首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
The management of construction and demolition waste (CDW) is essential in the formation, growth and renovation of urban areas. This paper presents part of a study on CDW generation and management in the Lisbon Metropolitan Area (LMA). CDW generation was estimated for 2006 and 2007 based on construction activity and waste load movements. The results revealed that in the municipality of Lisbon, remodeling construction activity prevailed, with CDW generation indicators of 954 t/day and a per capita rate of 0.60 t/year. Both values are above the average for the LMA and its two sub-regions (Greater Lisbon and the Setúbal Peninsula). The installed infrastructure for CDW management identified in the LMA is situated within a maximum distance of about 23 km from the geometric center of the city of Lisbon. Despite the fact these locations favor the municipality of Lisbon, the occurrence of illegal dumps is still a reality. A notable effort towards environmental education addressing CDW management is under way so as to make involved citizens aware of the recent CDW legislation, Decree-Law Nr. 46/2008, as well as of the problems arising from scenarios of environmental degradation and uncontrolled use of natural resources in the civil construction sector. Policies are outlined aiming to move towards the more judicious management of CDW.  相似文献   

2.
In this paper, the implementation of effective waste management practices in construction projects and sites is analyzed, using data from a survey answered by 74 Spanish construction companies based in Catalonia. Most commonly implemented practices were found to be on-site cleanliness and order, correct storage of raw materials, and prioritization of the nearest authorized waste managers. The least widespread practices were the use of a mobile crusher on site, the creation of individualized drawings for each construction site, and the dissemination of the contents of the waste management plan to all workers, to help them to meet its requirements. Waste regulations for construction and demolition, and the corresponding construction waste management facilities, were designed before the recession in the Spanish construction sector. Current waste generation rates are still below predicted levels, and the infrastructure was designed for five times more waste generation. Even so, the percentage of reused and recycled waste currently amounts to 43%. Survey respondents highlighted various instruments and measures that would make the management of construction and demolition waste more sustainable. Most of the opportunities identified by construction firms are within the scope of government and related to a combined system of bonus and penalties and the establishment of environmental awareness and training programmes for all the stakeholders. Within the scope of authorized waste managers, firms suggested improvements such as the standardization of fees, a reduction of the time until the issue of waste management certificates, a higher number of inspections, and a change in the current model of a few large construction waste management facilities. This research is useful to better understand the current status of construction and demolition waste management in construction projects and sites. Thus, the results of this research will guide policy makers and relevant stakeholders such as contractors, clients, architects and engineers to achieve the EU target of recovering 70% of construction and demolition waste in 2020. In this sense, reliable information can help governments and professional associations to set future C&D waste management regulations, training programmes and dissemination tools, inspections, etc.  相似文献   

3.
Currently the construction and demolition (C&D) waste collection system in Spain is managed in a decentralized manner by each sub-contracted company. This lack of comprehensive strategy for C&D waste management causes a confusing and sometimes individual attitude regarding the different measures for C&D waste. Therefore effective waste management should be enforced. Construction stakeholders have wide range of best practices in C&D waste management that can be implemented, so they need to be assessed for their effectiveness.The aim of this research study is to assist construction stakeholders in making a decision on C&D waste management. This paper carries out a survey conducted among the construction agents in order to evaluate the effectiveness of 20 best practice measures regarding C&D waste management, identifying the most suitable types of building constructions to implement these practices and also the advantages and drawbacks of their performance in a building construction project.Results of this study show that among the highly effective best practices are: the use of industrialized systems and the contract of suppliers managing the waste. In addition, distributing small containers in the work areas is also another high valued practice, although only 36% of respondents usually implement this measure in their works.  相似文献   

4.
The increasing construction and demolition (C&D) waste causes both cost inefficiency and environmental pollution. Many countries have developed regulations to minimize C&D waste. Implementation of these regulations requires an understanding of the magnitude and material composition of waste stream. Construction waste generation index is a useful tool for estimating the amount of construction waste and can be used as a benchmark to enhance the sustainable performance of construction industry. This paper presents a model for quantifying waste generation per gross floor area (WGA) based on mass balance principle for building construction in China. WGAs for major types of material are estimated using purchased amount of major materials and their material waste rate (MWR). The WGA for minor quantities of materials is estimated together as a percentage of total construction waste. The model is applied to a newly constructed residential building in Shenzhen city of South China. The WGA of this project is 40.7 kg/m2, and concrete waste is the largest contributor to the index. Comparisons with transportation records in site, empirical index in China and data in other economies reveal that the proposed model is valid and practical. The proposed model can be used to setup a benchmark WGA for Chinese construction industry by carrying out large-scale investigations in the future.  相似文献   

