首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Estimation of in-use steel stock for civil engineering and building using nighttime light images
Institution:1. Research Organization of Science and Technology, Ritsumeikan University, 1-1-1 Noji-Higashi, Kusatsu, Shiga 525-8577, Japan;2. Department of Systems Innovation, Graduate School of Engineering, The University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo 113-8656, Japan;3. School of the Environment, Yale University, 195 Prospect St, New Haven, CT, 06511, USA;4. CSIRO, Black Mountain Science and Innovation Park, Clunies Ross Street, Acton, ACT 2601 Canberra, Australia;5. Department of Technology Management for Innovation, Graduate School of Engineering, The University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo 113-8656, Japan;6. College of Science and Engineering, Ritsumeikan University, 1-1-1 Noji-Higashi, Kusatsu, Shiga 525-8577, Japan
Abstract:To establish a sustainable society, it is necessary to understand the flows and stocks of materials. However, traditional material flow analysis requires large quantities of data relating to the consumption and trade of materials in the past and the lifetime distributions of end use. To overcome the problem that such data may not be available, we have proposed using nighttime light images to estimate the in-use stocks of materials in countries for which the data are unavailable. In the previous study, in-use steel stock for civil engineering and building in 2006 was estimated using nighttime light images. However, several aspects of the methodology must be improved, and time-series analyses using nighttime light images have not yet been performed. Therefore, in this study, we improved the estimation of in-use steel stock by using new geological information (i.e., LandScan population distribution data) and correcting the pixel area. We prepared radiance-calibrated nighttime light data for 2006 and 2010 and conducted time-series analyses of the in-use steel stock using the nighttime light data. The in-use steel stock for civil engineering and building in 2010 was found to amount to approximately 11.3 Gt, which was approximately 21% higher than that in 2006.
Keywords:Steel  In-use stock  Nighttime light image  Time-series change
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号