首页 | 本学科首页   官方微博 | 高级检索  
     

火电厂湿烟囱排放的可行性探讨
引用本文:朱蕾. 火电厂湿烟囱排放的可行性探讨[J]. 环境科学与管理, 2010, 35(1): 94-95,175
作者姓名:朱蕾
作者单位:青岛大学,化学化工与环境学院,山东,青岛,266071
摘    要:在石灰/石灰石-石膏法湿法烟气脱硫(FGD)工艺中,是否安装烟气热交换器(GGH)的问题一直受到关注。本文介绍了湿法烟气脱硫工艺中GGH的作用,设置GGH的弊端,以及湿烟囱排放对工艺和设备所提出的更高的设计要求。从安全和经济角度考虑,对于FGD工艺采用湿烟囱排放代替GGH是可行的。

关 键 词:湿法烟气脱硫  烟气换热器  湿烟囱

Feasibility Study of Wet Stack Emission in Power Plant
Zhu Lei. Feasibility Study of Wet Stack Emission in Power Plant[J]. Environmental Science and Management, 2010, 35(1): 94-95,175
Authors:Zhu Lei
Affiliation:College of Chemical and Environmental Engineering;Qingdao University;Qingdao 266071;China
Abstract:In the program of Lime/Limestone and Gypsum Wet Flue Gas Desulfurization(FGD),the problem of whether installing a Gas-Gas Heater(GGH)always attracts attention.This paper introduces the function of GGH in Wet Flue Gas Desulfurization,the disadvantage of installing a GGH.And the higher design requirements on the program and equipments under the wet stack emission.From the security and economic point of view,it is feasibility to adopt wet stack emission instead of GGH in FGD program.
Keywords:wet flue gas desulfurization  gas-gas heater  wet stack  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号