首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
ABSTRACT. The water resources manager, concerned with providing for citizen needs for water in all its varied aspects, is obliged to consider the public interest in his decision making. But the public interest, although inferring the superiority of public over purely private interests, is more of a concept of political ethics than an operational objective. Recent attacks on water resources developments place in question just how responsive the water resources manager has been to the public at large during the planning process. The recent broadening of planning objectives beyond economic efficiency to include greater attention to social goals is an encouraging development. Efforts should be expanded toward greater citizen participation and more attention should be given to sampling surveys to determine citizen attitudes on water resources proposals. In the last analysis, the decision-making process must combine the expertise of the water resources manager and the participation of the people through the political process.  相似文献   

2.
ABSTRACT: Most southwestern cities were founded along rivers or in areas having springs or readily available ground water. Because of the generally sparse precipitation, the renewable fresh water supply in the Southwest is smaller than most other areas of the United States. Despite the arid climate, water use has increased rapidly, first in the form of irrigation, and more recently the use in cities. This has caused extensive development of local water resources and overdraft of ground water basins in some areas. It is difficult to implement new local supplies and importation projects due to a myriad of environmental and legal constraints and a general shortage of public funds. Various opportunities and plans for water management, both on the demand and supply sides, are discussed. Evolving water strategies in four metropolitan areas - El Paso, Albuquerque, Las Vegas, and Phoenix - and issues regarding the Central Arizona Project are presented.  相似文献   

3.
ABSTRACT As urban expansion outstrips water supplies, the usual solution is to build pipelines to bring in water from sources farther afield. Such water supplies may act as either a leader of urban development or as a follower. In either case, this engineering approach to the provision of water has fostered less than optimal utilization of regional water and land resources for urban growth. More efficient utilization of these resources is achieved when water supply development and urban growth planning are conjoint activities. Water supply planners and land use planners, working together, are able to generate and evaluate the full range of urban development options, including water demand management through conservation. Preferred regional growth plans are achieved using the best mix of water supply and urban growth. The result is a reduced rate of water supply development and a reduction of urban expansion on prime lands. This partnership approach is demonstrated for the Calgary Region under two levels of water conservation.  相似文献   

4.
This paper describes the successful application of a multiobjective planning framework, incorporating substantial public involvement, to a major water resources decision involving intense confilcts. The study was initiated to help resolve more than a decade of controversy over a project proposed to control flooding and provide regulatory storage in the Phoenix, Arizona, area. The public was actively involved in the development of study goals and the specification of acceptable tradeoffs between multiple objectives. A wide range of structural and nonstructural alternatives was formulated and evaluated in relation to these objectives, and broad-based support was developed for a new plan. Reasons for the successful outcome are discussed, as well as implications for water resources planning under the new Federal Principles and Guidelines.  相似文献   

5.
ABSTRACT: The 15 federal-state interagency river basin studies (designated as Type 2 or Level B in the planning program of the Water Resources Council) of the 1960's brought together in each of the study regions, in many cases for the fist time, state and federal water resources agencies, and afforded an opportunity for coordination. Examination of the studies, however, reveals that many organizational problems remain to be solved in preparing truly comprehensive plans that effectively integrate and balance the diverse values held by study participants and concerned citizens. Burgeoning changes in state and federal laws, in planning concepts, and in public attitudes influenced the studies. Increased interest in the environment and greater emphasis on a multiple objective approach to planning for example, had significant effect. The type of organization used for carrying out these studies was a coordinating committee with one of the agencies - in most cases, the Corps of Engineers, - serving as lead agency. Some of the observed weaknesses of this arrangement were the lack of an effective mechanism for screening individual agency project proposals; unbalanced participation of agencies - for example, construction vs. non-construction, state vs. federal; agency representatives without sufficient delegated authority; insufficient control of the planning organization over individual agency participation and punctuality; and lack of emphasis on plan formulation and public participation. Suggested improvements, some of which are already being implemented in more recent studies include centralized planning staff and funding, formalized work agreements, a dynamic and continuous planning process with mechanisms for monitoring technological and social changes and evaluating planning effectiveness, planning guidelines and evaluative criteria, and a formalized training program for planners.  相似文献   

