首页 | 本学科首页   官方微博 | 高级检索  
     


Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America
Authors:Scott Murtishaw  Jayant Sathaye  Christina Galitsky  Kristel Dorion
Affiliation:(1) Lawrence Berkeley National Laboratory, Bldg90R4000, Berkeley, CA 94720, USA;(2) Center for Sustainable Development in the Americas, 1700 Connecticut Av. NW, Suite 403, Washington, DC, 20009
Abstract:The Lawrence Berkeley National Laboratory (Berkeley Lab) and the Center for Sustainable Development in the Americas (CSDA) conducted technical studies and organized two training workshops to develop capacity in Central America for the evaluation of climate change projects. This paper describes the results of two baseline case studies conducted for these workshops, one for the power sector and one for the cement industry, that were devised to illustrate certain approaches to baseline setting. Multiproject baseline emission rates (BERs) for the main Guatemalan electricity grid were calculated from 2001 data. In recent years, the Guatemalan power sector has experienced rapid growth; thus, a sufficient number of new plants have been built to estimate viable BERs. We found that BERs for baseload plants offsetting additional baseload capacity ranged from 0.702 kgCO2/kWh (using a weighted average stringency) to 0.507 kgCO2/kWh (using a 10th percentile stringency), while the baseline for plants offsetting load-following capacity is lower at 0.567 kgCO2/kWh. For power displaced from existing load-following plants, the rate is higher, 0.735 kgCO2/kWh, as a result of the age of some plants used for meeting peak loads and the infrequency of their use. The approved consolidated methodology for the Clean Development Mechanism yields a single rate of 0.753 kgCO2/kWh. Due to the relatively small number of cement plants in the region and the regional nature of the cement market, all of Central America was chosen as the geographic boundary for setting cement industry BERs. Unfortunately, actual operations and output data were unobtainable for most of the plants in the region, and many data were estimated. Cement industry BERs ranged from 205 kgCO2 to 225 kgCO2 per metric ton of cement.
Keywords:baselines  baseline emission rates  carbon intensity  cement industry  Central America  electric power  mitigation projects  multiproject baselines
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号