Abstract: | This article describes portland cement-based solidification/stabilization (S/S) treatment of heavy metal-contaminated soil. The soil was discovered during highway construction in West Jordan, Utah. Environmental Chemical Corporation (ECC) performed an emergency response to remediate the soil under contract with the EPA and the United States Bureau of Reclamation (USBR). The soil was treated by S/S. Treatment of the soil, contaminated with lead and arsenic, involved: (1) excavation, (2) size segregation, (3) reduction of oversized particles, (4) addition and mixture of portland cement and cement kiln dust, and (5) beneficial reuse of the treated soil as a subbase. S/S treatment successfully reduced Toxicity Characteristic Leaching Procedure (TCLP) concentrations of the contaminants to below regulatory levels. |