首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The concept of vulnerability has been used to describe the susceptibility of physical, biotic, and social systems to harm or hazard. In this sense, it is a tool that reduces the uncertainties of Environmental Impact Assessment (EIA) since it does not depend exclusively on the value assessments of the evaluator, but rather is based on the environmental state indicators of the site where the projects or activities are being carried out. The concept of vulnerability thus reduces the possibility that evaluators will subjectively interpret results, and be influenced by outside interests and pressures during projects. However, up until now, EIA has been hindered by a lack of effective methods. This research study analyzes the concept of vulnerability, defines Vulnerability Importance and proposes its inclusion in qualitative EIA methodology. The method used to quantify Vulnerability Importance is based on a set of environmental factors and indicators that provide a comprehensive overview of the environmental state. The results obtained in Colombia highlight the usefulness and objectivity of this method since there is a direct relation between this value and the environmental state of the departments analyzed.  相似文献   

2.
This paper presents a new methodology for impact assessment—SIAM (Spatial Impact Assessment Methodology)—which is based on the assumption that the importance of environmental impacts is dependent, among other things, on the spatial distribution of the effects and of the affected environment. The information generated by the use of Geographical Information Systems (GIS) in impact identification and prediction stages of Environmental Impact Assessment (EIA) is used in the assessment of impact significance by the computation of a set of impact indices. For each environmental component (e.g., air pollution, water resources, biological resources), impact indices are calculated based on the spatial distribution of impacts. A case study of impact evaluation of a proposed highway in Central Portugal illustrates the application of the methodology and shows its capabilities to be adapted to the particular characteristics of a given EIA problem.  相似文献   

3.
4.
5.
Chile was one of many countries that initiated environmental impact assessments in the 1990s, and has relied on their use for species conservation and territorial planning without the use of larger-scale environmental and ecological planning. The capacity of Chile's environmental impact assessment system (SEIA) to evaluate resident freshwater fishes and the potential impacts of water projects and aquaculture activities – two categories of projects that create direct threats to freshwater fishes – are assessed. Of the 3997 such submissions to the SEIA, only 0.6% conducted any freshwater fish assessment, and only 0.1% conducted any quantitative assessment of expected impacts from the associated project. The small number of assessments was characterized by poor study design, inconsistent sampling methodology, and species misidentification. Traditional assessments failed to include freshwater fish ecology in the general assessment framework. The new strategic environmental evaluation system only underscores the need for vastly improved field sampling protocols and assessment methodologies.  相似文献   

6.
The construction of roads is one of the most widespread forms of natural landscape modification. Over the last 20 years, dozens of road constructions have been assessed in Slovakia, which makes it possible to talk about methodological positives and negatives. A special feature of Slovakia is that many planned or renovated roads are located in protected areas or are in contact with them (including Natura 2000 sites). Therefore, it is important to understand the scope of the roads' ecological impacts and find ways for their appropriate evaluation and incorporation into the Environmental Impact Assessment process. For this reason, the Ecological Impact Assessment methodology can be used as a basis for our research, which consists of three stages. In the first stage (scoping), a buffer circumventing the proposed road is created to determine the area for impact prediction and evaluation. Subsequently, the landscape structure and baseline landscape conditions are discussed, a map of current landscape structure is created and the current ecological status of the affected area is calculated. In the second stage (the evaluation of ecological resources), important ecological parts of the landscape are delineated. This step is based on the importance of previous information and its vulnerability, and leads to the mapping of the road ecological impact zone. In the third stage (impact assessment), important ecological parts are spatially correlated with the proposed road construction. Finally, the significance of ecological impacts of the activity is evaluated by applying specific criteria (duration, reversibility, magnitude, size and road ecological impact zone significance). A scale is proposed for each criterion to evaluate the total significance of impacts. In this way, detailed significant ecological impacts can be found which will help lead to proposed correct mitigation measures and a post-project analysis.  相似文献   

