首页 | 本学科首页   官方微博 | 高级检索  
     检索      

FGD系统中吸收塔浆液起泡溢流的原因分析及解决办法
引用本文:程永新.FGD系统中吸收塔浆液起泡溢流的原因分析及解决办法[J].电力环境保护,2011,27(1):35-37.
作者姓名:程永新
作者单位:中国电力工程顾问集团中南电力设计院,湖北,武汉,430071
摘    要:在石灰石-石膏湿法烟气脱硫(FGD)工艺系统中,吸收塔浆液溢流是较为常见的现象,它对FGD系统的稳定运行非常不利。通过分析产生吸收塔浆液溢流的各种原因,提出解决吸收塔浆液溢流的办法,保证脱硫系统的稳定运行。

关 键 词:湿法烟气脱硫  吸收塔浆液  泡沫  溢流  消泡剂

Analysis of causes and solutions of absorber seriflux foaming overflow
CHENG Yong-xin.Analysis of causes and solutions of absorber seriflux foaming overflow[J].Electric Power Environmental Protection,2011,27(1):35-37.
Authors:CHENG Yong-xin
Abstract:In the wet limestone - gypsum flue gas desulfurization ( FGD ) process system ,the absorber seriflux overflowing is relatively common phenomenon that has very adverse to the regular operation of FGD systems. Through the analysis of various causes of absorber seriflux overflow,the method to solve the ,question were put forward in order to ensure the normal operation of desulfurization system.
Keywords:wet flue gas desulfu rization  absorption tower seriflux  foam  overflow  defoamer
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号