基于郑州地铁下穿南水北调干渠的Peck公式反演分析
引用本文:田均举,朱坤,蔡松,肖亚冲,郑培信. 基于郑州地铁下穿南水北调干渠的Peck公式反演分析[J]. 安全与环境工程, 2021, 28(2): 109-113,132
作者姓名:田均举  朱坤  蔡松  肖亚冲  郑培信
作者单位:河南璟信工程监理有限公司,河南洛阳471000;河南省交通规划设计研究院股份有限公司,河南郑州450046;华北水利水电大学地球科学与工程学院,河南郑州450046;华北水利水电大学地球科学与工程学院,河南郑州450046;河南省尧栾西高速公路建设有限公司,河南洛阳471000
基金项目:河南省交通厅横向项目(2020J5)。
摘    要:土压平衡盾构隧道下穿通水运行中的南水北调工程,在国内尚属首例.以郑州地铁城郊线土压平衡盾构隧道下穿南水北调中线干渠区间实测数据为依据,将Peck公式法运用于隧道下穿南水北调工程引起的地表沉降预测研究中,利用反演分析法,通过引入最大沉降量修正系数j和沉降槽宽度修正系数k,结合实测数据对Peck公式进行修正,得出适用于郑州...

关 键 词:南水北调干渠  土压平衡盾构  Peck公式  反演分析  修正系数

Inversion Analysis of Peck Formula Based on Zhengzhou Subway Running Down the Main Channel of South-to-North Water Transfer
TIAN Junju,ZHU Kun,CAI Song,XIAO Yachong,ZHENG Peixin. Inversion Analysis of Peck Formula Based on Zhengzhou Subway Running Down the Main Channel of South-to-North Water Transfer[J]. Safety and Environmental Engineering, 2021, 28(2): 109-113,132
Authors:TIAN Junju  ZHU Kun  CAI Song  XIAO Yachong  ZHENG Peixin
Affiliation:(Henan Jingxin Engineering Supervision Co.,Ltd.,Luoyang 471000,China;Henan Provincial Communications Planning&Design Institute Co.,Ltd.,Zhengzhou 450046,China;School of Geosciences and Engineering,North China University of Water Resources and Electric Power,Zhengzhou 450046,China;Henan Yaoluanxi Expressway Construction Co,,Ltd.,Luoyang 471000,CAina)
Abstract:The South-to-North Water Transfer Project in the earth pressure balance shield tunnel under the water running operation is the first in China.Based on the measured data of the earth pressure balance shield tunnel of the Zhengzhou Metro suburb crossing the middle line of the South-to-North Water Transfer Project,this paper applies the Peck formula method to the prediction of surface subsidence caused by the tunnel going through the South-to-North Water Transfer,introduces maximum settlement correction factor m and combines settlement tank width correction factor k with the measured data to obtain a Peck formula suitable for similar projects in Zhengzhou.Based on the actual situation of the site,the paper studies the law of surface subsidence under different buried depth conditions.The results show that the introduction of the maximum settlement correction coefficient m and the settlement groove width correction coefficient k can improve the Peck formula and obtain a good prediction curve,which proves the usability of the Peck formula method in the study of surface settlement prediction caused by the tunnel going through the South-to-North Water Transfer Project;with other conditions being the same,as the buried depth of the tunnel increases,the maximum surface settlement gradually decreases,and the width of the settlement tank gradually increases.
Keywords:South-to-North Water Diversion Canal  earth pressure balance shield  Peck formula  inversion analysis  correction factor