首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Abstract: The determination of sediment and nutrient loads is typically based on the collection and analysis of grab samples. The frequency and regularity of traditional sampling may not provide representation of constituent loading, particularly in systems with flashy hydrology. At two sites in the Little Bear River, Utah, continuous, high‐frequency turbidity was used with surrogate relationships to generate estimates of total phosphorus and total suspended solids concentrations, which were paired with discharge to estimate annual loads. The high frequency records were randomly subsampled to represent hourly, daily, weekly, and monthly sampling frequencies and to examine the effects of timing, and resulting annual load estimates were compared to the reference loads. Higher frequency sampling resulted in load estimates that better approximated the reference loads. The degree of bias was greater at the more hydrologically responsive site in the upper watershed, which required a higher sampling frequency than the lower watershed site to achieve the same level of accuracy in estimating the reference load. The hour of day and day of week of sampling impacted load estimation, depending on site and hydrologic conditions. The effects of sampling frequency on the determination of compliance with a water quality criterion were also examined. These techniques can be helpful in determining necessary sampling frequency to meet the objectives of a water quality monitoring program.  相似文献   

2.
ABSTRACT: Dairy cow pastures and feeding areas around barns can be a significant source of nonpoint source pollutants to nearby streams. To help document the significance of these sources, nutrient export in streamfiow from a 56.7-ha, mostly agricultural, watershed located in southwestern North Carolina was monitored from August 1994 to January 1996. Total nitrogen and phosphorus export rates from the upper, predominantly pasture, part of the watershed were 18.0 and 1.4 kg/ha/yr, respectively, as measured by weekly grab sampling and 18.7 and 4.9 kg/halyr, respectively, as measured from storm event monitoring. Nitrogen and phosphorus export rates for the area between the monitoring sites, which included overgrazed cow holding and feeding areas and farm buildings, were 376 and 86 kgfhalyr, respectively, for grab sampling and 351 and 160 kg/ha/yr, respectively, for storm event monitoring. To estimate the amount of reduction from nonpoint source controls necessary to effect a significant reduction in pollutant loading, statistical analyses of the load data were conducted. The analyses for the five pollutants monitored showed that total suspended solids would require the greatest reduction (34.6 percent for weekly grab and 33.6 percent for storm) in loading after the implementation of controls for statistical significance. Nitrate plus nitrite was found to require the least reduction (12.6 percent for weekly grab). Pollutant export rates computed from weekly grab samples and storm event samples used separately were compared to corresponding export rates computed from combining grab and storm event samples to assess the differences in monitoring schemes.  相似文献   

3.
ABSTRACT: The objective of this investigation was to determine the effect of sampling frequency and sampling type on estimates of monthly nutrient loads and flow‐weighted nutrient concentrations in a constructed wetland. Phosphorus and nitrogen loads and concentrations entering and leaving a subtropical wetland (the Everglades Nutrient Removal Project, ENRP) were calculated on the basis of three sampling frequencies. The first frequency included weekly composite samples (three daily samples composited for one week) and grab samples from August 1994 to July 1997, representing a base‐line condition for comparison with results using reduced sampling frequencies. The second and third sampling frequency included three and two composite samples per month, respectively, drawn from the weekly samples. Total phosphorus and nitrogen loads calculated using two and three samples per month were almost identical to results based on four samples per month (least‐squares regression coefficients ranged from 0.96 to 0.98). Results of monthly mean flow‐weighted nutrient concentrations, obtained using reduced sampling frequencies, also were strongly correlated to concentrations calculated using the base‐line sampling frequency (r2ranged from 0.82 to 0.93). Grab samples did not always provide good estimates of loads or concentrations, particularly at the inflow when data were highly variable. From the results of this study, we can recommend that bi‐weekly composite sampling be used to monitor nutrient concentrations and loads discharged from larger‐scale Everglades Stormwater Treatment Areas (STAs) now under construction. Because there are high costs associated with water sample collection and processing, studies to identify optimal sampling frequencies should be a key feature in the design of any comprehensive wetland‐monitoring program.  相似文献   

