首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A comparative study on cost analysis,efficiency, and process mechanism of effluent treatment plants in Bangladesh
Authors:Nilay Kumar Sarker  Suman Sarkar
Institution:Department of Chemical Engineering, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh
Abstract:Investigations were conducted into the treatment of effluents produced during manufacturing processes at both a chemicals production facility and a paint manufacturing facility. A comparison of costs of wastewater treatment at both facilities was also performed. The untreated effluents from both facilities were high in biological oxygen demand (BOD), chemical oxygen demand (COD), and total dissolved solids (TDS). In addition, the effluents from the two facilities deviated significantly in dissolved oxygen (DO) content and pH levels. However, both facilities ultimately released treated wastewater with allowable amounts or levels of BOD, COD, TDS, DO, and pH as permitted by the Department of the Environment, Ministry of Environment and Forests, Bangladesh (DOE). The effluent treatment plants (ETP) at both facilities contained combinations of chemical and biological treatment processes. The treatment processes used at the chemicals production facility and at the paint manufacturing facility were continuous and semi‐batch processes, respectively. The biological treatment section of the ETP at the chemicals production facility has both anaerobic and aerobic units, while the paint manufacturing facility has only an aerobic unit. Annual installation and operation costs of the ETP at the chemicals production facility was Bangladeshi Taka (Tk) 1,300,000 ($16,667 US dollars) and Tk 800,000 ($10,257), respectively. The annual installation and operation costs of the ETP at the paint manufacturing facility were Tk 3,050,000 ($39,103) and Tk 6,200,000 ($79,488), respectively.
Keywords:biological treatment  BOD  chemical treatment  COD  TDS
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号