首页 | 本学科首页   官方微博 | 高级检索  
     检索      

汤旺河干流伊春红山水电站建设对鱼类资源的影响
引用本文:刘晓兰.汤旺河干流伊春红山水电站建设对鱼类资源的影响[J].环境科学与管理,2011(7):160-162.
作者姓名:刘晓兰
作者单位:黑龙江农垦勘测设计研究院,黑龙江哈尔滨150090
摘    要:伊春红山水电站是汤旺河干流梯级规划中首批开发的水电站,位于汤旺河上游梯级电站的最后一级。红山水电站枢纽工程以发电为主,兼顾水产养殖、提供保障森林防火水源及发展旅游业等的综合利用水利枢纽工程。本文就红山水电站枢纽工程建设对红山坝址段,即上甘岭河段的鱼类资源产生的影响进行预测评价。

关 键 词:汤旺河干流  水电站  鱼类资源  影响预测与评价

Effect of the Construction of Yichun Hongshan Hydroelectric Power Station on Fish Resources in Tangwang River
Liu Xiaolan.Effect of the Construction of Yichun Hongshan Hydroelectric Power Station on Fish Resources in Tangwang River[J].Environmental Science and Management,2011(7):160-162.
Authors:Liu Xiaolan
Institution:Liu Xiaolan(Heilongjiang Farming Institute of Investigation and Design,Harbin 150090,China)
Abstract:The Yichun Hongshan hydroelectric power station is firstly developed in the stave plan of Tangwang River.It located at the last level of Tangwang River stave power plant.The key project of Hongshan hydroelectric power station is produced mainly for generating electricity,as well as for aquaculture.It also provides the ensuring for comprehensive hydro-junction project of tourism and water source of forest fire protection.In this paper,the effect of the key project construction of the Hongshan hydroelectric power station on the fish resources of the Hongshan dam section,namely the Mt.Shanggan section of river was predicted and assessed.
Keywords:Tangwang River main current  hydroelectric power station  fish resources  impact prediction and assessment
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号