首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 562 毫秒
1.
Abstract: Over the past 35 years, a trend of decreasing water clarity has been documented in Lake Tahoe, attributable in part to the delivery of fine‐grained sediments emanating from upland and channel sources. The overall objective of the research reported here was to determine the amount of fine sediment delivered to Lake Tahoe from each of the 63 contributing watersheds. The research described in this report used combinations of field‐based observations of channel and bank stability with measured and simulated data on fine‐sediment loadings to estimate fine‐sediment loadings from unmonitored basins throughout the Lake Tahoe Basin. Loadings were expressed in the conventional format of mass per unit time but also in the number of particles finer than 20 μm, the latter for future use in a lake‐clarity model. The greatest contributors of fine sediment happened to be those with measured data, not requiring extrapolation. In descending order, they are as follows: Upper Truckee River [1,010 tonnes per year (T/year)], Blackwood Creek (846 T/year), Trout Creek (462 T/year), and Ward Creek (412 T/year). Summing estimated values from the contributing watersheds provided an average, annual estimate of fine‐sediment (<0.063 mm) loadings to the lake of 5,206 T/year. A total of 7.79E + 19 particles in the 5‐20 μm fraction were calculated to enter Lake Tahoe in an average year with the Upper Truckee River accounting for almost 25% of the total. Contributions from Blackwood, Ward, Trout, and Third creeks account for another 23% of these very fine particles. Thus, these five streams making up about 40% of the basin area, account for almost 50% of all fine‐sediment loadings to the lake. Contribution of fine sediment from streambank erosion were estimated by developing empirical relations between measured or simulated bank‐erosion rates with a field‐based measure of the extent of bank instability along given streams. An average, annual fine‐sediment loading from streambank erosion of 1,305 T/year was calculated. This represents about 25% of the average, annual fine‐sediment load delivered to the lake from all sources. The two largest contributors, the Upper Truckee River (639 T/year) and Blackwood Creek (431 T/year), account for slightly more than 80% of all fines emanating from streambanks, representing about 20% of the fine sediment delivered to Lake Tahoe from all sources. Extrapolations of fine‐sediment loadings to the unmonitored watersheds are based on documented empirical relations, yet contain a significant amount of uncertainty. Except for those values derived directly from measured data, reported results should be considered as estimates.  相似文献   

2.
The Truckee River heads in the Sierra Nevada at Lake Tahoe, and terminates in Pyramid Lake. During the 1969 water year, flow about 9 miles upstream from the mouth (974,000 acre-ft) was almost four times the long-term average, due mainly to heavy winter rains and spring snowmelt. A short period of low-altitude rainfall produced the highest concentrations of suspended sediment, whereas a much longer subsequent period of snowmelt yielded a much greater total quantity of material. The upper 90 percent of the basin yielded about 260 acre-feet (630,000 tons) of sediment at the Nixon gage, whereas an estimated 2,800 acre-feet (6.8 million tons) was contributed by erosion of about 200 acres of river bank below the gage. Solute content at the gage ranged from 80 to 450 mg/l, dominated by calcium, sodium, and bicarbonate, plus silica in the most dilute snowmelt and chloride in the most concentrated low flows. Solute load totaled about 130,000 tons, of which the principal constituents in Pyramid Lake-sodium plus equivalent bicarbonate and chloride-amounted to almost 40,000 tons. The total solute load during a year of average flow may be 45,000-55,000 tons, including 18,000-22,000 tons of principal lake constituents.  相似文献   

