首页 | 本学科首页   官方微博 | 高级检索  
     检索      

早强充填体与矿柱相互作用的声发射特征试验研究
引用本文:王明旭,,程爱平,刘晓云.早强充填体与矿柱相互作用的声发射特征试验研究[J].中国安全生产科学技术,2017,13(4):10-15.
作者姓名:王明旭    程爱平  刘晓云
作者单位:1.武汉科技大学 资源与环境工程学院,湖北 武汉 430081;2.武汉科技大学 冶金矿产资源高效利用与造块湖北省重点实验室,湖北 武汉 430081
摘    要:为了更好厘清充填体与矿柱相互作用机理,提出使用石蜡作为胶结剂,通过尾砂加石蜡拌合模拟充填体,建立充填体与矿柱相互作用的复合体模型。基于充填体与矿柱侧边存在临空面这一实际情况,采用自制的双轴加载装置模拟井下早强充填体与矿柱共同受载情况。借助声发射仪监测充填体与矿柱在加载作用下的AE振铃计数及AE点发生位置。试验结果表明:尾砂+石蜡模拟充填体加载破坏后存在残余应力;充填体与矿柱复合体试样在加载过程中的内部破坏主要发生在充填体内和充填体与矿柱接触带区域。

关 键 词:最小主应力  最大主应力  双轴加载  充填体  矿柱  损伤破坏  声发射

Experimental study on acoustic emission characteristics of interaction between early strength filling body and pillar
WANG Mingxu,' target="_blank" rel="external">,CHENG Aiping,LIU Xiaoyun.Experimental study on acoustic emission characteristics of interaction between early strength filling body and pillar[J].Journal of Safety Science and Technology,2017,13(4):10-15.
Authors:WANG Mingxu  " target="_blank">' target="_blank" rel="external">  CHENG Aiping  LIU Xiaoyun
Institution:1. School of Resource and Environmental Engineering, Wuhan University of Science and Technology, Wuhan Hubei 430081, China; 2. Key Laboratory of Hubei Province for High-Efficient Use of Metallurgical Mineral Resources and Agglomeration, Wuhan University of Science and Technology, Wuhan Hubei 430081, China
Abstract:In order to better clarify the interaction mechanism between the filling body and pillar, it was proposed to establish a complex model of interaction between filling body and pillar by using the paraffin as the cementing agent and simulating the filling body with the mixture of tailings and paraffin. Based on the fact that there exist free face on the sides of filling body and pillar, the common loading situation of underground early strength filling body and pillar was simulated by using the self-made biaxial loading device. The acoustic emission (AE) ring-down count and the occurrence positions of AE points in the filling body and pillar under loading were monitored by the acoustic emission instrument. The experimental results showed that there exists the residual stress after the loading failure of simulated filling body with tailings and paraffin. The internal failure of the complex specimen with the filling body and pillar during the loading process mainly occur in the filling body and the contact zone area between the filling body and pillar.
Keywords:minimum principal stress  maximum principal stress  biaxial loading  filling body  pillar  damage and failure  acoustic emission (AE)
本文献已被 CNKI 等数据库收录!
点击此处可从《中国安全生产科学技术》浏览原始摘要信息
点击此处可从《中国安全生产科学技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号