Abstract: | ABSTRACT: A non-linear optimization model is applied to the California State Water Project (SWP) and portions of the Central Valley Project (CVP). The model accounts for the major hydrologic, regulatory, and operational features of both projects. The model maximizes long-term SWP yields over a 70-year period, using a quarterly time step. The potential for increased yield associated with a proposed facility improvement is evaluated with the model. The proposed facility is an extension of the Folsom-South Canal, which would allow water to be conveyed from the American River below Folsom Reservoir into New Melones Reservoir on the Stanislaus River or into the California Aqueduct. Model results indicate that extension of the Folsom-South Canal has the potential to increase SWP yields by 13 percent. |