3.
Abstract: Streambank erosion by mass‐failure processes represents an important form of channel adjustment and a significant source of sediment in disturbed streams. Mass failures regularly occur by a combination of hydraulic processes that undercut bank toes and geotechnical processes that cause bank collapse by gravity. Little if any quantitative information is available on the effectiveness of bank treatments on reducing erosion. To evaluate potential reduction in sediment loadings emanating from streambanks, the hydraulic and geotechnical processes responsible for mass failure were simulated under existing and mitigated conditions using a Bank‐Stability and Toe‐Erosion Model (BSTEM). Two critical erosion sites were selected from each of the three watersheds known to contribute the greatest amounts of fine sediment by streambank processes in the Lake Tahoe Basin. A typical high‐flow annual hydrograph was selected for analysis. Bank‐material strength data were collected for each layer as were species‐specific root‐reinforcement values. The effects of the first flow event on bank‐toe erosion were simulated using an excess shear‐stress approach. The resulting geometry was then exported into the bank‐stability submodel to test for the relative stability of the bank under peak flow and drawdown conditions. In this way, BSTEM was used iteratively for all flow events for both existing and mitigated conditions. On average, 13.6% of the material was eroded by hydraulic shear, the remainder by mass failures, which occurred about five times over the simulation period. Simulations with 1.0 m‐high rock‐toe protection showed a dramatic reduction in streambank erosion (69‐100%). Failure frequency for the simulation period was reduced in most cases to a single episode. Thus, an almost 90% reduction in streambank loadings was achieved by virtually eliminating the erosion of only 14% of the material that was entrained by hydraulic forces. Consequently, simulations show average load reductions of about an order of magnitude. Results stress the critical importance of protecting the bank toe‐region from steepening by hydraulic forces that would otherwise entrain previously failed and in situ bank materials, thereby allowing the upper bank to flatten (by failure) to a stable slope.  相似文献   

4.
ABSTRACT: The Truckee River is a vitally important water source for eastern California and western Nevada. It runs 100 miles from Lake Tahoe to Pyramid Lake in the Nevada desert and serves urban populations in greater Reno-Sparks and agricultural users in three Nevada counties. In the 1980s and 1990s, a number of state and local groups initiated projects which, taken collectively, have accomplished much to improve watershed management on the Truckee River. However, the task of writing a management plan for the entire watershed has not yet been undertaken. Key players in state, federal and local government agencies have instead chosen to focus specific improvement efforts on more manageable, achievable goals. The projects currently underway include a new agreement on reservoir operation, restoration of high priority sub-watersheds, public education and involvement, water conservation education, and water resource planning for the major urban population centers. The approach which has been adopted on the Truckee River continues to evolve as more and more people take an interest in the river's future. The many positive projects underway on the watershed are evaluated in terms of how well they meet the definition of the ambitious water resources strategy, “integrated watershed management.”  相似文献   

5.
ABSTRACT: The fate and effect of sodium chloride applied to Californian highways in the Lake Tahoe, Truckee River, and Yuba River watersheds were studied over a period of 14 months in 1974–75. Chloride levels in streams below major freeways were found to be elevated during the winter. The high chloride levels occurred after the application of salt to roads, decreasing as the time from application increases. Small lakes receiving runoff from major highways were also enriched with chloride. Several of these lakes displayed a temporary chemocline, which was sufficiently strong to stabilize a temperature inversion in one lake.  相似文献   

6.
Anderson, SallyRose, Glenn Tootle, and Henri Grissino‐Mayer, 2012. Reconstructions of Soil Moisture for the Upper Colorado River Basin Using Tree‐Ring Chronologies. Journal of the American Water Resources Association (JAWRA) 48(4): 849‐858. DOI: 10.1111/j.1752‐1688.2012.00651.x Abstract: Soil moisture is an important factor in the global hydrologic cycle, but existing reconstructions of historic soil moisture are limited. We used tree‐ring chronologies to reconstruct annual soil moisture in the Upper Colorado River Basin (UCRB). Gridded soil moisture data were spatially regionalized using principal components analysis and k‐nearest neighbor techniques. We correlated moisture sensitive tree‐ring chronologies in and adjacent to the UCRB with regional soil moisture and tested the relationships for temporal stability. Chronologies that were positively correlated and stable for the calibration period were retained. We used stepwise linear regression to identify the best predictor combinations for each soil moisture region. The regressions explained 42‐78% of the variability in soil moisture data. We performed reconstructions for individual soil moisture grid cells to enhance understanding of the disparity in reconstructive skill across the regions. Reconstructions that used chronologies based on ponderosa pines (Pinus ponderosa) and pinyon pines (Pinus edulis) explained more variance in the datasets. Reconstructed soil moisture data was standardized and compared with standardized reconstructed streamflow and snow water equivalent data from the same region. Soil moisture and other hydrologic variables were highly correlated, indicating reconstructions of soil moisture in the UCRB using tree‐ring chronologies successfully represent hydrologic trends.  相似文献   

