首页 | 本学科首页   官方微博 | 高级检索  
     

长江口没冒沙演变过程及其对水库工程的响应
引用本文:时连强,李九发,应铭,左书华,徐海根. 长江口没冒沙演变过程及其对水库工程的响应[J]. 长江流域资源与环境, 2006, 15(4): 458-464
作者姓名:时连强  李九发  应铭  左书华  徐海根
作者单位:华东师范大学河口海岸学国家重点实验室,上海,200062;华东师范大学河口海岸学国家重点实验室,上海,200062;华东师范大学河口海岸学国家重点实验室,上海,200062;华东师范大学河口海岸学国家重点实验室,上海,200062;华东师范大学河口海岸学国家重点实验室,上海,200062
摘    要:研究南槽没冒沙演变规律,可以为筑库引淡蓄水工程建设提供科学依据。根据该海区近百年来各个时期的海图和20年来的实测水文泥沙等资料以及2003、2004年的现场观测数据,探讨了没冒沙的形成及形成后的演变过程。研究表明:没冒沙的形成和发育经历了局部边滩冲刷、边滩沙嘴发育和沙脊形成3个阶段;近半个世纪来,沙体中轴位置在稳定强劲的涨落潮流作用下呈现出西北—东南走向的良好的稳定性,具有潮流脊性质。而蓄淡水库工程建设将有可能使南槽成为适应进出水沙量的新型河槽。

关 键 词:长江河口  没冒沙  冲淤演变  水库工程
文章编号:1004-8227(2006)04-0458-07
收稿时间:2005-07-21
修稿时间:2005-12-20

EVOLUTIONAL PROCESS IN MEIMAOSHA OF THE YANGTZE RIVER ESTUARY AND ITS RESPONSE TO RESERVOIR PROJECT
SHI Lian-qiang,LI Jiu-fa,YING Ming,ZUO Shu-hua,XU Hai-gen. EVOLUTIONAL PROCESS IN MEIMAOSHA OF THE YANGTZE RIVER ESTUARY AND ITS RESPONSE TO RESERVOIR PROJECT[J]. Resources and Environment in the Yangtza Basin, 2006, 15(4): 458-464
Authors:SHI Lian-qiang  LI Jiu-fa  YING Ming  ZUO Shu-hua  XU Hai-gen
Affiliation:State Key Laboratory of Estuarine and Coastal Research, East China Normal University, Shanghai 200062, China
Abstract:The understanding of evolutional process in Meimaosha in the south passage of the Yangtze River Estuary may provide scientific base for the construction of reservoirs along the river.According to data of charts and in-situ water and sediment change for about one hundred years,especially the recent field measures obtained in 2003 and 2004,the form history and evolutional process of the Meimaosha were discussed.The results showed that the formation and growth of Meimaosha had undergone three phases,i.e.the erosion of local beach,the growth of spitting and the formation of sand ridge.Meimaosha exhibited characters of tidal sand ridge as its middle axe had a good stability along the direction from northwest to southeast under the action of steady and driving flood and ebb tides in the passed half century.It is likely that the construction of the reservoir project will change the whole south passage to a new type watercourse suitable for water and sediment passing.
Keywords:Yangtze River Estuary  Meimaosha  evolution of erosion and accumulation  reservoir project
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《长江流域资源与环境》浏览原始摘要信息
点击此处可从《长江流域资源与环境》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号