4.
ABSTRACT: Developing a mass load estimation method appropriate for a given stream and constituent is difficult due to inconsistencies in hydrologic and constituent characteristics. The difficulty may be increased in flashy flow conditions such as karst. Many projects undertaken are constrained by budget and manpower and do not have the luxury of sophisticated sampling strategies. The objectives of this study were to: (1) examine two grab sampling strategies with varying sampling intervals and determine the error in mass load estimates, and (2) determine the error that can be expected when a grab sample is collected at a time of day when the diurnal variation is most divergent from the daily mean. Results show grab sampling with continuous flow to be a viable data collection method for estimating mass load in the study watershed. Comparing weekly, biweekly, and monthly grab sampling, monthly sampling produces the best results with this method. However, the time of day the sample is collected is important. Failure to account for diurnal variability when collecting a grab sample may produce unacceptable error in mass load estimates. The best time to collect a sample is when the diurnal cycle is nearest the daily mean.  相似文献   

5.
Effluent subsamples are usually aggregated into flow or time proportional samples before analysis. Although this provides information on average process conditions, that on process variability is lost by compositing. Fisher's information is defined and used to estimate the loss due to compositing. The results of simulations based on parameters derived from actual waste streams support the fact that random grabs serve as well as composite samples for monitoring purposes. These findings favor changes in regulatory practice to allow compliance to be demonstrated by grab sample averages. Reporting requirements based on moving averages are shown to be inferior to those based on averages taken over nonoverlapping time periods.  相似文献   

6.
ABSTRACT: Methods of calculating uncertainty in estimates of serial correlation coefficients, and correcting for bias in short and medium length (less than 50 data point) records, are presented. Uncertainty and bias in the estimation of serial correlation coefficients for ground water quality data is shown to be considerable and to result in inaccurate calculation of the sampling frequencies for monitoring purposes. The methods are applied to a ground water data set consisting of 87 monthly measurements of nitrate concentrations. The variation in serial correlation coefficients with variation of record length is examined. The optimum sampling frequencies for detection of changes in ground water nitrate concentrations are estimated.  相似文献   

7.
The variability of indicator bacteria over a fine resolution time scale on the order of minutes has yet to be fully understood. In this study, we collected more than 700 Escherichia coli samples at a 10‐ and 30‐min resolution in an urban watershed in Houston. A Bacteria Diurnal Sag (BDS) marked with daytime exponential decay followed by an exponential nighttime regeneration was observed. This pattern was observed during all sampled events but varied depending on other variables. The concentrations during a 24‐h period varied 1 to 5 orders of magnitude and the fecal load was at least 10 times lower than what would be obtained using a single morning E. coli measurement, the typical sampling scheme in most monitoring programs. Decay rates, ranging from 3.67 to 24.7/day, decreased E. coli concentrations to below the water‐quality standards from 14:00 to 18:00 h and were strongly influenced by water temperatures and solar radiation intensities. Rapid regeneration occurred on the order of 9.41 to 64.1/day allowing E. coli concentrations to return to their pre‐decay levels. The data indicated that four to six samples taken between 06:00 and 18:00 h may be sufficient to define the BDS depending on stream conditions, and that a threshold concentration of approximately 100 MPN/dl (most probable number in a deciliter) existed for the studied urban watershed. These findings have significant implications for water‐quality monitoring, regulation, and compliance.  相似文献   

8.
The purpose of this project was to assess the effect of estimating total suspended solids (TSS) concentrations from turbidity on TSS loads for streams in the Robeson Creek watershed. Discharge was monitored continuously and base‐flow grab and storm event composite samples were collected and analyzed for TSS and turbidity from five sites during five years of monitoring. For base‐flow samples, the TSS‐turbidity relationship for all five sites was poor indicating that TSS concentrations in base flow cannot be estimated from a TSS‐turbidity relationship. To test the effect of analyzing fewer samples, TSS from every third and the first 20 samples collected from each site was used to develop TSS‐turbidity relationships. In addition, the TSS‐turbidity relationship developed from the most downstream site was used to estimate TSS concentrations from turbidity measured at the other four sites. For four of the five sites, analyzing every third sample for TSS and using the TSS‐turbidity relationship to estimate the missing TSS concentrations would result in mean TSS loads that were not significantly different from the observed. Using the TSS‐turbidity relationship from the outlet to estimate TSS from turbidity measured at the other four sites resulted in significantly different mean TSS loads at three of the four sites. These results indicate that estimating TSS concentrations from turbidity using a TSS‐turbidity relationship developed from a subset of the overall dataset should be done with great caution.  相似文献   