5.
Construction and demolition wastes (CDW) have increasingly serious problems in environmental, social, and economic realms. There is no coherent framework for utilization of these wastes which are disposed both legally and illegally. This harms the environment, contributes to the increase of energy consumption, and depletes finite landfills resources. The aim of this paper is to evaluate the impacts of two alternatives for the management of CDW, recycling and disposing. The evaluation is carried out through developing a dynamic model with aid STELLA software by conducting the following steps: (1) quantifying the total cost incurred to mitigate the impacts of CDW landfills and uncollected waste on the environment and human health; (2) quantifying the total avoided emissions and saved energy by recycling waste; (3) estimating total external cost saved by recycling waste and; (4) providing a decision support tool that helps in re-thinking about waste disposal. The proposed evaluation methodology allows activating the stringent regulations that restrict waste disposal and developing incentives to encourage constructors to recycle their wastes. The research findings show that recycling CDW leads to significant reductions in emissions, energy use, global warming potential (GWP), and conserves landfills space when compared to disposal of wastes in landfills. Furthermore, the cost of mitigating the impact of disposal is extremely high. Therefore, it is necessary to recycle construction and demolition wastes.  相似文献   

6.
Economic instrument is indubitably perceived as effective for encouraging or forcing contractors to conduct environmentally friendly construction practices. Previous studies in relation to this topic mainly put emphasis on economic analysis of construction and demolition (C&D) waste management from a static point of view, which failed to consider its dynamics nature by integrating all essential activities throughout the waste chain. This paper is thus intended to highlight the dynamics and interrelationships of C&D waste management practices and analyze the cost-benefit of this process using a system dynamics approach. Data related to concrete and aggregate of a construction project in Shenzhen was collected for the application of the proposed model. The findings reveal that net benefits from conducting C&D waste management will occur, but a higher landfill charge will lead to a higher net benefit, as well as an earlier realization of the net benefit. In addition, the general public under a higher landfill charge will suffer from a higher environmental cost caused by illegal dumping. The simulation results also suggest that current regulation in Shenzhen should be promoted to facilitate a dramatic increase in net benefit from the implementation of C&D waste management. This research is of value in facilitating better understanding on the dynamics of C&D waste management activities throughout the waste chain, as well as providing a tool for simulating the cost-benefit of C&D waste management practices over the project duration.  相似文献   

7.
Prefabrication has been widely regarded as a sustainable construction method in terms of its impact on environmental protection. One important aspect of this perspective is the influence of prefabrication on construction waste reduction and the subsequent waste handling activities, including waste sorting, reuse, recycle, and disposal. Nevertheless, it would appear that existing research with regard to this topic has failed to take into account its innate dynamic character of the process of construction waste minimization; integrating all essential waste handling activities has never been achieved thus far. This paper proposes a dynamic model for quantitatively evaluating the possible impacts arising from the application of prefabrication technology on construction waste reduction and the subsequent waste handling activities. The resulting model was validated based on an actual building project in Shenzhen, China.The simulation results of the design scenarios indicate that the policy on providing subsidy for each square meter of the prefabrication adopted in the construction would have more significant effect on promoting the use of prefabrication and improving the performance of construction waste reduction compared to the increase of income tax benefits. The results also show that (1) interaction exists among different management measures, and (2) the combined effect of multiple policies is larger than the simple sum of their individual impacts, indicating the need for comprehensive consideration on the combined effect of these potential polices. This paper demonstrates the potential benefits of using a system dynamics approach in understanding the behavior of real-world processes. The developed model not only serves as a practical tool for assessing the impact of off-site prefabrication on construction waste reduction and the corresponding waste handling activities, but also help provide a valuable reference to policy makers through the comparison of simulation results generated under various scenarios such that the best policy mix can be identified prior to production.  相似文献   