7.
Forests are becoming severely fragmented as a result of land development. South Korea has responded to changing community concerns about environmental issues. The nation has developed and is extending a broad range of tools for use in environmental management. Although legally mandated environmental compliance requirements in South Korea have been implemented to predict and evaluate the impacts of land-development projects, these legal instruments are often insufficient to assess the subsequent impact of development on the surrounding forests. It is especially difficult to examine impacts on multiple (e.g., regional and local) scales in detail. Forest configuration and size, including forest fragmentation by land development, are considered on a regional scale. Moreover, forest structure and composition, including biodiversity, are considered on a local scale in the Environmental Impact Assessment process. Recently, the government amended the Environmental Impact Assessment Act, including the SEA, EIA, and small-scale EIA, to require an integrated approach. Therefore, the purpose of this study was to establish an impact assessment system that minimizes the impacts of land development using an approach that is integrated across multiple scales.This study focused on forest fragmentation due to residential development and road construction sites in selected Congestion Restraint Zones (CRZs) in the Greater Seoul Area of South Korea. Based on a review of multiple-scale impacts, this paper integrates models that assess the impacts of land development on forest ecosystems. The applicability of the integrated model for assessing impacts on forest ecosystems through the SEIA process is considered.On a regional scale, it is possible to evaluate the location and size of a land-development project by considering aspects of forest fragmentation, such as the stability of the forest structure and the degree of fragmentation. On a local scale, land-development projects should consider the distances at which impacts occur in the vicinity of the forest ecosystem, and these considerations should include the impacts on forest vegetation and bird species. Impacts can be mitigated by considering the distances at which these influences occur. In particular, this paper presents an integrated environmental impact assessment system to be applied in the SEIA process. The integrated assessment system permits the assessment of the cumulative impacts of land development on multiple scales.  相似文献   

8.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

9.
Assessing the significance of environmental impacts is one of the most important and all together difficult processes of Environmental Impact Assessment. This is largely due to the multicriteria nature of the problem. To date, decision techniques used in the process suffer from two drawbacks, namely the problem of compensation and the problem of identification of the “exact boundary” between sub-ranges. This article discusses these issues and proposes a methodology for determining the significance of environmental impacts based on comparative and sensitivity analyses using the Electre TRI technique.An application of the methodology for the environmental assessment of a Power Plant project within the Valencian Region (Spain) is presented, and its performance evaluated. It is concluded that contrary to other techniques, Electre TRI automatically identifies those cases where allocation of significance categories is most difficult and, when combined with sensitivity analysis, offers greatest robustness in the face of variation in weights of the significance attributes. Likewise, this research demonstrates the efficacy of systematic comparison between Electre TRI and sum-based techniques, in the solution of assignment problems. The proposed methodology can therefore be regarded as a successful aid to the decision-maker, who will ultimately take the final decision.  相似文献   

10.
The oil and gas sector is a key driver of the offshore economy. Yet, it is also associated with a number of unwanted environmental impacts which potentially threaten the long term economic and environmental viability of marine ecosystems. Environmental Impact Assessment (EIA) can potentially make a significant contribution to the identification and management of adverse impacts through the promotion of evidence based decision making. However, the extent to which EIA has been embraced by key stakeholders is poorly understood. On this basis, this paper provides an initial evaluation of EIA performance within the oil and gas sector. The methodology adopted for the paper consisted of the structured review of 35 Environmental Statements (ESs) along with interviews with regulators, operators, consultants and advisory bodies. The findings reveal a mixed picture of EIA performance with a significant number of ESs falling short of satisfactory quality and a tendency for the process to be driven by compliance rather than best practice.  相似文献   

11.
Environmental Impact Assessments (EIAs) that are applied in the planning phases of large land-use and construction projects are aimed at aiding decision-making and mitigating significant environmental impacts. In light of the global biodiversity crisis, conducting high-quality biodiversity impact assessments is important, as biodiversity information, among other factors, has the potential to influence how projects will be implemented in the end. We investigated the biodiversity and bird surveys conducted and the number of bird species of conservation concern in peat extraction and wind farm projects to which an EIA was applied to in 1995–2016 in Finland and compared whether these factors differed between the project types and between implemented and unimplemented projects. We also studied the availability of follow-up monitoring data of biodiversity impacts within the two project types. The number of nationally threatened breeding birds was significantly lower in implemented than in unimplemented peat extraction projects. The overall probability of being implemented was significantly negatively associated with the year the EIA began for both project types. All permitted peat extraction projects and 22% of wind farm projects conducted post-construction biodiversity monitoring; however, only some projects enabled before-after comparisons. Our results are in line with earlier findings that demonstrate the difficulty of showing the direct impacts of biodiversity information on EIA decision-making and to what extent it is related to project approval or rejection. The role of follow-up monitoring in the EIA and project development could also be strengthened.  相似文献   