9.
In the field of watershed modeling, the impact of measurement uncertainty (MU) on calibration results indicates the potential issue of inaccurate model predictions. It is important to note that MU refers to the uncertainty in measured data such as flow and nutrient values that are used to evaluate model outputs. The calculation of error statistics assuming measured data are deterministic may not be appropriate as has been frequently stated in literature. Although MU can affect model calibration results, it is rarely incorporated in modeling practice. MU can be incorporated in two schemes: explicitly incorporated (MU‐EI) during model calibration and post‐processed (MU‐PP) after calibration is completed. In this study, both schemes are implemented in a case study of the Arroyo Colorado Watershed, Texas. Unexpectedly, no substantial differences were observed between each scheme for flow predictions. Although MU did not cause dramatic differences in most sediment and NH4‐N predictions, error statistics were affected in cases with MU greater than 50%, especially for sediment and NH4‐N. Therefore, it is concluded that MU may not exert a significant impact on model predictions until certain threshold is reached. This study demonstrates that high levels of uncertainty in measured calibration/validation data significantly affect parameter estimation, especially in the auto‐calibration process.  相似文献   

10.
Evaluation of wetland extent and changes in extent is a foundation of many wetland monitoring and assessment programs. Probabilistic sampling and mapping provides a cost‐effective alternative to comprehensive mapping for large geographic areas. One unresolved challenge for probabilistic or design‐based approaches is how best to monitor both status (e.g., extent at a single point in time) and trends (e.g., changes in extent over time) within a single monitoring program. Existing wetland status and trends (S&T) monitoring programs employ fixed sampling locations; however, theoretical evaluation and limited implementation in other landscape monitoring areas suggest that alternative designs could increase statistical efficiency and overall accuracy. In particular, designs that employ both fixed and nonfixed sampling locations (alternately termed permanent and temporary samples), termed sampling with partial replacement (SPR), are considered to efficiently and effectively balance monitoring current status with detection of trends. This study utilized simulated sampling to assess the performance of fixed sampling locations, SPR, and strictly nonfixed designs for monitoring wetland S&T over time. Modeled changes in wetland density over time were used as inputs for sampling simulations. In contrast to previous evaluations of SPR, the results of this study support the use of a fixed sampling design and show that SPR may underestimate both S&T.  相似文献   

11.
Load estimates obtained using an approach based on statistical distributions with parameters expressed as a function of covariates (e.g., streamflow) (distribution with covariates hereafter called DC method) were compared to four load estimation methods: (1) flow‐weighted mean concentration; (2) integral regression; (3) segmented regression (the last two with Ferguson's correction factor); and (4) hydrograph separation methods. A total of 25 datasets (from 19 stations) of daily concentrations of total dissolved solids, nutrients, or suspended particulate matter were used. The selected stations represented a wide range of hydrological conditions. Annual flux errors were determined by randomly generating 50 monthly sample series from daily series. Annual and interannual biases and dispersions were evaluated and compared. The impact of sampling frequency was investigated through the generation of bimonthly and weekly surveys. Interannual uncertainty analysis showed that the performance of the DC method was comparable with those of the other methods, except for stations showing high hydrological variability. In this case, the DC method performed better, with annual biases lower than those characterizing the other methods. Results show that the DC method generated the smallest pollutant load errors when considering a monthly sampling frequency for rivers showing high variability in hydrological conditions and contaminant concentrations.  相似文献   

12.
ABSTRACT: Various temporal sampling strategies are used to monitor water quality in small streams. To determine how various strategies influence the estimated water quality, frequently collected water quality data from eight small streams (14 to 110 km2) in Wisconsin were systematically subsampled to simulate typically used strategies. These subsets of data were then used to estimate mean, median, and maximum concentrations, and with continuous daily flows used to estimate annual loads (using the regression method) and volumetrically weighted mean concentrations. For each strategy, accuracy and precision in each summary statistic were evaluated by comparison with concentrations and loads of total phosphorus and suspended sediment estimated from all available data. The most effective sampling strategy depends on the statistic of interest and study duration. For mean and median concentrations, the most frequent fixed period sampling economically feasible is best. For maximum concentrations, any strategy with samples at or prior to peak flow is best. The best sampling strategy to estimate loads depends on the study duration. For one‐year studies, fixed period monthly sampling supplemented with storm chasing was best, even though loads were overestimated by 25 to 50 percent. For two to three‐year load studies and estimating volumetrically weighted mean concentrations, fixed period semimonthly sampling was best.  相似文献   

