对火电厂烟气脱硫设计总平面布置的探讨
引用本文:黄海华.对火电厂烟气脱硫设计总平面布置的探讨[J].电力环境保护,2004,20(4):15-16.
作者姓名:黄海华
作者单位:广东省电力设计研究院,广东,广州,510600
摘    要:火电厂烟气脱硫工程往往是在场地或其他条件受到诸多限制的情况下进行的,设计中总平面布置的作用显得尤其突出。以几个电厂脱硫工程的设计为例,探讨如何充分利用已有务件,协调脱硫与整个厂区总平面布置的关系,以使设计合理,经济。

关 键 词:烟气脱硫  总平面布置  因地制宜
文章编号:1009-4032(2004)04-0015-02
修稿时间:2004年6月1日

Investigation on plane layout of FGD in coal-fired power plant
.Investigation on plane layout of FGD in coal-fired power plant[J].Electric Power Environmental Protection,2004,20(4):15-16.
Authors:
Abstract:The FGD project of fossil fuel power plant is usually carried out in the situations when the site and other conditions are greatly restricted.Therefore,the design,especially the general arrangement,plays an important role.In this article,the designs of several power plant FGD projects are used as examples to explore how to make full use of the existing conditions to coordinate the relation between desulfurization and the general arrangement of the whole plant area. The design will be reasonable and economical.
Keywords:FGD  general arrangement  taking measures suited to local conditions