首页 | 本学科首页   官方微博 | 高级检索  
     检索      

生物法去除地下水中铁锰的影响因素
引用本文:薛罡,何圣兵,王欣泽.生物法去除地下水中铁锰的影响因素[J].环境科学,2006,27(1):95-100.
作者姓名:薛罡  何圣兵  王欣泽
作者单位:东华大学环境科学与工程学院,上海,200051;上海交通大学环境科学与工程学院,上海,200240
基金项目:霍英东基金优选资助课题(94004);上海市自然科学基金项目(04ZR14010);北京市水质科学与水环境恢复工程重点实验室开放基金项目
摘    要:分析了生物法除地下水中铁锰的影响因素,曝气后使地下水中DO为7.0~7.5mg/L及pH为6.8~7.0时,生物滤层中的锰氧化菌能够保持较好活性及除锰能力,且工艺能够达到铁锰同除的要求.本研究提出的“成熟滤料移植”生物过滤方法,适合于对Mn2+吸附能力较强的优质锰砂滤层的接种,而对吸附能力较弱的石英砂滤层,只能采用菌量较大的实验室选择性培养基培养、驯化锰氧化菌的接种方式;锰砂和石英砂生物滤层的反冲洗强度分别控制在6~9L/(s·m2)、7~11L/(s·m2)的较低范围时,滤层的微生物相受扰动较小,反冲后铁锰去除能力能在5h内恢复.同时滤层采用1.0~1.2mm的均质滤料,在反冲洗强度较低的情况下过滤周期依然可延长至35~38h.

关 键 词:地下水  除铁  除锰  影响因素  生物法
文章编号:0250-3301(2006)01-0095-06
收稿时间:2004-10-25
修稿时间:2004-10-252004-12-16

Factors Affecting Biological Removal of Iron and Manganese in Groundwater
XUE Gang,HE Sheng-bing and WANG Xin-ze.Factors Affecting Biological Removal of Iron and Manganese in Groundwater[J].Chinese Journal of Environmental Science,2006,27(1):95-100.
Authors:XUE Gang  HE Sheng-bing and WANG Xin-ze
Institution:College of Environmental Science and Engineering, Donghua University, Shanghai 200051, China. xuegang@dhu.edu.cn
Abstract:Factors affecting biological process for removing iron and manganese in groundwater were analyzed. When DO and pH in groundwater after aeration were 7.0 - 7.5 mg/L and 6.8 - 7.0 respectively, not only can the activation of Mn2+ oxidizing bacteria be maintained, but also the demand of iron and manganese removal can be satisfied. A novel inoculating approach of grafting mature filter material into filter bed, which is easier to handle than selective culture media, was employed in this research. However, this approach was only suitable to the filter material of high-quality manganese sand with strong Mn2+ adsorption capacity. For the filter material of quartz sand with weak adsorption capacity, only culturing and domesticating Mn2+ oxidizing bacteria by selective culture media can be adopted as inoculation in filter bed. The optimal backwashing rate of biological filter bed filled with manganese sand and quartz sand should be kept at a relatively low level of 6 - 9 L/(m2 x s) and 7 -11 L/( m2 x s), respectively. Then the stability of microbial phase in filter bed was not disturbed, and iron and manganese removal efficiency recovered in less than 5h. Moreover, by using filter material with uniform particle size of 1.0 - 1.2 mm in filter bed, the filtration cycle reached as long as 35 - 38h.
Keywords:groundwater  iron removal  manganese removal  factor  biological process
本文献已被 CNKI 万方数据 PubMed 等数据库收录!
点击此处可从《环境科学》浏览原始摘要信息
点击此处可从《环境科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号