首页 | 本学科首页   官方微博 | 高级检索  
     

项目EIA与区域环境规划的协调途径探讨
引用本文:焦保华. 项目EIA与区域环境规划的协调途径探讨[J]. 干旱环境监测, 1998, 12(1): 36-40
作者姓名:焦保华
作者单位:新疆环境监测中心站!乌鲁木齐,830011
摘    要:通过对项目EIA与区域环境规划的概念,性质,内容,方法及在环境管理中作用的论述,指出了二者在实施中存在的问题,阐明了它们的特点与相互关系,同时结合我国当前的环境状况与面临的形势及对环境管理新的要求,提出了在今后的实施中应注意协调的原则和方法。

关 键 词:EIA 环境规划 协调方法 区域规划 环境影响评价

DISCUSSION ON THE COORDINATION BETWEEN EIA OF A PROJECT AND REGIONAL ENVIRONMENT PLANNING
Jiao Baohua. DISCUSSION ON THE COORDINATION BETWEEN EIA OF A PROJECT AND REGIONAL ENVIRONMENT PLANNING[J]. Arid Environmental Monitoring, 1998, 12(1): 36-40
Authors:Jiao Baohua
Abstract:On the basis of the discussion on the concepts,characters,contents, methods and relations to environmental management both EIA of a project and regional environment planning, the existing issues about the both was pointed out,their characteristics and the mutual relations was expound. Combining the evnironmental status,the situation to be faced, the further requirements for environemtnal management in China at present and the principle and method for their implementation in a caordinative way are presented.
Keywords:Project  Region  EIA  Environmental planning  Coordination  Method
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号