Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

2.
Environmental impact assessment (EIA) has been, and remains for the time being, a very important tool of environmental management — though not always for the reasons one would expect. Major achievements of EIA have been through indirect benefits that have had little recognition to date, particularly the achievements of its stimulative and educative roles. However, EIA is evolving as a planning tool and will continue to do so, and we argue that, in time, we will be able to go beyond EIA as a separate stand alone process. We indicate the requirements for its eventual absorption into project planning and design, and the concomitant need to fully incorporate environmental issues in land use planning to address those matters that cannot be addressed on a project-by-project basis.  相似文献   

3.
4.
Follow-up is a vital component of Environmental Impact Assessment (EIA), being essential for understanding assessment outcomes. Long-standing international best practice principles for EIA follow-up are reviewed, and revisions proposed, based on workshops with academics and practitioners, literature review and self-reflection. The proposed revision of EIA follow-up principles will feature an introduction with a simple definition and explanation of objectives for follow-up, and 15 principles. The revised principles address: objective; context; early establishment; project life-cycle; transparency; accessibility; accountability; performance criteria provision; enforcement; learning; adaptive environmental management; flexible or adaptive approach; tiering; cumulative effects and overall performance evaluation. Through publishing this proposal, it is hoped to simultaneously inform or inspire EIA practitioners to enhance their own follow-up knowledge and practices, and to seek input for further refinements that might lead to a revised set of international best practice principles for EIA follow-up.  相似文献   

5.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

6.
Current political discussions and developments indicate the importance and urgency of incorporating climate change considerations into EIA processes. The recent revision of the EU Directive 2014/52/EU on Environmental Impact Assessment (EIA) requires changes in the EIA practice of the EU member states. This paper investigates the extent to which the Environmental Impact Assessment (EIA) can contribute to an early consideration of climate change consequences in planning processes. In particular the roles of different actors in order to incorporate climate change impacts and adaptation into project planning subject to EIA at the appropriate levels are a core topic. Semi-structured expert interviews were carried out with representatives of the main infrastructure companies and institutions responsible in these sectors in Austria, which have to carry out EIA regularly. In a second step expert interviews were conducted with EIA assessors and EIA authorities in Austria and Germany, in order to examine the extent to which climate-based changes are already considered in EIA processes. This paper aims to discuss the different perspectives in the current EIA practice with regard to integrating climate change impacts as well as barriers and solutions identified by the groups of actors involved, namely project developers, environmental competent authorities and consultants (EIA assessors/practitioners). The interviews show that different groups of actors consider the topic to different degrees. Downscaling of climate change scenarios is in this context both, a critical issue with regards to availability of data and costs. Furthermore, assistance for the interpretation of relevant impacts, to be deducted from climate change scenarios, on the specific environmental issues in the area is needed. The main barriers identified by the EIA experts therefore include a lack of data as well as general uncertainty as to how far climate change should be considered in the process without reliable data but in the presence of knowledge about possible consequences at an abstract level. A joint strategy on how to cope with uncertain prognoses about main impacts on environmental issues for areas without reliable data requires a discussion and cooperation between EIA consultants and environmental authorities.  相似文献   

7.
In this study, we carried out a comparative analysis of the Chilean Environmental Impact Assessment (EIA) system using evaluation criteria compared against three countries to allow for an objective evaluation within the growing demand of society for a more creditable and trustable EIA system.A total of 18 evaluation criteria were selected from the literature, and four new criteria for comparing EIA systems were proposed. The Chilean EIA system was compared to that of Brazil, Spain, and Canada using the following four evaluation criteria categories: EIA Legislation (four criteria), EIA Administration (four criteria), EIA Process (eleven criteria), and After EIA (three criteria). A Hierarchical Agglomerative Cluster Analysis for assessing similarity among the EIA systems of Chile, Canada, and Spain was performed: the similarity being 88%. A Principal Component Analysis shows that only 13 of the selected 22 criteria contribute to the variability of the selected EIA systems. The main strengths of the Chilean EIA system are the existence of Specialized Environmental Courts for the resolution of disputes and Appeal options before execution. The identified weaknesses are an EIA system with high centralization at the national level, the absence of consideration of project alternatives, no requirement for scoping, and that the process of Strategic Environmental Assessment is not binding.Modifications to the Environmental Impact Assessment System Regulation are proposed by authors as feasible improvements particularly in relation to, Decentralization of the EIA system, Alternatives for design, Scoping incorporation, Register of reviewers of baseline information, and the public information process and post-evaluation.The method used seeks out to serve as guidance for countries with similar environmental and social contexts, as well as environmental legislation improvement needs.  相似文献   