12.
Actors in the built environment are progressively considering environmental and social issues alongside functional and economic aspects of development projects. Infrastructure projects represent major investment and construction initiatives with attendant environmental, economic and societal impacts across multiple scales. To date, while sustainability strategies and frameworks have focused on wider national aspirations and strategic objectives, they are noticeably weak in addressing micro-level integrated decision making in the built environment, particularly for infrastructure projects. The proposed approach of this paper is based on the principal that early intervention is the most cost-effective and efficient means of mitigating the environmental effects of development projects, particularly macro infrastructure developments. A strategic overview of the various project alternatives, taking account for stakeholder and expert input, could effectively reduce project impacts/risks at low cost to the project developers but provide significant benefit to wider communities, including communities of future stakeholders. This paper is the first exploratory step in developing a more systematic framework for evaluating strategic alternatives for major metropolitan infrastructure projects, based on key sustainability principles. The developed Strategic Project Appraisal (SPA) framework, grounded in the theory of Strategic Environmental Assessment (SEA), provides a means of practically appraising project impacts and alternatives in terms of quantified ecological limits; addresses the neglected topic of metropolitan infrastructure as a means of delivering sustainability outcomes in the urban context and more broadly, seeks to open a debate on the potential for SEA methodology to be more extensively applied to address sustainability challenges in the built environment. Practically applied and timed appropriately, the SPA framework can enable better decision-making and more efficient resource allocation ensuring low impact infrastructure development.  相似文献   

13.
The U.S. National Environmental Policy Act (NEPA) of 1969 heralded in an era of more robust attention to environmental impacts resulting from larger scale federal projects. The number of other countries that have adopted NEPA's framework is evidence of the appeal of this type of environmental legislation. Mandates to review environmental impacts, identify alternatives, and provide mitigation plans before commencement of the project are at the heart of NEPA. Such project reviews have resulted in the development of a vast number of reports and large volumes of project-specific data that potentially can be used to better understand the components and processes of the natural environment and provide guidance for improved and efficient environmental protection. However, the environmental assessment (EA) or the more robust and intensive environmental impact statement (EIS) that are required for most major projects more frequently than not are developed to satisfy the procedural aspects of the NEPA legislation while they fail to provide the needed guidance for improved decision-making. While NEPA legislation recommends monitoring of project activities, this activity is not mandated, and in those situations where it has been incorporated, the monitoring showed that the EIS was inaccurate in direction and/or magnitude of the impact. Many reviews of NEPA have suggested that monitoring all project phases, from the design through the decommissioning, should be incorporated. Information gathered though a well-developed monitoring program can be managed in databases and benefit not only the specific project but would provide guidance how to better design and implement future activities designed to protect and enhance the natural environment.  相似文献   

14.
The negative impacts of expressway construction projects (ECPs) on ecosystems have raised serious concerns globally. While ECP contractors are selective in implementing sustainable construction, they have rarely been informed of making reasonable efforts to address the concerns. This study aims to map out a quantitative analysis approach to aid contractors in determining ecological protection efforts. Four latent variables are included: project features, project perceptions, ecological impact evaluation, and ecological protection decision-making. It is revealed that project perceptions serve as a foundation for effort determination. The determination is built on the relationship between ecological impacts and the intensity of construction activities. Furthermore, the main effort decision is resource consumption. This study addresses decision-making issues pertained to the uptake of sustainability principles in the ECP sector and contributes a three-step framework for anticipating ecological protection efforts in the area of environmental studies.  相似文献   

15.
This study applies a process of detailed assessment to summarize the potential impact of a proposed construction or other activity on the environment before implementation of an investment plan. The aim of the study was to develop a general methodology for analysis and evaluation of environmental issues connected with planned activities and proposed projects (especially buildings and engineering constructions, required implementation of environmental impact assessment process) using a risk analysis method, thus enabling the best option among the proposed activities to be chosen. The methodology was developed for conditions in Slovakia but could be arranged for any other country considering national conditions, requirements, standards and legislative. Application of the developed methodology in environmental impact assessment could create preconditions for more effective implementation of the EIA process. This paper provides a framework for the risk analysis component of the scoping phase within the EIA process. The process outlined in this paper will assist with determination of an estimation of risks to environmental and health of proposed activities.  相似文献   

