MBBR处理油页岩干馏废水不同挂膜方式的性能比较 |
| |
引用本文: | 李娜,邓一兴,李国德,武士威,胡筱敏,代岚. MBBR处理油页岩干馏废水不同挂膜方式的性能比较[J]. 环境工程, 2021, 39(6): 59-64,178. DOI: 10.13205/j.hjgc.202106010 |
| |
作者姓名: | 李娜 邓一兴 李国德 武士威 胡筱敏 代岚 |
| |
作者单位: | 沈阳师范大学实验教学中心,沈阳110034;沈阳师范大学科研处,沈阳110034;东北大学资源与土木工程学院,沈阳110004;沈阳师范大学粮食学院,沈阳110034 |
| |
基金项目: | 沈阳市高层次创新人才计划项目(RC190366);辽宁省科技项目(2019-ZD-0483);辽宁省教育厅项目(LJC201907) |
| |
摘 要: | 为实现生物膜反应器的快速启动和稳定运行,对MBBR处理油页岩干馏废水的不同挂膜驯化方法进行了优化.分别采用2种挂膜驯化方式进行:方法1先用模拟生活污水对填料进行挂膜,然后用以模拟生活污水稀释20倍的油页岩干馏废水对生物膜进行驯化;方法2直接采用模拟生活污水稀释20倍的油页岩干馏废水进行连续流挂膜驯化.实验结果表明:在相...
|
关 键 词: | 移动床生物膜反应器 油页岩干馏废水 模拟生活污水 挂膜 |
收稿时间: | 2020-09-09 |
COMPARISON OF DIFFERENT BIOFILM CULTURING METHODS IN MBBR FOR OIL SHALE RETORTING WASTEWATER TREATMENT |
| |
Affiliation: | 1. Experimental center of Shenyang Normal University, Shenyang 110034, China;2. Office of Academic Research, Shenyang Normal University, Shenyang 110034, China;3. School of Resources and Civil Engineering, Northeastern University, Shenyang 110004, China;4. Grain College of Shenyang Normal University, Shenyang 110034, China |
| |
Abstract: | In order to realize the rapid start-up and stable operation of the biofilm reactor, comparative studies were conducted on different methods of biofilm culturing in the process of MBBR of oil shale retorting wastewater treatment. The experiment was carried out by two methods of filming and domestication. Method 1 was to film the filler with simulated domestic sewage, and then domesticate the biofilm by using the oil shale retorting wastewater diluted 20 times by the simulated domestic sewage; Method 2 directly used oil shale retorting wastewater diluted 20 times with simulated domestic sewage for continuous flow film domestication. The results showed that:in the same operation stage, the growth of biofilm in method 2 was better than that in method 1, and the biomass of method 1 and method 2 were 941 mg/L and 1628 mg/L respectively, on the 35 th day. From the perspective of nitrogen and carbon removal, the start-up and stable operation time of method 2 was shorter, and the treatment efficiency was also better than that of method 1; the biofacies and SEM images showed that compared with method 2, the biofilm structure in method 2 was more compact, and the arrangement of microorganisms was more closely and the number of microorganisms was lager. So directly adopting the oil shale retorting wastewater diluted 20 times with simulated domestic sewage to carry out continuous flow film domestication was proved to be the best starting method. |
| |
Keywords: | |
本文献已被 万方数据 等数据库收录! |
| 点击此处可从《环境工程》浏览原始摘要信息 |
|
点击此处可从《环境工程》下载全文 |
|