首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Estimation of the recycled content of an existing construction project
Authors:SB Emery  DN Smith  MR Gaterell  G Sammons  D Moon
Institution:aResource and Environment Group, Scott Wilson, 16 Priestgate, Peterborough PE1 1JA, United Kingdom;bThe Waste and Resources Action Programme, The Old Academy, 21 Horse Fair, Banbury, Oxon OX16 0AH, United Kingdom
Abstract:The Government's Sustainable Buildings Task Group recently recommended a benchmark requirement for a minimum 10% of reused/reclaimed or recycled content (by material value) in construction projects. The benchmark would be implemented through Building Regulations and public sector procurement. This paper presents the findings of a pilot study to inform decision-making on the feasibility of setting and meeting such a requirement.The project involved determining current levels of recycled content in Defence Estates’ standard design for modern barracks accommodation, and quantifying the scope to increase this content. The existing designs for the new barracks were found to use nearly 20% recycled and recovered materials. The project identified opportunities to increase this proportion to nearly 25% with no increase in cost or risk.
Keywords:Recycled content  Sustainable construction  Public sector  Procurement  WRAP
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号