7.
The cumulative effects of forest management activities on water quality at a downstream point were monitored from 1972-1980 during development of a watershed for timber resources. Suspended sediment concentration and turbidity were measured at two hydrologic stations which bracketed a 10-km reach of the Middle Santiam River in the Western Cascades of Oregon as it flowed through an 8000-ha block of intensively managed forest land. Slope failures often accompany road building and harvesting in steep forested watersheds and pose the most serious threat to water quality. Although 180 km of road were constructed and 3400 ha of old-growth forests were harvested from slopes averaging over 60 percent, long-term changes in sediment yields remained undetectable during the period of measurement. The geologic characteristics of the basin and the road construction and maintenance techniques as prescribed by Oregon's forest practice regulations helped to minimize the occurrence of slope failures so that long-term changes in suspended sediment export rates did not occur. Throughout the nine-year measurement period, seven slope failures which added sediment directly to streams produced measurable short-term responses at the downstream sampling location, but these erosion events were too small and too infrequent to produce long-term changes in sediment yield from the watershed.  相似文献   

8.
Abstract: A study was conducted between September 2003 and September 2006 to obtain baseline sediment inventories and monitor sediment transport and storage along a 3.7 km length of the channel of Valley Creek within Valley Forge National Historical Park, Pennsylvania. Valley Creek is a tributary of the Schuylkill River and drains an urbanizing 60.6 km2 watershed that currently has 18% impervious land cover. Numerous field methods were employed to measure the suspended sediment yield, longitudinal profile, cross‐sections, banklines, and particle size distribution of the streambed. Suspended sediment yield for the watershed was measured at a USGS gage located just upstream of the park boundary between July 2004 and July 2005, the period corresponding to field surveys of bank erosion and channel change. The estimated suspended sediment yield of 95.7 t/km2/year is representative of a year with unusually high discharge, including a storm event that produced a peak of 78 m3/s, the second highest discharge on record for the USGS gage. Based on the median annual streamflow for the 24 years of record at the USGS gage from 1983 to 2006, the median annual sediment yield is estimated to be closer to 34 t/km2/year, considerably lower than median and mean values for other sites within the region. The mass of silt, clay, and fine sand derived from bank erosion along the 3.7 km study reach during the field survey period accounts for an estimated 2,340 t, equivalent to about 43% of the suspended sediment load. The mass of fine sediment stored in the bed along the study reach was estimated at 1,500 t, with about 330 t of net erosion during the study period. Although bank erosion appears to be a potentially dominant source of sediment by comparison with annual suspended sediment load, bed sediment storage and potential for remobilization is of the same order of magnitude as the mass of sediment derived from bank erosion.  相似文献   

9.
Sediment and phosphorus (P) transport from the Minnesota River Basin to Lake Pepin on the upper Mississippi River has garnered much attention in recent years. However, there is lack of data on the extent of sediment and P contributions from riverbanks vis-à-vis uplands and ravines. Using two light detection and ranging (lidar) data sets taken in 2005 and 2009, a study was undertaken to quantify sediment and associated P losses from riverbanks in Blue Earth County, Minnesota. Volume change in river valleys as a result of bank erosion amounted to 1.71 million m over 4 yr. Volume change closely followed the trend: the Blue Earth River > the Minnesota River at the county's northern edge > the Le Sueur River > the Maple River > the Watonwan River > the Big Cobb River > Perch Creek > Little Cobb River. Using fine sediment content (silt + clay) and bulk density of 37 bank samples representing three parent materials, we estimate bank erosion contributions of 48 to 79% of the measured total suspended solids at the mouth of the Blue Earth and the Le Sueur rivers. Corresponding soluble P and total P contributions ranged from 0.13 to 0.20% and 40 to 49%, respectively. Although tall banks (>3 m high) accounted for 33% of the total length and 63% of the total area, they accounted for 75% of the volume change in river valleys. We conclude that multitemporal lidar data sets are useful in estimating bank erosion and associated P contributions over large scales, and for riverbanks that are not readily accessible for conventional surveying equipment.  相似文献   

