首页 | 本学科首页   官方微博 | 高级检索  
     检索      

新型释氧材料制备及对湿地堵塞解除研究
引用本文:刘瑞,傅金祥,张荣新,焦义利,徐静怡.新型释氧材料制备及对湿地堵塞解除研究[J].环境污染与防治,2019,41(4):382-386,392.
作者姓名:刘瑞  傅金祥  张荣新  焦义利  徐静怡
作者单位:沈阳建筑大学市政与环境学院 ,辽宁 沈阳,110168;重庆中法供水有限公司 ,重庆,404100
基金项目:水体污染控制与治理科技重大专项;沈阳建筑大学科研项目
摘    要:针对人工湿地内部DO含量较低引起的生物性堵塞,污水处理效率下降的问题,采用投加释氧材料的方法来提高湿地内部DO含量,修复生物性堵塞。采用CaO_2为释氧剂制备释氧材料,进行释氧性能研究。结果表明:采用大孔弱酸性丙烯酸系阳离子交换树脂作为包埋剂制成的释氧材料释氧性能最佳。在模拟人工湿地污水系统中,释氧材料可使反应器中DO质量浓度在15d内保持在5.0mg/L以上,并且pH保持中性水平,相较未投加释氧材料的对照组,30d内COD的平均降解效率提高125%。投加释氧材料可以使发生生物性堵塞的人工湿地系统在连续运行条件下基质孔隙率在15d内恢复到初始水平的83%左右,并且相较机械曝气具有操作便捷、不受环境限制以及成本低廉的优点。

关 键 词:人工湿地  堵塞  释氧材料  DO

Preparation of a new oxygen releasing material and its application to wetland unclogging
LIU Rui,FU Jinxiang,ZHANG Rongxin,JIAO Yili,XU Jingyi.Preparation of a new oxygen releasing material and its application to wetland unclogging[J].Environmental Pollution & Control,2019,41(4):382-386,392.
Authors:LIU Rui  FU Jinxiang  ZHANG Rongxin  JIAO Yili  XU Jingyi
Institution:(School of Municipal and Environmental Engineering,Shenyang Jianzhu University,Shenyang Liaoning 110168;Chongqing Sino France Water Supply Co.,Ltd.,Chongqing 404100)
Abstract:Aiming at the problem of biological clogging and the decline of sewage treatment efficiency caused by low DO content in the constructed wetland,DO in wetland was improved and biological clogging was repaired by adding oxygen releasing material.CaO 2 was used as oxygen releasing agent to prepare oxygen releasing material,and study the performance of oxygen release.The results showed that the oxygen release performance of the oxygen releasing material made from the macroporous weak acid acrylic acid cation exchange resin as the entrapment agent was the best.In simulated wetland sewage treatment system,oxygen releasing material could kept DO concentration above 5.0 mg/L in 15 days and maintain pH at neutral level.Compared with the control group with no oxygen releasing material,the average degradation efficiency of COD in 30 days could be increased by 125%.The matrix porosity of the constructed wetland system with biological clogging could be restored to 83%of the initial level in 15 days.Compared with mechanical aeration,it had the advantages of convenient operation,unrestricted environment and low cost.
Keywords:constructed wetland  clogging  oxygen releasing material  DO
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号