawley, Perth, Western Australia, Australia;2. Division of Civil Engineering, University of Dundee, Dundee DD1 4HN, United Kingdom;1. Faculty of Land Resources Engineering, Kunming University of Science and Technology, Kunming, 650093, China;2. University of Science and Technology Beijing, Beijing, 100083, China;1. Key Laboratory of High-efficient Mining and Safety of Metal Mine, Ministry of Education, University of Science and Technology Beijing, Beijing 100083, China;2. Jinchuan Group Co., Ltd., Jinchuan, Gansu 737100, China;3. Beijing Institute of Geology, Beijing 100120, China;1. School of Architecture and Civil Engineering, Xi’an University of Science and Technology, 58 Yanta Rd., Xi’an, 710054 China;2. Research Institute on Mines and Environment, Department of Civil, Geological and Mining Engineering, École Polytechnique de Montréal, C.P. 6079 succursale Centre-ville, Montreal, Quebec, Canada H3C 3A7
Abstract:
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号