8.
Construction waste minimization at the design stage is a key strategy in effective waste reduction. However, it seems that few studies focus on exploratory factors that can significantly improve the design of construction waste minimization. This paper addresses this research gap by presenting a set of critical factors that inform and improve the practice of waste minimization design, particularly in the context of Shenzhen, China. Nineteen potential factors which can influence effective waste minimization are presented based on related official guidelines, reports and literature. Top institutions in Shenzhen that have received a Grade A building design certification were surveyed through a questionnaire. From this survey, six critical factors are derived: (1) large-panel metal formworks, (2) prefabricated components, (3) fewer design modifications, (4) modular design, (5) waste reduction investment and (6) economic incentive. The applicability and significance of the identified critical factors for effectively designing waste minimization are also explored. These critical factors not only provide designers and project managers with a useful set of criteria for effective design strategies to reduce construction waste, but also serve as valuable references for the government to formulate related construction waste minimization regulations.  相似文献   

9.
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management.This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.  相似文献   

10.
In Tanzania, construction and demolition (C&D) waste is not recycled and knowledge on how it can be recycled especially into valuable products like building materials are still limited. This study aimed at investigating the possibility of recycling the C&D waste (mainly cementitious rubble) into building material in Tanzania. The building materials produced from C&D waste was concrete blocks. The concrete blocks were required to have a load bearing capacity that meets the building material standards and specifications. Eight C&D waste samples were collected from C&D building sites, transported to the recycling site, crushed, and screened (sieved) to get the required recycled aggregates. Natural aggregates were also used as control. The recycled aggregates were tested in the laboratory following the standard methods as specified in Tanzanian standards. The physical, mechanical and chemical characteristics were determined. The physical and mechanical results showed that recycled aggregates were weaker than natural aggregates. However, chemically they were close to natural aggregates and therefore suitable for use in new concrete block production. In the production process, each experiment utilized 100% recycled aggregates for both fine and coarse portions to replace natural aggregates. The Fuller's maximum density theory was used to determine the mix proportions of materials in which a method that specifies concrete mix by system of proportion or ratio was used. The concrete blocks production processes included batching, mixing (that was done manually to get homogeneous material), compacting and moulding by hand machine and curing in water. After 28 days of curing, the concrete blocks were tested in the laboratory on compressive strength, water absorption ratio and density. The results showed that the blocks produced with 100% recycled aggregates were weaker than those with natural aggregates. However, the results also showed that there is a possibility of recycling the C&D waste into building material because 85% of the tested concrete block specimens from recycled aggregates achieved a compressive strength of 7 N/mm2, which is defined as the minimum required load bearing capacity in Tanzania. Therefore, the C&D waste could be a potential resource for building material production for sustainable construction in Tanzania rather than discarding it. Further work should focus on the economic feasibility of production of concrete blocks with recycled aggregates in Tanzania.  相似文献   

11.
The lean production philosophy has been applied in the construction industry to reduce waste and increase efficiency. It is until recently that the lean philosophy has proven to be effective to meet the challenges of sustainable development. Many studies have shown that lean philosophy can be applied in precast concrete factories to lower inventory, reduce waste and increase efficiency. However, the precast concrete installation cycle should not be overlooked following a life cycle perspective. This study adopts a weighted factor model comprising 30 contractors in the Singapore construction industry and a case study. Construction site layout management practices are investigated using the weighted factor model. Strategies to improve the construction site layout are presented in a case study. The results indicated that there are many non-value adding activities in the site layout management practices that contribute to an increase in the carbon emissions level. Little consideration of green building materials, improper specifications of the precast concrete products, lack of an uninterrupted workflow, and inaccurate estimation of seem to be the most important ones. The results provide good practice guidance and can be used as a checklist for contractors to identify the NVA activities in the installation sites to achieve low-carbon installation. The results will also be useful for regulatory agencies to provide recommendations for contractors to improve the installation procedure and reduce carbon emissions.  相似文献   

