首页 | 本学科首页   官方微博 | 高级检索  
     检索      

非煤矿山突水淹井应急救援适用性技术综述
引用本文:黄炳仁,李夕兵,王军,李爱兵.非煤矿山突水淹井应急救援适用性技术综述[J].中国安全生产科学技术,2010,6(3):84-89.
作者姓名:黄炳仁  李夕兵  王军  李爱兵
作者单位:1. 中南大学,长沙,410012;长沙矿山研究院,长沙,410012
2. 中南大学,长沙,410012
3. 长沙矿山研究院,长沙,410012
基金项目:国家"十一五"科技支撑计划 
摘    要:矿山水害事故破坏性大,突发性强,给人民生命和国家财产造成无法挽回的损失,突水淹井应急救援已引起社会各界的高度关注。本文通过对近年来非煤矿山突水淹井应急救援现状调研和分析,指出了目前突水应急救援技术和装备存在的主要问题。针对突水应急救援危险性大、技术难度高和时效性强的特点,阐述了突水应急救援适用性关键配套技术,对井下突水点位置探测、强排水、在地面快速钻孔形成救生通道的快速钻探、快速注浆堵水等突水应急救援适用性技术的原理和应用条件进行了详细介绍。

关 键 词:突水淹井  应急救援  强排水  快速钻探  注浆堵水

Overview of the applicability of emergency rescue technique for inrush water flooding in non-coal underground mines
HUANG Bing-ren,LI Xi-bing,WANG Jun,LI Ai-bing.Overview of the applicability of emergency rescue technique for inrush water flooding in non-coal underground mines[J].Journal of Safety Science and Technology,2010,6(3):84-89.
Authors:HUANG Bing-ren  LI Xi-bing  WANG Jun  LI Ai-bing
Institution:1.Central South University,Changsha 410012,China) (2.Changsha Institute of Mining Research,Changsha,410012,China)
Abstract:The water flooding accidents in non-coal underground mine with the characteristic of large destruction and suddenly strong break out have caused the enormous irreversible lost of people's lives and government properties.So the inrush water flooding emergency rescue has aroused the great concern in the community.Based on the investigation and analysis of recent non-coal mine inrush water flooding emergency rescue cases in recent years in China,the main problems of emergency rescue techniques and equipment at present on inrush water flooding were pointed out.Aimed at the large risk,high technical difficulty and strong timely features of inrush water flooding emergency rescue,the key supporting technology for the applicability of inrush water flooding emergency rescue was carried out.The principles and application conditions of the applicable technologies for the inrush water flooding emergency rescue such as the position detection of inrush water,strong draining,the fast drilling on the ground surface for the formation of life-saving passage,quickly grouting water shutoff were introduced in detail.
Keywords:inrush water flooding  strong draining  fast drilling  grouting water shutoff
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号