8.
A study was undertaken to assess the quality of groundwaters in the Kathmandu Valley, Nepal. The groundwater samples were randomly collected from shallow well, tube well, and deep-tube wells located at different places of Kathmandu, Lalitpur, and Bhaktapur districts in the Kathmandu valley. Physical, chemical, and microbiological parameters of the samples were evaluated to estimate the groundwater quality for drinking water. It was found that the groundwater in the valley is vulnerable to drink due to presence of iron and coliform bacteria. Iron was estimated to be much higher then the acceptable limit of World Health Organization (WHO) drinking-water quality guidelines (1.9 mg/L). Total coliform bacteria enumerated in groundwaters significantly exceeded the drinking-water quality standard and observed maximum coliform (267 CFU/100 mL) in shallow wells. The electrical conductivity and turbidity were found to be 875 ??S/cm and 55 NTU, respectively, which are above the WHO recommendations for drinking water guidelines. However, pH value was measured within the acceptable limit. Arsenic, chloride, fluoride, and hardness concentrations were found to be in agreement with the recommendations of WHO drinking-water quality guidelines.  相似文献   

9.
The mountain rivers of the Indian Himalaya possess a vast potential for hydropower generation. After decades of comparatively modest development recent years have seen a major intensification in the construction of new hydropower dams. Although increasingly portrayed as a form of renewable energy generation, hydropower development may lead to extensive alterations of fluvial systems and conflicts with resource use patterns of local communities. To appraise and reduce adverse effects is the purpose of statutory Environmental Impact Assessments (EIA) and corresponding mitigation plans. However, in the light of ambitious policies for hydropower expansion conventional approaches of environmental assessment are increasingly challenged to keep up with the intensity and pace of development. This paper aims to explore the systemic limitations of environmental assessment for hydropower development in the Indian state of Himachal Pradesh. Based on a qualitative methodology involving interviews with environmental experts, document reviews and field observations the study suggests that the current practice of constraining EIAs to the project level fails to address the larger effects of extensive hydropower development. Furthermore, it is critically discussed as to what extent the concept of Strategic Environmental Assessment (SEA) might have the potential to overcome existing shortcomings.  相似文献   

10.
11.
The well-established environmental impact assessment requirements in the United States have given rise to a number of training needs within federal and state agencies. Requirements for training vary for EIA project managers, technical specialists, senior managers and others involved in EIA. Information needs about EIA vary also, but include general awareness, procedural knowledge, substantive methodological knowledge and technical knowledge. While EIA training is provided in short courses, on the job, and in universities there remain deficiencies in the training of specialists, senior managers, and others. Proposals are made here to help overcome these. This paper examines the needs and provisions for training in environmental impact assessment (EIA) in the USA federal system and in the system created by the California Environmental Quality Act. The investigation is based on the very limited literature on training, on responses to letters, on the printed material requested from agencies and, most importantly, on the results of a series of interviews of personnel in various federal agencies at central and regional levels, in California, and elsewhere. A recent report by the Environmental Law Institute (1981) furnished invaluable background information on EIA training in the federal agencies. The list of liaison officers printed by the Council on Environmental Quality (1982a) was used to request interviews and information.  相似文献   

12.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

13.
EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established.  相似文献   

14.
Constructing highways in dense urban areas is always a challenge. In São Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult.The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing.Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on ‘what is strategic’ is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval.  相似文献   

15.
Environmental Impact Assessments (EIAs) that are applied in the planning phases of large land-use and construction projects are aimed at aiding decision-making and mitigating significant environmental impacts. In light of the global biodiversity crisis, conducting high-quality biodiversity impact assessments is important, as biodiversity information, among other factors, has the potential to influence how projects will be implemented in the end. We investigated the biodiversity and bird surveys conducted and the number of bird species of conservation concern in peat extraction and wind farm projects to which an EIA was applied to in 1995–2016 in Finland and compared whether these factors differed between the project types and between implemented and unimplemented projects. We also studied the availability of follow-up monitoring data of biodiversity impacts within the two project types. The number of nationally threatened breeding birds was significantly lower in implemented than in unimplemented peat extraction projects. The overall probability of being implemented was significantly negatively associated with the year the EIA began for both project types. All permitted peat extraction projects and 22% of wind farm projects conducted post-construction biodiversity monitoring; however, only some projects enabled before-after comparisons. Our results are in line with earlier findings that demonstrate the difficulty of showing the direct impacts of biodiversity information on EIA decision-making and to what extent it is related to project approval or rejection. The role of follow-up monitoring in the EIA and project development could also be strengthened.  相似文献   

