首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Some Factors in Minimizing Precipitator Costs
Authors:Louis Theodore  Joseph P Reynolds
Institution:Manhattan College
Abstract:This paper is directed to those individuals involved in design of electrostatic precipitators. The Deutsch-Anderson model is usually employed by industry for the design of electrostatic precipitators. The so-called process design variable in this approach is the total capture area in the precipitator. Unfortunately, little is available on the equipment design of this unit, i.e., the geometric arrangement of the plates that constitute the capture area and the external dimensions of the physical structure that houses the precipitator components. These are important economic considerations, and it is to this subject that this paper is directed. It is relatively easy to predict equipment costs for “off-the-shelf” electrostatic precipitators; it is more difficult to closely predict the cost for a custom-made unit, which is more often the case encountered in practice. Once the capture area is calculated, the total precipitator cost becomes a strong function of the outer casing and outer accessories of the physical system. In this paper, a model is presented that can help minimize precipitator cost. An illustrative example complements the development of the model.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号