13.
流域污染物通量测算方法研究   总被引:1,自引:0,他引:1  
流域水系内污染物通量不仅能够用于评价各类污染源的水污染物入河负荷,也是对流域污染特征,水污染物在河流水体中复杂迁移、转化过程的最直观反应。准确测算流域水系内污染物跨界通量及其时空分布是进行流域水环境风险预警和风险管理的重要前提之一。针对目前多种污染物通量测算方法在进行污染物年通量估算时,结果不确定性大这一突出问题,以流域水质监测站年内逐日流量、悬浮颗粒物监测数据作为悬浮颗粒物年通量参考值,基于以月、半月、周为周期的监测策略,将逐日流量、悬浮颗粒物监测数据重新筛选抽样构造,由此,系统分析了不同流域集水面积、污染通量监测频次和目前常用通量估算方法对污染物年通量估算不确定性的影响。所得方法和结论可为进一步制定流域污染物通量的测算规范提供方法指引和技术支持。  相似文献   

14.
Abstract: Fecal coliform (FC) bacteria in coastal waters impair the use of these waters for shellfish harvesting and recreation. This study was designed to quantify and compare FC levels and export in two coastal watersheds with different land uses. Continuous monitoring of rainfall and discharge at three sites in the Jumping Run Creek watershed and one site in the Pettiford Creek watershed were conducted during a 4.5‐year period. Primary land use in the drainage area of one of the three Jumping Run Creek sites is low density industrial, while the other two are residential. Land use in the Pettiford Creek watershed is managed national forest. Nonstorm or base‐flow grab and flow‐proportional storm‐event samples were collected and analyzed for turbidity, conductivity, suspended sediment, nitrogen, phosphorus, and FC. Geometric mean FC levels for the Jumping Run Creek monitoring sites ranged from 593 to 2,096 mpn/100 ml, while the mean level at the Pettiford Creek site was 191 mpn/100 ml. Levels of most other parameters were greater in storm discharge from the Jumping Run Creek sites as compared to Pettiford Creek indicating that pollutant export from a watershed increases with development. Statistical analysis of the monitoring data suggested that FC levels in stormwater samples consistently increased with storm rainfall, but were not consistently correlated with any other parameter, including total suspended solids. Multivariate analysis indicated that the weekly FC export for each of the four sites was lowest during the December‐February quarter. Export was highest during the spring and summer at the Jumping Run Creek sites, while for the Pettiford Creek site, FC export was highest during September‐November. The cause of the seasonal variability was unknown but was thought to be associated with human activity in the watersheds.  相似文献   

15.
Abstract:  Data interpretation and visualization software tools with geostatistical capabilities were adapted, customized, and tested to assist the Chesapeake Bay Program in improving its water‐quality modeling protocols. Tools were required to interpolate, map, and visualize three‐dimensional (3D) water‐quality data, with the capability to determine estimation errors. Components of the software, originally developed for ground‐water modeling, were customized for application in estuaries. Additional software components were developed for retrieval, and for pre‐ and post‐ processing of data. The Chesapeake Bay Program uses the 3D mapped data for input to the Bay water‐quality model that projects the future health of the Bay and its tidal tributary system. In determining water‐quality attainment criteria, 3D kriging estimation errors are needed as a statistical measure of uncertainty. Furthermore, given the high cost of installing and operating new monitoring stations, geostatistical techniques can assist the Chesapeake Bay Program in the identification of suitable data collection locations. Following the evaluation, selection, and development of the software components phase, 3D ordinary kriging techniques with directional semi‐variograms to account for anisotropy were successfully demonstrated for mapping 3D fixed station water‐quality data, such as dissolved oxygen and salinity. Additionally, an improved delineation tool was implemented to simulate the upper and lower pycnocline boundary surfaces allowing the segregation of the interpolated 3D data into three separate zones for a better characterization of the pycnocline layer.  相似文献   

16.
A device to trigger automatic pumping samplers at discrete stages on headwater streams in southeastern Oklahoma was developed. The magnetic switch column employs a sequence of magnetic reed switches wired in parallel and set at 0.03 m (0.10 ft) intervals. A magnetic float inside the column closes the reed switches, therby triggering the sampler as stage rises and falls. The columns were constructed from inexpensive, readily-available materials. Following installation and field calibration, the columns provided relaible and representative sampling during 12 storms, at three sites. The magnetic switch column may be used in a wide range of research and monitoring sites to improve water quality sampling.  相似文献   

