Effects of vacuum levels,carbon dioxide,and structural sizes of linked vessels on dump vessel vented
Abstract:The method of explosion venting is widely used in industrial explosion-proof design due to its simple operation, economical and practical features. A dump vessel vented platform was built. By changing the vacuum level and the gas in the dump vessels and the structural size of linked vessels, the pressure in the explosion vessel and the dump vessel was compared, and the influencing factors of explosion venting investigated. The main conclusions are as follows: In the explosion venting process, the higher the vacuum in the dump vessel, the smaller the pressure peak of the explosion vessel and the dump vessel, and the faster the explosion pressure is lowered. When the dump vessel is under the same vacuum level and the gas in the dump vessel is CO2, the maximum pressure of the explosion vessel and the dump vessel is less than the maximum pressure when the containment medium is air. Under the same vacuum condition, the larger the volume ratio of the dump vessel and the explosion vessel, the smaller the pressure peak of the explosion vessel, the faster the explosion pressure drops, and the volume of the dump vessel reaches or exceeds the explosion vessel. Increasing the volume ratio of the containment vessel to the explosion vessel facilitates protection of the explosion vessel and the containment vessel. Under the same vacuum condition, when the gas explosion in 113 L vessel vents into 22 L vessel, the longer the length of the pipe, the greater the maximum pressure in the spherical vessel. When the gas explosion in 22 L vessel vents into 113 L dump vessel, as the pipeline grows, the maximum pressure in the two vessels decreases, but the reduction is not significant. In practical application, it is recommended to use a vacuum of 0.08Mpa or more for the dump vessel vented, and the containment medium is CO2.In terms of the structural size of the container, it is recommended that the ratio of the receiving container to the explosion container be as large as possible, and the pipe length be as long.
Keywords:Dump vessel vented  Vacuum level  Structure size
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号