首页 | 本学科首页   官方微博 | 高级检索  
     检索      


ESTIMATING THE Q100 IN BRITISH COLUMBIA: A PRACTICAL PROBLEM IN FOREST HYDROLOGY1
Authors:Lynne Tolland  Jaime G Cathcart  S O Denis Russell
Abstract:ABSTRACT. Estimates of peak flows, with specified return periods, are needed in practice for the design of works that affect streams in forested areas. In the province of British Columbia (B.C.), Canada, the new Forest Practices Code specifies the 100-year instantaneous peak flow (Q100) for the design of bridges and culverts for stream crossings under forest roads; and many practitioners are engaged in making such estimates. The state of the art is still quite primitive, very similar to the state of urban hydrology 30 years ago, when popular estimating techniques were used with little consideration given to their applicability. Urban hydrology then evolved on a much more scientific basis, such that within about a 10-year period, standard approaches to design were developed. Forest hydrology should follow the same pattern, at least as far as estimating design flows is concerned. Popular present day design procedures include the rational method and other empirical approaches based on rainfall data, as use of the standard flood frequency approach is limited by the paucity of relevant flow data. Estimating procedures based on peak streamflow measurements and statistics are likely to evolve, and these will include distinctions for rain, snowmelt, and rain on snow floods. Guidelines will also be developed for selecting and applying appropriate procedures for particular areas.
Keywords:forest hydrology  urban hydrology  peak flow estimation  design  forest roads  stream crossings
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号