17.
ABSTRACT: To assure attainment and maintenance of desired water quality levels in our rivers and streams, systematic monitoring must be performed. A preliminary phase of the design of water quality surveillance systems is the specification of sampling frequencies and station locations throughout the basin; that is, the development of an adequate space/time sampling plan. The purpose of this paper is to present some quantitative methods which have been developed to identify candidate sets of sampling frequencies and station locations, and to establish priorities for implementing the different frequencies and locations. These methods are useful in the cost/effectiveness trade-off analyses in surveillance system design, and are based on the surveillance system objective of pollution abatement in which it is desired to detect violations in state-federal water quality standards. A spatial priority measure is developed which is dependent both on the water quality profile in the stream and on the information obtained from monitoring stations located in other reaches. Also, a temporal sampling priority rating is presented which is a measure of the effectiveness of the surveillance system with respect to its ability to detect the violations in the standards. To illustrate the quantitative methods, the procedures are applied to the Wabash River Basin.  相似文献   

18.
ABSTRACT: The sampling of streams and estimation of total loads of nitrogen, phosphorus, and suspended sediment play an important role in efforts to control the eutrophication of Lake Tahoe. We used a Monte Carlo procedure to test the precision and bias of four methods of calculating total constituent loads for nitrate‐nitrogen, soluble reactive phosphorus, particulate phosphorus, total phosphorus, and suspended sediment in one major tributary of the lake. The methods tested were two forms of the Beale's Ratio Estimator, the Period Weighted Sample, and the Rating Curve. Intensive sampling in 1985 (a dry year) and 1986 (a wet year) provided a basis for estimating loads by the “worked record” method for comparison with estimates based on resampling actual data at the lower intensity that characterizes the present monitoring program. The results show that: (1) the Period Weighted Sample method was superior to the other methods for all constituents for 1985; and (2) for total phosphorus, particulate phosphorus, and suspended sediment, the Rating Curve gave the best results in 1986. Modification of the present sampling program and load calculation methods may be necessary to improve the precision and reduce the bias of estimates of total phosphorus loads in basin streams.  相似文献   

19.
Total suspended solids (TSS) and total phosphorus (TP) have been shown to be strongly correlated with turbidity in watersheds. High‐frequency in situ turbidity can provide estimates of these potential pollutants over a wide range of hydrologic conditions. Concentrations and loads were estimated in four western Lake Superior trout streams from 2005 to 2010 using regression models relating continuous turbidity data to grab sample measures of TSS and TP during differing flow regimes. TSS loads estimated using the turbidity surrogate were compared with those made using FLUX software, a standard assessment technique based on discharge and grab sampling for TSS. More traditional rating curve methodology was not suitable because of the high variability in the particulates vs. discharge relationship. Stream‐specific turbidity and TSS data were strongly correlated (r2 = 0.5 to 0.8; p < 0.05) and less so for TP (r2 = 0.3 to 0.7; p < 0.05). Near‐continuous turbidity monitoring (every 15 min) provided a good method for estimating both TSS and TP concentration, providing information when manual sample collection was unlikely, and allowing for detailed analyses of short‐term responses of flashy Lake Superior tributaries to highly variable weather and hydrologic conditions while the FLUX model typically resulted in load estimates greater than those determined using the turbidity surrogate, with 17/23 stream years having greater FLUX estimates for TSS and 18/23 for TP.  相似文献   

20.
Since 1980, the Lake Tahoe Interagency Monitoring Program (LTIMP) has provided stream‐discharge and water quality data—nitrogen (N), phosphorus (P), and suspended sediment—at more than 20 stations in Lake Tahoe Basin streams. To characterize the temporal and spatial patterns in nutrient and sediment loading to the lake, and improve the usefulness of the program and the existing database, we have (1) identified and corrected for sources of bias in the water quality database; (2) generated synthetic datasets for sediments and nutrients, and resampled to compare the accuracy and precision of different load calculation models; (3) using the best models, recalculated total annual loads over the period of record; (4) regressed total loads against total annual and annual maximum daily discharge, and tested for time trends in the residuals; (5) compared loads for different forms of N and P; and (6) tested constituent loads against land use‐land cover (LULC) variables using multiple regression. The results show (1) N and P loads are dominated by organic N and particulate P; (2) there are significant long‐term downward trends in some constituent loads of some streams; and (3) anthropogenic impervious surface is the most important LULC variable influencing water quality in basin streams. Many of our recommendations for changes in water quality monitoring and load calculation methods have been adopted by the LTIMP.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号