10.
ABSTRACT: The objective of this study was to characterize the sources, concentrations, and distribution of total and methylmer‐cury in water, and channel and bank sediments of Steamboat Creek, Nevada. This information was needed to begin to assess the potential impacts of stream restoration on mercury pollution in this tributary to the Truckee River. The Truckee River flows into Pyramid Lake, a terminal water body home to one endangered and one threatened fish species, where stable pollutants will accumulate over time. Mercury in Steamboat Creek was originally derived from its headwaters, Washoe Lake, where several gold and silver mills that utilized mercury were located. In the 100 plus years since ore processing occurred, mercury‐laden alluvium has been deposited in the stream channel and on streambanks where it is available for remobilization. Total mercury concentrations measured in unfiltered water from the creek ranged from 82 to 419 ng/L, with greater than 90 percent of this mercury being particle‐bound (> 0.45 (m). Mercury in sediments ranged from 0.26 to 10.2 μg/g. Methylmercury concentrations in sediments of Steamboat Creek were highest in wetlands, lower in the stream channel, and still lower in streambank settings. Methylmercury concentrations in water were 0.63 to 1.4 ng/L. A streambank restoration plan, which includes alterations to channel geometry and wetland creation or expansion, has been initiated for the creek. Data developed indicate that streambank stabilization could reduce the mercury loading to the Creek and that wetland construction could exacerbate methylmercury production.  相似文献   

11.
ABSTRACT: The impacts of a severe sustained drought on Colorado River system water resources were investigated by simulating the physical and institutional constraints within the Colorado River Basin and testing the response of the system to different hydrologic scenarios. Simulations using Hydrosphere's Colorado River Model compared a 38-year severe sustained drought derived from 500 years of reconstructed streamflows for the Colorado River basin with a 38-year streamflow trace extracted from the recent historic record. The impacts of the severe drought on streamflows, water allocation, storage, hydropower generation, and salinity were assessed. Estimated deliveries to consumptive uses in the Upper Basin states of Colorado, Utah, Wyoming, New Mexico, and northern Arizona were heavily affected by the severe drought, while the Lower Basin states of California, Nevada, and Arizona suffered only slight shortages. Upper Basin reservoirs and streamflows were also more heavily affected than those in the Lower Basin by the severe drought. System-wide, total hydropower generation was 84 percent less in the drought scenario than in the historical stream-flow scenario. Annual, flow-weighted salinity below Lake Mead exceeded 1200 ppm for six years during the deepest portion of the severe drought. The salinity levels in the historical hydrology scenario never exceeded 1100 ppm.  相似文献   

12.
Abstract: Earlier measurements of stream channel geometry on 19 reaches were repeated to provide a longitudinal study of stream channel adjustment over 13 years (1987‐2000) in the urbanizing Gwynns Falls, Maryland watershed. We observed both enlargement and reduction in channel size, depending on the extent of upstream development, the timing and location of urbanization and upstream channel adjustment, and the presence of hydrologic constrictions and grade controls. Based on a relatively simple visual assessment of the composition, size, and extent of instream sediment storage, we categorized stream reaches into three phases: aggraded (7 sites), early erosion (7 sites), and late erosion (5 sites). Aggraded sites had point and lateral bars mantled with fine‐grained sediment and experienced some reduction in cross‐sectional area, primarily through the deposition of fine‐grained material on bars in the channel margins. Early erosion sites had smaller bars and increases in channel cross‐sectional area as a consequence of the evacuation of in‐channel fine‐grained sediment. Fine‐grained sediments were either entirely absent or found only at a few high bar elevations at late erosion sites. Sediment evacuation from late erosion sites has both enlarged and simplified channels, as demonstrated by an increase in cross‐sectional area and a strong decrease in channel width variation. Channel cross‐sectional area enlargement, reduced channel width variation, and channel incision were ubiquitous at erosion sites. As a result, overbank flows were less common in the erosion sites as determined by high water marks left by a 2‐year flood that occurred during the study period. Principal causes for channel changes appear to be increased high flow durations and reduced sediment supply. Spatial variation in channel conditions could not be tied simply to sub‐basin impervious cover or watershed area. In‐channel sediment storage is a useful indicator of channel form and adjustment. When combined with information on development and sedimentation conditions in the contributing drainage, instream sediment storage can be used to effectively assess future channel adjustments.  相似文献   

