Abstract: | ABSTRACT: In estimating the costs of a reservoir project, it is difficult to produce accurate costs without performing a detailed design and quantity takeoff. The computerized procedure presented in this article provides a method for determining these planning level costs quickly and easily, while maintaining reasonable accuracy. |