6.
As freshwater resources become more scarce and water management becomes more contentious, new planning approaches are essential to maintain ecologic, economic, and social stability. One technique involves cooperative modeling in which scientists and stakeholders work together to develop a computer simulation model to assist in planning efforts. In the Middle Rio Grande region of New Mexico, where water management is hotly debated, a stakeholder team used a system dynamics approach to create a computer simulation model to facilitate producing a regional plan. While the model itself continues to be valuable, the process for creating the model was also valuable in helping stakeholders jointly develop understanding of and approaches to addressing complex issues. In this paper, the authors document results from post‐project interviews designed to identify strengths and weaknesses of cooperative modeling; to determine if and how the model facilitated the planning process; and to solicit advice for others considering model aided planning. Modeling team members revealed that cooperative modeling did facilitate water planning. Interviewees suggested that other groups try to reach consensus on a guiding vision or philosophy for their project and recognize that cooperative modeling is time intensive. The authors also note that using cooperative modeling as a tool to build bridges between science and the public requires consistent communication about both the process and the product.  相似文献   

7.
ABSTRACT: The Metropolitan Water District of Southern California has for more than 70 years shaped the development of an immense urban region. The district's current strategic planning process therefore could have substantial effects on regional water planning and management. The rate restructuring phase of the planning process has produced a multiple component, cost of service based framework. This paper describes that framework as well as some criticisms that have been directed toward it. The rate restructuring was shaped, and for a while stalled, by old disputes among member agencies over rights to water supplied by Metropolitan. That controversy has diverted attention from the resource management implications of the rate structure. This paper presents an alternative future focused approach to regional integrated water resource planning for Southern California based on projections of current trends and anticipation of future events. This discussion raises the question of how regional integrated water resources planning of this sort may proceed, and what role Metropolitan will play in that process.  相似文献   

8.
The development of Watershed Management Plans (WMPs) in urban areas aids municipalities in allocating resources, engaging the public and stakeholders, addressing water quality regulations, and mitigating issues related to stormwater runoff and flooding. In this study, 124 urban WMPs across the United States were reviewed to characterize historic approaches and identify emerging trends in watershed planning. Planning methods and tools were qualitatively evaluated, followed by statistical analyses of a subset of 63 WMPs to identify relationships between planning factors. Plans developed by a municipality or consultant were associated with more occurrences of hydrologic modeling and site‐specific recommendations, and fewer occurrences of characterizing social watershed factors, than plans authored by agencies, organizations, or universities. WMPs in the past decade exhibited greater frequency in the use of pollutant load models and spatially explicit hydrologic and hydraulic models. Project prioritization was found to increasingly focus on feasibility to implement proposed strategies. More recent plans additionally exhibited greater consideration for water quality, ecological health, and public participation. Innovation in planning methods and consideration of future watershed conditions are primary areas that were found to be deficient in the study WMPs, although analysis methods and tools continue to improve in the wake of advancing technology and data availability.  相似文献   

9.
Engineers have traditionally led the planning effort in water resources developments. The engineer's leadership role in water resources, as well as in many other planning activities, has been challenged by technical and scientific people as well as by the general public for insensitivity to social, aesthetic, ecological, and political problems created by planning. The paper draws attention to the fact that the engineer cannot continue to expect the role of leadership to fall to him unless he prepares himself properly for that role. However, it is brought out that the engineer, by his education and training, is still the best qualified among all the representatives of the various disciplines associated with water resources planning to lead the planning effort if he prepares himself for the task. The requirements for preparation for leading water resources planning are outlined.  相似文献   

10.
ABSTRACT Public interest in all governmental agency planning has increased greatly in recent years. The program of the Corps of Engineers for obtaining direct public input to its water resources planning is described. Implementing policies, guidelines, and activities are summarized. Experiences with public involvement are discussed. Some basic problems that have surfaced in carrying out the program are cited.  相似文献   

