首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Stepwise calibration of the activated sludge model no. 1 at a partially denitrifying large wastewater treatment plant
Authors:Fall C  Espinosa-Rodriguez M A  Flores-Alamo N  van Loosdrecht M C M  Hooijmans C M
Institution:Universidad Autonoma del Estado de Mexico (UAEM-CIRA), Toluca, Mexico. c-fa-ll@hotmail.com
Abstract:Activated sludge modeling technology is maturing; however, currently, there exists a great need to increase its use in daily engineering practice worldwide. A good way for building the capacities of the practitioners is to promote good modeling practices and standardize the protocols. In this study, a systematic procedure was proposed to calibrate the Activated Sludge Model No. 1 (ASM1) at a large wastewater treatment plant, by which the model adequately predicted the quality of the effluent and the sludge quantities. A hydraulics model was set up and validated through a tracer test. The Vesilind settling constants were measured and combined with the default value of the flocculent zone settling parameter, to calibrate the clarifiers. A virtual anoxic tank was installed in the return activated sludge to mimic the denitrification occurring in the settlers. In ASM1, the calibrated parameters were only two influent chemical oxygen demand fractions and one kinetic constant (oxygen half-saturation coefficient).
Keywords:
本文献已被 PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号