首页 | 本学科首页   官方微博 | 高级检索  
     

基于典型案例的流域规划环评管理成效评估
引用本文:黄蕊,李巍,韩宇. 基于典型案例的流域规划环评管理成效评估[J]. 中国环境科学, 2021, 41(7): 3409-3417
作者姓名:黄蕊  李巍  韩宇
作者单位:1. 北京师范大学环境学院, 环境模拟与污染控制国家重点联合实验室, 北京 100875;2. 内蒙古自治区环境工程评估中心, 内蒙古 呼和浩特 010011
基金项目:国家自然科学基金资助项目(72050001);第二次青藏高原综合考察研究任务专题(2019QZKK0307)
摘    要:为提高流域规划环评的有效性,评估流域规划环评的管理成效并分析存在的问题和短板,在总结我国流域规划环评发展状况的基础上,收集并分析了 2014~2019年经国家环保部门审查的25个涉及长江、黄河、珠江三大流域的典型案例,从改善环境质量、保障生态安全、维系生态功能和促进绿色发展等4个方面,选取16项评价指标分级打分,并通过...

关 键 词:流域开发规划  环境影响评价  成效评估  案例分析  绿色发展
收稿时间:2020-11-25

A performance evaluation based on typical cases of environmental impact assessment of watershed development plans
HUANG Rui,LI Wei,HAN Yu. A performance evaluation based on typical cases of environmental impact assessment of watershed development plans[J]. China Environmental Science, 2021, 41(7): 3409-3417
Authors:HUANG Rui  LI Wei  HAN Yu
Affiliation:1. State Key Joint Laboratory of Environment Simulation and Pollution Control, School of Environment, Beijing Normal University, Beijing 100875, China;2. Appraisal Center for Environmental Engineering, Inner Mongolia Autonomous Region, Hohhot 010011, China
Abstract:To further improve effectiveness of the EIA of WDPs, it is imperative to develop an evaluation of performance of this means to reveal potential shortfalls or problems. Based on an overview of nation-wide practice of the EIA of WDPs, 25 cases involving the three major river basins of the Yangtze River, the Yellow River and the Pearl River were selected from the EIAs reviewed by the state-level environmental authority from 2014 to 2019. The performance and shortfalls were studied by 16 indicators stemmed from four aspects of environmental quality compliance, ecological security safeguarding, ecological service maintenance and green development progress. The results acquired by ranking evaluation and the BP neural network built-up through MATLAB showed that, a total of more than 2 billion m3 of water resource for eco-environmental uses had been secured by optimizing water distribution, about 20 thousand tons of major water pollutants had been reduced, and 223 water conservancy projects had been adjusted by downscaling so that 411 km natural segments of rivers were reserved. Moreover, in order to preserve the wild fauna and flora species and their habitats, 122 hydropower development projects were rejected, and 43 environmentally sensitive sites were bypassed. Although the EIA of WDPs had accomplished obvious effectiveness in preserving watershed ecosystem, it played a relatively weak role in promoting watershed green development. It was raised to further improve management of the EIAs of WDP by enhancing EIA technical quality and output implementation, and the role of promoting watershed ecological conservation and high-quality development.
Keywords:watershed development plans  environmental impact assessment  performance evaluation  case study  green development  
本文献已被 CNKI 等数据库收录!
点击此处可从《中国环境科学》浏览原始摘要信息
点击此处可从《中国环境科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号