13.
Channel changes from 1919 to 1989 were documented in two study reaches of the Merced River in Yosemite National Park through a review of historical photographs and documents and a comparison of survey data. Bank erosion was prevalent and channel width increased an average of 27% in the upstream reach, where human use was concentrated. Here, trampling of the banks and riparian vegetation was common, and banks eroded on straight stretches as frequently as on meander bends. Six bridges in the upper reach constrict the channel by an average of 38% of the original width, causing severe erosion. In the downstream control reach, where human use was minimal, channel widths both decreased and increased, with a mean increase of only 4% since 1919. Bank erosion in the control reach occurred primarily on meander bends. The control reach also had denser stands of riparian vegetation and a higher frequency of large woody debris in channels. There is only one bridge in the lower reach, located at the downstream end. Since 1919, bank erosion in the impacted upstream reach contributed a significant amount of sediment (74,800 tonnes, equivalent to 2.0 t/km2/yr) to the river. An analysis of 75 years of precipitation and hydrologic records showed no trends responsible for bank erosion in the upper reach. Sediment input to the upper reach has not changed significantly during the study period. Floodplain soils are sandy, with low cohesion and are easily detached by lateral erosion. The degree of channel widening was positively correlated with the percentage of bare ground on the streambanks and low bank stability ratings. Low bank stability ratings were, in turn, strongly associated with high human use areas. Channel widening and bank erosion in the upper reach were due primarily to destruction of riparian vegetation by human trampling and the effect of bridge constrictions on high flow, and secondarily to poorly installed channel revetments. Several specific recommendations for river restoration were provided to park management.  相似文献   

14.
Effects of Soil Conditions on Survival and Growth of Black Willow Cuttings   总被引:1,自引:0,他引:1  
Current streambank restoration efforts focus on providing bank stability, enhancing water quality, and improving woody habitat using native vegetation rather than traditional engineering techniques. However, in most cases harsh site conditions limit restoration success. A two-year field study was conducted at Twentymile Creek, in northern Mississippi, investigating edaphic factors governing the survival of black willow (Salix nigra) cuttings used for streambank restoration. Low height growth, above-ground biomass production, and average leaf area were observed in willow cuttings grown in plots subjected to moisture deficits. However, sediment texture emerged as the dominant factor determining willow post growth, health, and survival. Shoot biomass, leaf biomass, and total above-ground biomass were 15-, 10-, and 14-fold greater for large willow cuttings (posts) grown in plots with sandy sediments relative to those grown in plots with similar moisture and soil redox potential but with silt and clay sediments. Average leaf size, average leaf mass and specific leaf area were all lower in fine textured plots. Under moisture conditions present at our sites, coarse-grained sediment (sand) was more conducive to willow growth, biomass production, and survival than were fine-grained sediments (silt/clay). Our results strongly suggest that soil texture and moisture conditions can determine restoration success. Therefore, it is critical that site conditions are factored into the selection of project locations prior to the initiation of willow planting restoration projects.  相似文献   

15.
Abstract:  The state of Michigan is interested in removing two low‐head dams in an 8.8 km reach of the Kalamazoo River between Plainwell and Otsego, Michigan, while minimizing impacts locally and to downstream reaches. The study was designed to evaluate the erosion, transport, and deposition of sediments over a 37.3‐year period using the channel evolution model CONCEPTS for three simulation scenarios: Dams In (DI), Dams Out (DO), and Design (D). The total mass of sediment emanating from the channel boundary, for the DI case, shows net deposition of 4,100 T/y for the study reach, with net transport (suspended and bed load) of 10,500 T/y passing the downstream boundary. For the DO case, net erosion is 19,200 T/y with net transport of 30,100 T/y (187% increase) passing the downstream boundary. For the D case, net deposition is 2,570 T/y (37% decrease) with transport of 14,200 T/y (35% increase) passing the downstream boundary. The most significant findings were: (1) removal of the low‐head dams will cause significant erosion of sediments stored behind the dams and increased sediment loads passing the downstream boundary and (2) sediment loads for the proposed channel design are similar to existing conditions and offer reduced fine‐sediment loadings.  相似文献   

16.
ABSTRACT: Sediment accumulation was evaluated in Lake Onalaska, a 2800-ha backwater impoundment on the Upper Mississippi River. Computer programs were used to process fathometric charts and generate an extensive data set on water depth for the lake. Comparison of 1983 survey data with pre-impoundment (before 1937) data showed that Lake Onalaska had lost less than 10 percent of its original mean depth in the 46 years since impoundment. Previous estimates of sedimentation rates based on Cesium-137 sediment core analysis appear to have been too high.  相似文献   

17.
ABSTRACT: Effects of the 1993 flood on river water and sediment quality were investigated using historical data and data collected from the Illinois River and Upper Mississippi River in a post‐flood period. Overall the post‐flood results showed systematic reductions and individual changes in the water and sediment constituents. The reductions in sediment metals and nutrients were most obvious at the Keokuk and Lock and Dam 26 stations. By analyzing and comparing the physical changes to the changes in water and sediment constituents at each station, it was found that physical processes such as sediment entrainment and, more importantly, the removal of fine sediment to be the main causes for the reduced concentrations in sediment constituents. On the other hand, sediment redistribution and associated secondary contamination could have caused the emergence of several water and sediment constituents that were undetected before the flood.  相似文献   