16.
An environmental impact assessment (EIA) system was established in 1979 in China. Although EIA was designed as a tool for pollution prevention, in practice it has been based on end-of-pipe (EOP) treatment control since it was first introduced. This approach has ensured an overwhelming focus by enterprises on the use of EOP treatment, rather than pollution prevention, to meet environmental standards, and it has produced a low rate of operation for EOP facilities. The low operation rate for EOP facilities can be traced to the traditional EIA system: it leads project proponents to develop large EOP treatment facilities, but once the main production lines are put into operation, proponents rarely have sufficient funds to operate the treatment facilities. This paper analyzes problems that exist in the EIA system in China, and it describes the Cleaner Production Index and Evaluation System, which is being proposed by environmental authorities in China to evaluate EIA projects based on cleaner production criteria. The paper also suggests how cleaner production analysis can be integrated into the EIA system to improve it.  相似文献   

17.
Biodiversity, soil, water, air, climate, landscape and other components are typically analyzed in Environmental Impact Assessment (EIA) when looking for the effects of a given project on the biological and ecological components of the environment. Strategic Environmental Assessment (SEA) tends to follow the same general pattern, when looking for the environmental effects of plans and programs. In both cases, ecosystem services are often not explicitly considered. We developed a framework to analyze environmental assessment (EA) practice and infer about ecosystem services based on existing evidence from EIA and SEA reports and supporting information. Our framework addresses the relations between ecosystem services and the environmental factors assessed in EIA and SEA, considering the relevant conceptual frameworks such as the ES cascade model and the DPSIR framework applied to ES provision. We base our proposals on results from a preliminary meta-analysis of recent EIA and SEA reports from several types of plans and projects in Portugal, in which implicit assessments of ES were clearly predominant. We discuss the implications of those results and the opportunities to infer about ecosystem services, and conclude on the need for more dedicated and explicit efforts to ecosystem services assessment in EIA and SEA.  相似文献   

18.
This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice.  相似文献   

19.
This study identified the role of and challenges faced by Environmental Impact Assessment (EIA) proponents in Punjab, Pakistan. Expected roles of proponents in EIA were taken from regulations, legislation and guidelines. The comments of consultants, Environmental Protection Agency (EPA) and non-governmental organisations (NGOs) regarding the role played by proponents were extracted from literature and used for evaluation. To identify the challenges of proponents in each step of the EIA, 40 semi-structured interviews were conducted with private and government proponents in Punjab. Oftentimes, projects start prior to obtaining an environmental approval. Proper scoping is seldom conducted. Stakeholder involvement in EIA is limited. Proponents sometimes do not share complete project information with consultants, which compromises the report quality and timely decision making. Moreover, some proponents attempt to influence the review and decision making and do not ensure compliance to approval conditions except for few multinationals. The key challenge highlighted by proponents was the discrimination on part of the EPA between private and government projects. Other challenges included lack of professionalism of some consultants and delayed and non-transparent decision making. Although regional in scope, the results of the study hold importance for EIA systems worldwide particularly in countries with similar economic systems who are facing a trade-off between economic growth and environmental sustainability.  相似文献   

20.
This paper presents a new methodology for impact assessment—SIAM (Spatial Impact Assessment Methodology)—which is based on the assumption that the importance of environmental impacts is dependent, among other things, on the spatial distribution of the effects and of the affected environment. The information generated by the use of Geographical Information Systems (GIS) in impact identification and prediction stages of Environmental Impact Assessment (EIA) is used in the assessment of impact significance by the computation of a set of impact indices. For each environmental component (e.g., air pollution, water resources, biological resources), impact indices are calculated based on the spatial distribution of impacts. A case study of impact evaluation of a proposed highway in Central Portugal illustrates the application of the methodology and shows its capabilities to be adapted to the particular characteristics of a given EIA problem.  相似文献   