An integrated assessment model for cross-country pipelines |
| |
Authors: | Prasanta Kumar Dey |
| |
Affiliation: | Department of Management Studies, University of the West Indies, Cave Hill Campus, PO Box 64, Bridgetown, Barbados |
| |
Abstract: | The cross-country petroleum pipelines are environmentally sensitive because they traverse through varied terrain covering crop fields, forests, rivers, populated areas, desert, hills and offshore. Any malfunction of these pipelines may cause devastating effect on the environment. Hence, the pipeline operators plan and design pipelines projects with sufficient consideration of environment and social aspects along with the technological alternatives. Traditionally, in project appraisal, optimum technical alternative is selected using financial analysis. Impact assessments (IA) are then carried out to justify the selection and subsequent statutory approval. However, the IAs often suggest alternative sites and/or alternate technology and implementation methodology, resulting in revision of entire technical and financial analysis. This study addresses the above issues by developing an integrated framework for project feasibility analysis with the application of analytic hierarchy process (AHP), a multiple attribute decision-making technique. The model considers technical analysis (TA), socioeconomic IA (SEIA) and environmental IA (EIA) in an integrated framework to select the best project from a few alternative feasible projects. Subsequent financial analysis then justifies the selection. The entire methodology has been explained here through a case application on cross-country petroleum pipeline project in India. |
| |
Keywords: | Feasibility analysis Analytic hierarchy process Cross-country petroleum pipeline project Present value Integration |
本文献已被 ScienceDirect 等数据库收录! |
|