18.
Abstract: Many rivers and streams of the Mid‐Atlantic Region, United States (U.S.) have been altered by postcolonial floodplain sedimentation (legacy sediment) associated with numerous milldams. Little Conestoga Creek, Pennsylvania, a tributary to the Susquehanna River and the Chesapeake Bay, is one of these streams. Floodplain sedimentation rates, bank erosion rates, and channel morphology were measured annually during 2004‐2007 at five sites along a 28‐km length of Little Conestoga Creek with nine colonial era milldams (one dam was still in place in 2007). This study was part of a larger cooperative effort to quantify floodplain sedimentation, bank erosion, and channel morphology in a high sediment yielding region of the Chesapeake Bay watershed. Data from the five sites were used to estimate the annual volume and mass of sediment stored on the floodplain and eroded from the banks for 14 segments along the 28‐km length of creek. A bank and floodplain reach based sediment budget (sediment budget) was constructed for the 28 km by summing the net volume of sediment deposited and eroded from each segment. Mean floodplain sedimentation rates for Little Conestoga Creek were variable, with erosion at one upstream site (?5 mm/year) to deposition at the other four sites (highest = 11 mm/year) despite over a meter of floodplain aggradation from postcolonial sedimentation. Mean bank erosion rates range between 29 and 163 mm/year among the five sites. Bank height increased 1 m for every 10.6 m of channel width, from upstream to downstream (R2 = 0.79, p < 0.0001) resulting in progressively lowered hydraulic connectivity between the channel and the floodplain. Floodplain sedimentation and bank erosion rates also appear to be affected by the proximity of the segments to one existing milldam, which promotes deposition upstream and scouring downstream. The floodplain and bank along the 28‐km reach produced a net mean sediment loss of 5,634 Mg/year for 2004‐2007, indicating that bank erosion was exceeding floodplain sedimentation. In particular, the three segments between the existing dam and the confluence with the Conestoga River (32% of the studied reach) account for 97% of the measured net sediment budget. Future research directed at understanding channel equilibria should facilitate efforts to reduce the sediment impacts of dam removal and legacy sediment.  相似文献   

19.
ABSTRACT: Harland Creek, in east-central Mississippi, is a rapidly migrating, meandering stream that is experiencing severe bank erosion. More than 9,000 willow (Salix nigra) posts were emplaced in February 1994 by the U.S. Army, Corps of Engineers in an effort to stabilize eroding stream banks using an experimental bioengi-neering technique. Monitoring of this stream reach and the willow post bank stabilization has resulted in a data base to assess willow mortality as related to bank aspect, post diameter, cover, and base elevation above low water. Monitoring has also resulted in the development of revised construction guidelines. Survivability of the posts, a necessary condition for long-term success, was found to average 81 percent in May 1994, 43 percent in October 1994, and 41 percent in August 1995. Even with survivability as low as 29 percent to 34 percent at specific bend reaches, willow posts are documented to be successful in bank stabilization for the period of monitoring, in comparison with more traditional riprap stabilization methods. Guidelines for improved survivability and recommended site selection are presented. Cost of willow post bank stabilization is less than traditional riprap, and willow posts can be emplaced using readily available equipment and materials.  相似文献   

20.
Lake Powell is a large reservoir in Utah and Arizona that has experienced large changes in water level during a recent drought. As a first step in assessing the connection between hydrologic and chemical changes at Lake Powell, we characterized the particle size and solid-phase bulk concentrations for 31 elements and 25 minerals in sediment from the inflow region and some shoreline locations by using laser diffractometry, X-ray fluorescence, elemental analysis, and X-ray diffraction Our results are consistent with previous results that show a negative correlation between particle size and concentrations of most elements and most minerals other than quartz and some feldspars. In our samples, however, solid-phase iron, rather than particle size or organic carbon, is the best predictor variable for the solid-phase concentrations of elements and minerals. Sediment characteristics vary on a scale of tens of kilometers, with fine sediment that is enriched in trace elementsnearer to the dam. These trends allow formulation of an algorithm for determining a water-level threshold below which sediment resuspension may alter water chemistry in a generic reservoir with a long and narrow sediment delta.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号