首页 | 本学科首页   官方微博 | 高级检索  
     

电厂建设运行中的水土流失预测与水土保持设计
引用本文:杨易,刘国东. 电厂建设运行中的水土流失预测与水土保持设计[J]. 电力环境保护, 2013, 0(6): 56-59
作者姓名:杨易  刘国东
作者单位:四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065
摘    要:在燃煤电厂建设运行的同时,将引起一系列的水土流失问题.以四川国电金堂电厂二期扩建工程为例,简要说明项目区水土流失预测的内容和方法,并在其基础上对可能产生的水土流失和危害进行了分析,同时介绍了建设期和运行期采取的综合防治措施,为类似工程的水土保持提供借鉴.

关 键 词:电厂  风力侵蚀  水土流失预测  水土保持措施

Soil and water erosion prediction and soil and water conservation design during construction and operation period in power plant project
Abstract:A series of soil erosion problems will be caused while the coal -fired power plant is construction and operation. Taking the second expansion project of Sichuan Guodian Jintang Power Plant as an example,this re- search briefly introduced the content and methods of the prediction the soil erosion in the project area, and based on the analysis the erosion and hazards which may caused, are discussed At the same time, it introduced the comprehensive prevention and control measures in construction and operation period,to provide a reference for similar projects of soil and water conservation.
Keywords:power plant  wind erosion  prediction of the soil erosion  measures of soil and water conservation
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号