首页 | 本学科首页   官方微博 | 高级检索  
     检索      

金沙江虎跳峡-旭龙河段水电建设景观多样性影响评价
引用本文:李昊民,王娟,田昆,王四海,杨宇明.金沙江虎跳峡-旭龙河段水电建设景观多样性影响评价[J].长江流域资源与环境,2010,19(19):1086.
作者姓名:李昊民  王娟  田昆  王四海  杨宇明
作者单位:(1.中国林业科学研究院资源昆虫研究所,云南 昆明 650224;2.西南林业大学资源学院,云南 昆明 650224,3.国家高原湿地研究中心,云南 昆明 650224; 4.西南林业大学生态旅游学院,云南 昆明 650224)〖
摘    要:金沙江中游水电建设因其对流域生物多样性的影响受到社会各界广泛关注。应用景观生态学方法,选择淹没区面积、斑块数、景观多样性、均匀性、聚集度、蔓延度、形状指数、分维数等指数,构建了由10个一级指标、14个二级指标组成的景观多样性影响评价指标体系,对金沙江“虎跳峡 旭龙河”段适宜水电建设的龙盘、塔城和其宗3个坝址、5套建设方案淹没区景观层次生物多样性的影响进行了比较研究。结果显示,江段往下游方向,景观多样性、均匀性、连通性逐渐降低、破碎化程度加剧;各方案对陆地生物多样性保护价值的影响:其宗下坝>其宗上坝>塔城坝>龙盘高坝>龙盘低坝。研究结果为深入评价金沙江中游水利水电开发的生物多样性影响提供了借鉴和基础。〖


LANDSCAPE DIVERSITY IMPACT ASSESSMENT OF PROPOSED HYDROSTATIONS FROM TIGER LEAP GORGE TO XULONG RIVER SECTION,THE UPPER YANGTZE RIVER
LI Hao-Min,WANG Juan,TIAN Hun,WANG Si-Hai,YANG Yu-Meng.LANDSCAPE DIVERSITY IMPACT ASSESSMENT OF PROPOSED HYDROSTATIONS FROM TIGER LEAP GORGE TO XULONG RIVER SECTION,THE UPPER YANGTZE RIVER[J].Resources and Environment in the Yangtza Basin,2010,19(19):1086.
Authors:LI Hao-Min  WANG Juan  TIAN Hun  WANG Si-Hai  YANG Yu-Meng
Institution:(1. Research Institute of Resource Insect, Chinese Academy of Forestry Science, Kunming 650224, China|2. College of Nataral Resources| Southwest Forestry University, Kunming 650224, China|3. National Plateau Wetlands Research Center of China, Kunming 650224, China; 4. College of Ecotourism|Southwest Forestry University| Kunming 650224| China)〖
Abstract:The environmental impacts of the proposed hydro stations on the Upper Yangtze River (also known as Jinsha River),Yunnan,China have aroused widely public concerns.In this paper,a landscape level biodiversity impact assessment system with 10 first and 14 second order indices including total area to be flooded,vegetation cover,landscape diversity and evenness,aggregation index,contagion index,shape index,fractal index,etc.was set up to assess the biodiversity impacts of the proposed five construction schemes of the three dams from the“Tiger Leap Gorge”to the“Xulong River”,along the Upper Yangtze River.A quantified comparison study from three aspects of landscape level diversity—respectively the type,patch and pattern diversities was carried out.Results showed that the five flooding area's landscape diversity and connectivity decreased toward downstream;however,the landscape fragmentation increased.The order of the five sites according to their biodiversity impacts was:Qizong lower dam scheme>Qizong upper dam scheme>Tacheng dam scheme>Longpan high dam scheme>Longpan low dam scheme.This conclusion will provide a scientific basis for further biodiversity impact studies and decision making of hydropower development in the Upper Yangtze catchments.〖
Keywords:
点击此处可从《长江流域资源与环境》浏览原始摘要信息
点击此处可从《长江流域资源与环境》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号