12.
The ability for small islands to meet sustainability goals is exacerbated by the costs of transporting goods on, and then, wastes off the islands. At small scales, recycling can be prohibitive and complicated by labor costs; the need to profitably recycle and manage solid waste output from tourism is complicated by scale and available technologies. A multi-year study documents the amount of solid waste generated on Great Exuma (Exuma), The Commonwealth of The Bahamas since 2010 with one year of benchmarking, then limited recycling of food waste generation by an all-inclusive resort, Sandals Emerald Bay (SEB). For the island of Exuma, the rapid increase in the rate of accumulation of solid waste associated with a large destination resort has led to an increase in pests such as rats and flies, along with an increased occurrence of fires associated with unburied solid waste. Solid waste has accumulated faster than the island solid waste management can absorb. SEB kitchen and hotel operations contributes an estimated 36% of all solid waste generated on the island, about 1752 t1 out of a total of 4841 t generated on the island in 2013 (exclusive of vegetation waste). Based on 4 weeks of benchmarking, 48.5% of all the waste coming out of the SEB resort is compostable, organic waste, but waste composition varies widely over time. Exuma Waste Management (EWM) and Recycle Exuma (RE), both privately-held Bahamian businesses, worked for one year (2012–2013) with SEB resort to implement a benchmarking and pilot recycling project to meet Earth Check green resort certification requirements. This paper outlines the costs and resources required for food waste recycling and some barriers to implementing more effective solid waste management for the tourism industry on small islands.  相似文献   

13.
Construction industry consumes about half of all material resources taken from nature, and generates a large portion of waste to landfill. A way of tackling negative environmental impacts impending from continuous material extraction and waste generation is the use of recycled materials for construction projects. However, the use of recycled materials is yet to become a commonplace in construction industry. This study evaluates the factors hampering the use of recycled products in UK construction industry as well as strategies that could be adopted to enhance its use in the industry. In order to identify the impediments and critical strategies, a two-fold methodical approach was used. An unstructured interview preceded a quantitative questionnaire survey which was used to elicit broader industry practitioners’ opinion.The study shows that designers rarely specify recycled products. This is due to lack of adequate information about quality and market availability of the products, negative perception from clients, and unexpectedly high cost of the products, despite its perceived low quality. The study suggests that a number of strategies could be adopted to promote the use of the products. These include allocation of points to the use of recycled products in sustainable design appraisal tools, governments legislative measures, improved collaboration between designers, contractors and materials suppliers, contractors involvement at earlier stage of design, improved education of the professionals about the products, and the use of tax break to influence the cost of the products. The findings of this study would therefore help policy makers, manufacturers and construction professionals to identify the factors hampering the use of recycled products for construction projects as well as the strategies that could be adopted in order to create market for the products.  相似文献   

14.
Sustainable practices at construction sites should be considered from the start of the project, meaning during the design phase. A model for the implementation of sustainability at a site is an important management tool, and its adoption can indicate good practices and propose an assessment of local conditions. Thus, the main contribution of this article is to propose a practical model to evaluate the level of implementation of sustainable practices at construction sites. The model was based on sustainability certifications and validated at six construction sites in Brazil. The results indicate that construction companies that possess environmental certifications have better levels of implementation of good practices at their work sites. However, it was noted that it is not necessary for a company to obtain an environmental certification; rather, it is necessary for sustainability strategies to become corporate culture.  相似文献   

15.
由于社会和经济因素的要求,当今的建筑生命周期要最大程度地完成圆形的循环过程,即重新使用拆建物料制造新产品。循环经济的大背景下,承建商通过坚实的理论基础,采用分层次的方法来进行建筑废弃物的管理。文中总结了两种方法的优点和缺点,进行了混合回收与源头分离两种方法的比较研究。最值得注意的是两个不同的意向方案:绿色星球计划和ICC-ESSAVETM方案。突出的可持续认证和设计方案及绿色星球计划侧重的能源效率模型时常被繁重调试系统的LEED所青睐。一旦被国际编码理事会所批准,这些文件可以在LEED的评分系统下或绿色星球计划中,帮助其寻找资格评分。文章最后分析了建筑废弃物的回收流程,并得出结论:高达95%的建筑和拆迁建筑废弃物都可以回收;回收相比垃圾填埋更节省资金;源头分离较混合回收需要更多的管理和劳动力,但能获得更大的经济利益;承建商应该组织和管理现场的回收工作。  相似文献   

