首页 | 本学科首页   官方微博 | 高级检索  
     

燃煤电厂脱硫设施GGH安装利弊分析
引用本文:郭卫兴. 燃煤电厂脱硫设施GGH安装利弊分析[J]. 黑龙江环境通报, 2010, 0(4)
作者姓名:郭卫兴
作者单位:上海实宏纸业有限公司
摘    要:通过对比上海市燃煤电厂脱硫设施的实际运行情况,结合烟囱腐蚀、烟气温度、烟气抬升高度、能耗、水耗以及投资费用、运行费用等,从环保角度和脱硫设施长效运行角度分析,安装GGH利大于弊。

关 键 词:燃煤电厂  脱硫设施  GGH

Analysis of the Advantages and Disadvantages of GGH of Desulphurization Device in Coal-fired Power Plants
GuoWeixing. Analysis of the Advantages and Disadvantages of GGH of Desulphurization Device in Coal-fired Power Plants[J]. Heilongjiang Environmental Journal, 2010, 0(4)
Authors:GuoWeixing
Affiliation:GuoWeixing(Shanghai Shi Hong Paper Limited; Shanghai 200231);
Abstract:We Compared actual operation of the desulphurization devices in coal - fired power plants in Shanghai, considered the corrosion of stack,flue gas temperature,the plume rise of the flue gas,energy consumption, water consumption as well as the investment and operating cost,and analysed the advantages of installing GGH were bigger than the disadvantages considering the perspective of environmental protection and long - time running of desulphurization devices.
Keywords:Coal-fired power plants  Desulphurization device  GGH
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号