新疆克孜尔水库地震风险分析及防范研究
引用本文:雷小牛,邓铭江,李兰奇,李梅芝,杨桂玲,安景生.新疆克孜尔水库地震风险分析及防范研究[J].中国安全科学学报,2005,15(11):96-102.
作者姓名:雷小牛  邓铭江  李兰奇  李梅芝  杨桂玲  安景生
作者单位:1. 新疆水利厅,乌鲁木齐,830000
2. 水利部综合事业局
3. 新疆昌吉州方汇水电建筑勘察设计有限公司
4. 新疆克孜尔水库管理局
基金项目:该项目研究过程中得到于庆菊教授级高级工程师、余才渭教授级高级工程师的指导,特致谢意.
摘    要:克孜尔水库地震风险防范系统是在强震台阵、F2活动断层监测设备完善、观测分析中心及抗震风险防范中心等硬件建设的基础上,通过在GIS平台上建立构造纲要、潜在震源区、峰值加速度区划、大坝所在位置等专题图层,完善地震传输系统、大坝数字减灾系统等软件建设。把强震监测信息系统技术应用于水库地震风险防范决策支持和实际运行科学管理,实现可在线处理子台传输过来的地震加速度时程曲线。分析各测点场地最大加速度值、水工结构的动力放大系数、场地卓越频率、结构自振频率、地震持续时间及水库诱发地震判别等重要参数,为各项决策提供可靠的快速支持,从而建立国内首座在活动断层上直接建坝的克孜尔水库大坝的震后快速报警体系和初步数字减灾系统,形成有效的震后快速修复措施,为深入开展活动断层上筑坝技术研究奠定基础。

关 键 词:地震  工程  风险分析  防范研究  克孜尔水库
文章编号:1003-3033(2005)11-0096-071
收稿时间:2005-04-01
修稿时间:2005-04-012005-07-01

Seismic Risk Analysis of Kezier (Xinjiang) Reservoir and Anti-seismic Study
LEI Xiao-niu,DENG Ming-jiang,LI Lan-qi,LI Mei-zhi,YANG Gui-ling,AN Jing-sheng.Seismic Risk Analysis of Kezier (Xinjiang) Reservoir and Anti-seismic Study[J].China Safety Science Journal,2005,15(11):96-102.
Authors:LEI Xiao-niu  DENG Ming-jiang  LI Lan-qi  LI Mei-zhi  YANG Gui-ling  AN Jing-sheng
Abstract:The seismic risk monitoring system of Kezier Reservoir was built on the bases of strong shock net,F2 active fault monitoring equipment,center of observation and analysis,and anti-seismic center.These installations were functioned by fault compendium established on GIS platform,potential epicenter,peak value acceleration area,dam location,seismic information transmit system,and digital dam disaster reduction system.The strong seismic monitoring information system was applied to anti-seismic risk decision support and operation management to realize on-line treatment of the process curve of seismic acceleration transmitted from sub-stations and to analyze the maximum acceleration values from various monitoring locations,dynamic magnified modulus,salience frequency,structural self-shake frequency,sustained seismic period,and the judgment of earthquake induced at reservoir.All these would provide reliable rapid support for various decisions making.In this way the first rapid seismic alerting system and primary digital disaster reduction system were built on the dam of Kezier reservoir located on active fault,from which rapid effective repair measures after earthquake were formed and research basis for constructing dam on active fault were provided.
Keywords:earthquake  project  risk analysis  anti-seismic study  Kezier reservoir