首页 | 本学科首页   官方微博 | 高级检索  
     

高烈度地震区隧道软硬围岩交接段刚柔并济抗减震技术研究
引用本文:崔光耀,田宇航,麻建飞,郭艳军,谢优. 高烈度地震区隧道软硬围岩交接段刚柔并济抗减震技术研究[J]. 中国安全生产科学技术, 2021, 17(4): 135-140. DOI: 10.11731/j.issn.1673-193x.2021.04.022
作者姓名:崔光耀  田宇航  麻建飞  郭艳军  谢优
作者单位:(1.北方工业大学 土木工程学院,北京 100144;2.四川电力设计咨询有限责任公司,四川 成都 610041)
基金项目:* 基金项目: 国家自然科学基金项目(51408008);北京市属高校基本科研业务费项目(110052971921/061);北京高等学校高水平人才交叉培养“实培计划”大学生科研训练计划深化项目(21XN217/016)
摘    要:为提高高烈度地震区隧道抗震性能,以某铁路隧道为研究背景,分析3种抗减震措施下隧道不同监测点隧道拱顶沉降、边墙收敛、衬砌结构PGA及最小安全系数,通过对比分析得到最优抗减震措施.结果表明:相比于工况1,工况2隧道拱顶沉降减小10.54% ~81.10%,边墙收敛减小13.92% ~78.77%,衬砌结构PGA减小31.4...

关 键 词:隧道工程  软硬围岩交接段  刚柔并济  高烈度地震区  抗减震措施

Research on rigid-flexible combination anti-seismic technology on soft-hard surrounding rock intersection of tunnel in high intensity seismic area
CUI Guangyao,TIAN Yuhang,MA Jianfei,GUO Yanjun,XIE You. Research on rigid-flexible combination anti-seismic technology on soft-hard surrounding rock intersection of tunnel in high intensity seismic area[J]. Journal of Safety Science and Technology, 2021, 17(4): 135-140. DOI: 10.11731/j.issn.1673-193x.2021.04.022
Authors:CUI Guangyao  TIAN Yuhang  MA Jianfei  GUO Yanjun  XIE You
Affiliation:(1.School of Civil Engineering,North China University of Technology,Beijing 100144,China;2.Sichuan Electric Power Design & Consulting Co.,Ltd.,Chengdu Sichuan 610041,China)
Abstract:To improve the anti-seismic response of the tunnel in high intensity seismic areas,taking an actual railway tunnel as the research background,the vault settlement,sidewall convergence,PGA of the lining structure and the minimum safety factor of the tunnel with three different seismic measures are compared and analyzed,so as to find the optimum seismic measure for the tunnel.The results show that compared with case 1,in case 2,the settlement of tunnel vault decreases by 10.54%~81.10%,the convergence of sidewall decreases by 13.92%~78.77,the PGA of lining structure decreases by 31.42%~72.02%,and the minimum safety factor increases by 18.04%~66.13%; in case 3,the settlement of tunnel vault decreases by 3.04%~18.02%,the convergence of sidewall decreases by 4.70%~32.00%,and the PGA increases by 13.95% 48%,the minimum safety factor increases by 7.49%~30.99%; in case 4,the settlement of tunnel vault decreases by 18.46%~83.98%,the convergence of structural sidewall decreases by 17.54%~85.47%,the PGA decreases by 30.00%~69.98%,and the minimum safety factor increases by 47.95%~83.56%.From high to low,the anti-seismic response of the four test cases is as follows: case 4>case 2>case 3>case 1.The research results provide a theoretical basis for the seismic fortification of the intersection of the soft and hard surrounding rock.
Keywords:tunnel engineering   soft-hard surrounding rock intersection   rigid-flexible combination method   high intensity seismic area   anti-seismic measure
本文献已被 CNKI 等数据库收录!
点击此处可从《中国安全生产科学技术》浏览原始摘要信息
点击此处可从《中国安全生产科学技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号