16.
《Resources Policy》2002,28(1-2):39-47
Material flows of concrete from construction and demolition (C&D) waste in Taiwan have grown considerably over the last two decades, Hsiao et al. (2001). This increased flow puts pressure on limited national disposal capacity and has indirectly caused ecological damage to domestic riparian zones used as sources of natural aggregate. Using existing statistics and literature sources for C&D waste generation in Taiwan we have developed a dynamic model of domestic material flows of concrete waste and employ statistical analyses to obtain projections of future material flows. Our major findings are: (1) Taiwan’s rate of waste concrete generation in 2001 for the residential and commercial construction industry was approximately 2.4 Million Metric Tons (MMT) per year, averaging 0.11 metric tons of waste concrete generated annually by each Taiwanese; (2) Around the year 2009, the national rate will more than triple to exceed the spike in C&D concrete waste generation that occurred after the Chi Chi earthquake 9/21/99, 8.5 MMT. (3) Aside from pilot-scale development of waste concrete utilization technology, nationwide recycling rates remain negligible. Without resource recovery, the volume of C&D waste generation by 2009 is projected to occupy nearly 7% of all existing and planned domestic landfill capacity. A target is established to raise resource recovery rates for waste concrete to 50% by 2005 and a 100% nationwide recycling rate by 2009.  相似文献   

17.
Solid waste recycling and recovery approach can be a sustainable and effective waste management system in many growing cities of the least developed countries. In the course of achieving proper solid waste management, a lot of efforts in these countries have, however, been focused more on collection and disposal and ignored waste recycling which can result into income generation, employment creation and reduction of the waste quantities that will finally require disposal in the existing municipal landfills or disposal sites. This paper reports the findings of a study on solid waste recycling in a selected semi-planned settlement in Dar es Salaam City, Tanzania. The objective of the study was to describe the existing solid waste management in the study area with a view to identifying the waste generation rates, types of the wastes and determine the amount of waste from the settlement that can be recycled for the purpose of income generation and reduction of the total amount of waste to be disposed of. Findings from this study revealed that waste generation rate in the study area was 0.36 kg per person per day, and that out of the 14 600 kg of recyclable waste generated per year, 8030 kg or 55% can be recycled and generate a per capita income of Tsh 834 000 for waste recyclists which is more than twice the official minimum annual wage (Tsh 360 000) in Tanzania at the time of the study. The study also revealed that effective waste recycling in the study area would result in the reduction of the total waste that need to be transported for final disposal by 11%.  相似文献   

18.
In this study, an interval-parameter two-stage mixed integer linear programming (ITMILP) model is developed for supporting long-term planning of waste management activities in the City of Regina. In the ITMILP, both two-stage stochastic programming and interval linear programming are introduced into a general mixed integer linear programming framework. Uncertainties expressed as not only probability density functions but also discrete intervals can be reflected. The model can help tackle the dynamic, interactive and uncertain characteristics of the solid waste management system in the City, and can address issues concerning plans for cost-effective waste diversion and landfill prolongation. Three scenarios are considered based on different waste management policies. The results indicate that reasonable solutions have been generated. They are valuable for supporting the adjustment or justification of the existing waste flow allocation patterns, the long-term capacity planning of the City's waste management system, and the formulation of local policies and regulations regarding waste generation and management.  相似文献   

19.
This paper introduces a violation analysis approach for the planning of regional solid waste management systems under uncertainty, based on an interval-parameter fuzzy integer programming (IPFIP) model. In this approach, several given levels of tolerable violation for system constraints are permitted. This is realized through a relaxation of the critical constraints using violation variables, such that the model's decision space can be expanded. Thus, solutions from the violation analysis will not necessarily satisfy all of the model's original constraints. Application of the developed methodology to the planning of a waste management system indicates that reasonable solutions can be generated through this approach. Considerable information regarding decisions of facility expansion and waste flow allocation within the waste management system were generated. The modeling results help to generate a number of decision alternatives under various system conditions, allowing for more in-depth analyses of tradeoffs between environmental and economic objectives as well as those between system optimality and reliability.  相似文献   

20.
One of the major hindrances to waste minimisation on a construction site is the difficulty in establishing a methodology and using this methodology to benchmark future construction projects. This paper introduces SMARTWaste, a software tool that has been used to audit, reduce and target waste arisings on a construction site. This tool tries to link the construction process and the waste hierarchy. That is reducing waste on a construction site rather than landfilling it. Three applications of the SMARTWaste software will be discussed using case studies from three different types of construction. An evaluation of these case studies shows that, by implementing a waste minimisation scheme on-site, you can improve material recovery for reuse. Also, by using the waste arisings as a benchmark you can reduce your waste arisings on future sites. Application of SMARTWaste or a similar waste minimisation tool on a wider basis could reduce waste arisings and could result in a built environment that consumed less natural resources and energy, and also produced less pollution and waste. Such a built environment would be environmentally and socially more responsive and responsible.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号