11.
ABSTRACT: The Truckee River is a vitally important water source for eastern California and western Nevada. It runs 100 miles from Lake Tahoe to Pyramid Lake in the Nevada desert and serves urban populations in greater Reno-Sparks and agricultural users in three Nevada counties. In the 1980s and 1990s, a number of state and local groups initiated projects which, taken collectively, have accomplished much to improve watershed management on the Truckee River. However, the task of writing a management plan for the entire watershed has not yet been undertaken. Key players in state, federal and local government agencies have instead chosen to focus specific improvement efforts on more manageable, achievable goals. The projects currently underway include a new agreement on reservoir operation, restoration of high priority sub-watersheds, public education and involvement, water conservation education, and water resource planning for the major urban population centers. The approach which has been adopted on the Truckee River continues to evolve as more and more people take an interest in the river's future. The many positive projects underway on the watershed are evaluated in terms of how well they meet the definition of the ambitious water resources strategy, “integrated watershed management.”  相似文献   

12.
Mathematical modeling of complex water resources System problems, particularly water pollution control, is aided by fizzy set theory. Public participation in large scale federally funded water resources and pollution control projects is now a federal requirement and practice of various planning agencies. However, no systems based model for quantifying and measuring the effectiveness of public participation is known to exist. In this paper, we report a fuzzy set based model developed for doing this in areawide water resources planning The model is essentially cascade in nature and employs the concepts of fuzzy pessimistic and optimistic aggregations to cluster and analyze the evaluations of the basic factors. Sample computations of the model are provided.  相似文献   

13.
ABSTRACT: The research project reported here surveyed planners in Coastal Zone Management and “208” programs in New England to determine the nature of their educational and experiential preparation for carrying out public participation functions, and to identify the planners’ own perceptions of the relative importance of those functions and their adequacy for performing them. Criteria for effective programming were developed and used as a standard for comparing various backgrounds with capability for performing necessary tasks. The research indicates that prior planning experience is more directly related to perceived adequacy than either academic or other experiential backgrounds. The survey also revealed a predominant emphasis on activities involving direct public conduct, e.g., organizing citizen advisory groups and conducting public meetings. The results of the analysis were used to make recommendations for curriculum topics that should be incorporated into the training of professional planners so that they will be better prepared to undertake public participation responsibilities. Those recommendations stress preparation for direct public contact, but also for training in other means of public involvement, such as media contact, that are not now being carried out with comparable emphasis or effectiveness.  相似文献   

14.
There is a growing concern about integrating biodiversity into urban planning, yet, discussions are concentrated on science-informed planning in general. Few have explored the integration of biodiversity in specific planning instruments, especially in African cities. This paper examines how and what components of biodiversity are integrated into master plans, medium-term plans, building codes, zoning codes and permits in Kumasi City, Ghana. There is limited integration of biodiversity in most planning instruments as they were mostly designed on the basis of health, safety and economy. Allied to lack of funding and public participation, biodiversity in Kumasi is under significant threat from rapid urban development. Creating an opportunity for popular participation and decentralizing the planning system could set the preconditions for local integration and revision of instruments. Simplifying the definition of biodiversity could increase local planners’ appreciation, understanding and their ability to make use of biodiversity data.  相似文献   

15.
ABSTRACT: The growing demands by the public for a more active role in planning have recently generated considerable interest among researchers and planners in the subject of public involvement techniques. Numerous surveys have found that standard public participation techniques (e.g., public hearings) by themselves are considered inadequate. Several techniques that have potential for overcoming some of the limitations of standard public involvement techniques have recently been developed. This paper describes several of these new techniques and analyzes each of them in terms of their potential utility in water resources planning.  相似文献   