16.
The quantitative assessment of health impacts has been identified as a crucial feature for realising the full potential of health impact assessment (HIA). In settings where demographic and health data are notoriously scarce, but there is a broad range of ascertainable ecological, environmental, epidemiological and socioeconomic information, a diverse toolkit of data collection strategies becomes relevant for the mainly small-area impacts of interest. We present a modular, cross-sectional baseline health survey study design, which has been developed for HIA of industrial development projects in the humid tropics. The modular nature of our toolkit allows our methodology to be readily adapted to the prevailing eco-epidemiological characteristics of a given project setting. Central to our design is a broad set of key performance indicators, covering a multiplicity of health outcomes and determinants at different levels and scales. We present experience and key findings from our modular baseline health survey methodology employed in 14 selected sentinel sites within an iron ore mining project in the Republic of Guinea. We argue that our methodology is a generic example of rapid evidence assembly in difficult-to-reach localities, where improvement of the predictive validity of the assessment and establishment of a benchmark for longitudinal monitoring of project impacts and mitigation efforts is needed.  相似文献   

17.
The increasing trend of opencast coal mining in India tends to release huge amounts of dust. But there is no well-defined method of estimating dust emission due to different coal mining activities. This paper examines the sources of dust emission due to coal mining activities, and focuses on the quantification of dust emission with the development and use of emission factors. Because of their site-specific nature, emission factors developed for one site may not give the correct results for another site. In the present investigation, prediction equations are utilized for the development of emission factors. For the applications of this concept, one large opencast coal project of Bharat Coking Coal Ltd. (BCCL) was investigated, and the total amount of dust emitted due to different mining activities was calculated by the utilization of emission factor data, which was estimated to be 9368.2 kg/day. This paper also focuses on the significance of this study in the field of environmental protection and likely impacts of such study. The paper concludes that once the amount of dust generation is estimated, the impact on air quality can be assessed appropriately and a proper air-pollution control strategy can be developed.  相似文献   

18.
There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil.In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts.We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The knowledge derived from this study may therefore be useful to a wider range of audience who are concerned with sustainable integration of development and environmental conservation.  相似文献   

19.
The main aim of this paper is to explore how perceptual and aesthetic impact analyses are considered in Environmental Impact Assessment (EIA), with specific reference to Italian renewable energy projects. To investigate this topic, the paper starts by establishing which factors are linked with perceptual and aesthetic impacts and why it is important to analyze these aspects, which are also related to legislative provisions and procedures in Europe and in Italy. In particular the paper refers to renewable energy projects because environmental policies are encouraging more and more investment in this kind of primary resource. The growing interest in this type of energy is leading to the realization of projects which change the governance of territories, with inevitable effects on the landscape from the aesthetic and perceptual points of view. Legislative references to EIA, including the latest directive regarding this topic show the importance of integrating the assessment of environmental and perceptual impacts, thus there is a need to improve EIA methodological approaches to this purpose. This paper proposes a profile of aesthetic and perceptual impact analysis in EIA for renewable energy projects in Italy, and concludes with recommendations as to how this kind of analysis could be improved.  相似文献   

20.
Current political discussions and developments indicate the importance and urgency of incorporating climate change considerations into EIA processes. The recent revision of the EU Directive 2014/52/EU on Environmental Impact Assessment (EIA) requires changes in the EIA practice of the EU member states. This paper investigates the extent to which the Environmental Impact Assessment (EIA) can contribute to an early consideration of climate change consequences in planning processes. In particular the roles of different actors in order to incorporate climate change impacts and adaptation into project planning subject to EIA at the appropriate levels are a core topic. Semi-structured expert interviews were carried out with representatives of the main infrastructure companies and institutions responsible in these sectors in Austria, which have to carry out EIA regularly. In a second step expert interviews were conducted with EIA assessors and EIA authorities in Austria and Germany, in order to examine the extent to which climate-based changes are already considered in EIA processes. This paper aims to discuss the different perspectives in the current EIA practice with regard to integrating climate change impacts as well as barriers and solutions identified by the groups of actors involved, namely project developers, environmental competent authorities and consultants (EIA assessors/practitioners). The interviews show that different groups of actors consider the topic to different degrees. Downscaling of climate change scenarios is in this context both, a critical issue with regards to availability of data and costs. Furthermore, assistance for the interpretation of relevant impacts, to be deducted from climate change scenarios, on the specific environmental issues in the area is needed. The main barriers identified by the EIA experts therefore include a lack of data as well as general uncertainty as to how far climate change should be considered in the process without reliable data but in the presence of knowledge about possible consequences at an abstract level. A joint strategy on how to cope with uncertain prognoses about main impacts on environmental issues for areas without reliable data requires a discussion and cooperation between EIA consultants and environmental authorities.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号