16.
ABSTRACT: Recent Federal and some State legislation has enlarged the scope of permitted or required actions of local units of government in water resources management and protection. Much of the legislation encourages local units of government to introduce water resources planning measures which will be preventive instead of corrective. Extensive public works measures, environmental destruction and the threat to human life can thus be eliminated or reduced. Research has developed and tested a method for identifying the elements of a water resources protection program for small urbanizing watersheds which was technically adequate and socially acceptable to the communities implementing such programs. Research results suggest that deliberate efforts will be necessary to inform and educate local units of government as to the usefulness of the legislation; and that the program must reflect local natural resource conditions and local preferences for the method of accomplishing the protection. Successful implementation could be restrained by inertia of local units of government, a lack of tradition in such programs, and hostile existing agencies.  相似文献   

17.
With the threat of wildfire hanging over many communities in the Western and Southern United States, wildfire mitigation is evolving into a significant public responsibility for rural and urban edge county governments. Regional governance is an important piece of the effort to reduce wildfire risks although still weakly developed as a policy arena. This project explores two dimensions in which planning support systems can support regional governance: assessing patterns of wildfire risk accumulation; and, evaluating land use planning alternatives and their effects on cumulative risk levels. These tools are examined for regional governance using a prototype planning information system, the Alternative Growth Futures (AGF) tool, a scenario-building approach developed at the University of Colorado Denver. The project develops a hybrid urban growth model that integrates logistic regression techniques and methods for simulation of growth alternatives. This model is used to evaluate the attractiveness of undeveloped building sites with respect to natural amenities, distance to primary urban services and site characteristics such as slope. The model and scenario-testing framework are reasonably robust and suggest that regional spatial accounting methods have potential as a framework for inter-governmental and public discussion around wildfire planning.  相似文献   

18.
ABSTRACT: Public involvement in water resources planning is receiving much current attention, and there is a need to examine systematically how different public involvement techniques work in practice. The following techniques were among those used to involve the public in a recent Corps of Engineers’study of flooding on San Pedro Creek in Pacifica, California: a public workshop, citizen information bulletins (CIBs) and questionnaries. Interviews were held with 75 study participants to evaluate the effectiveness of these techniques. The interviews indicated that various study participants felt positively about the particular workshop format employed and about the use of a communications specialist to train workshop leaders. There were mixed reactions to the effectiveness of the CIBs and questionnaires. Although many individual citizens felt that the CIBs and questionnaires were useful, some of the Corps planners felt that CIBs and questionnaires would only be “cost-effective” on large studies and/or where the questionnaire response rate was high. The interviews led to a number of specific suggestions regarding how the extent of public involvement could be increased in future water resources planning studies.  相似文献   

19.
ABSTRACT: The state of Texas passed legislation in 1997 that established a process for developing a 50‐year state water plan through a bottoms‐up approach involving representation from at least 11 recommended special interest groups. Moorhouse Associates Inc. was contracted to develop and implement a Public Participation Plan for the South Central Texas Region. The two goals of the public process were to take planning information out to the public and to provide a format for bringing the public opinion back to the planning group. The overall goal of the project was to provide public input throughout the planning process that will facilitate the development of a water plan that is widely accepted by the public. By using county government to establish focus groups, participation was encouraged from all of the twenty‐one counties in the region. The tools used in the process included an Internet site, surveys, focus groups, public meetings, community group presentations, media communications, and newspaper clippings. The public participation process as implemented, maintained communication throughout the planning process and at key decision points. This ongoing communication helped alleviate an initial uneasiness with the integrated resource planning approach.  相似文献   

20.
Although planning scholars often argue that public participation improves implementation outcomes, this relationship is rarely empirically tested. This study investigates how public engagement, during planning and after plan adoption, impacts on the speed of local government sustainability plan implementation. It includes a correlation analysis of quantized in-depth interviews with sustainability planners in 36 American cities. The study finds that individual characteristics of public engagement, both during planning and after plan adoption, had statistically significant relationships to implementation speed, but in some cases this relationship was negative. The correlations imply that sustainability planners can make strategic choices to improve implementation speed through public participation in plan creation and after plan adoption. Alternatively, planners also make choices during participatory planning that slow implementation, a problematic outcome when the ultimate goal of a planning process is on-the-ground change.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号