首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Quality of environmental impact assessments (EIAs) has been criticized, in part due to a lack of accounting in these tools for differing spatial and temporal scales inherent in ecological data. In the United States, leases of outer continental shelf blocks for offshore wind projects and their construction and operation plans require EIAs in accordance with the National Environmental Policy Act of 1969 and the 1978 Council on Environmental Quality Regulations for Implementing the Procedural Provisions of the National Environmental Policy Act. This study evaluated consideration of spatiotemporal scales of stressors, receptors (specifically cetaceans), and effects in eight federal offshore wind energy EIAs against 26 criteria extracted from federal regulations. The criteria analysis determined that EIAs do not consistently or comprehensively address spatiotemporal scales with respect to federal requirements. Deficiencies in addressing spatiotemporal scales may result from imprecise regulations, intent to simplify encyclopedic documents, or lack of data resulting in incomplete assessments, inappropriate mitigation actions, and projects delays. Recommendations to improve compliance with federal regulations include making federal guidance binding, focusing on non-trivial impacts of species, tiering information, and incorporating outcomes of marine spatial planning.  相似文献   

2.
The oil and gas sector is a key driver of the offshore economy. Yet, it is also associated with a number of unwanted environmental impacts which potentially threaten the long term economic and environmental viability of marine ecosystems. Environmental Impact Assessment (EIA) can potentially make a significant contribution to the identification and management of adverse impacts through the promotion of evidence based decision making. However, the extent to which EIA has been embraced by key stakeholders is poorly understood. On this basis, this paper provides an initial evaluation of EIA performance within the oil and gas sector. The methodology adopted for the paper consisted of the structured review of 35 Environmental Statements (ESs) along with interviews with regulators, operators, consultants and advisory bodies. The findings reveal a mixed picture of EIA performance with a significant number of ESs falling short of satisfactory quality and a tendency for the process to be driven by compliance rather than best practice.  相似文献   

3.
Environmental Impact Assessments (EIAs) that are applied in the planning phases of large land-use and construction projects are aimed at aiding decision-making and mitigating significant environmental impacts. In light of the global biodiversity crisis, conducting high-quality biodiversity impact assessments is important, as biodiversity information, among other factors, has the potential to influence how projects will be implemented in the end. We investigated the biodiversity and bird surveys conducted and the number of bird species of conservation concern in peat extraction and wind farm projects to which an EIA was applied to in 1995–2016 in Finland and compared whether these factors differed between the project types and between implemented and unimplemented projects. We also studied the availability of follow-up monitoring data of biodiversity impacts within the two project types. The number of nationally threatened breeding birds was significantly lower in implemented than in unimplemented peat extraction projects. The overall probability of being implemented was significantly negatively associated with the year the EIA began for both project types. All permitted peat extraction projects and 22% of wind farm projects conducted post-construction biodiversity monitoring; however, only some projects enabled before-after comparisons. Our results are in line with earlier findings that demonstrate the difficulty of showing the direct impacts of biodiversity information on EIA decision-making and to what extent it is related to project approval or rejection. The role of follow-up monitoring in the EIA and project development could also be strengthened.  相似文献   

4.
The environmental impact assessment (EIA) has been a tool for decision makers since the enactment of the National Environmental Policy Act (NEPA). Since that time, few analyses have been performed to verify the quality of information and content within EIAs. High quality information within assessments is vital in order for decision makers, stake holders, and the public to understand the potential impact of proposed actions on the ecosystem and wildlife species. Low quality information has been a major cause for litigation and economic loss. Since 1999, wind energy development has seen an exponential growth with unknown levels of impact on wildlife species, in particular bird and bat species. The purpose of this article is to: (1) develop, validate, and apply a quantitative index to review avian/bat assessment quality for wind energy EIAs; and (2) assess the trends and status of avian/bat assessment quality in a sample of wind energy EIAs.This research presents the development and testing of the Avian and Bat Assessment Quality Index (ABAQI), a new approach to quantify information quality of ecological assessments within wind energy development EIAs in relation to avian and bat species based on review areas and factors derived from 23 state wind/wildlife siting guidance documents. The ABAQI was tested through a review of 49 publicly available EIA documents and validated by identifying high variation in avian and bat assessments quality for wind energy developments. Of all the reviewed EIAs, 66% failed to provide high levels of preconstruction avian and bat survey information, compared to recommended factors from state guidelines. This suggests the need for greater consistency from recommended guidelines by state, and mandatory compliance by EIA preparers to avoid possible habitat and species loss, wind energy development shut down, and future lawsuits.  相似文献   

5.
Environmental Impact Assessments (EIAs) are an important analytic tool for identifying and potentially mitigating project risks and negative environmental and societal impacts. Their usefulness, however, depends on how they are implemented and on whether findings are used in public decision-making. Given the notorious vulnerability of public-private interactions to corrupt practices, we examine potential and actual corruption risks across four stages of a generic EIA process. Combined with case analysis of the EIA process in Albania, a Southeastern European context experiencing serious governance challenges, we reflect on the vulnerabilities of EIAs to various forms of corruption from a principal-agent perspective. We concur with earlier research suggesting that the fundamentally rationalist approach behind EIAs do not necessarily match the empirical realities of public environmental decision-making, particularly in less mature EIA systems. We conclude with suggestions for framing a future research agenda in this area and touch on tentative policy remedies.  相似文献   

6.
This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice.  相似文献   

7.
During the discussion on the “Environmental Protection Law Amendment (draft)” in 2011, it was decided to drop the proposed clauses related to environmental impact assessments (EIAs) on policy, which means that there remained no provisions for policy EIAs, and China's strategic environmental assessment system stayed limited to the planning level. However, considering that economic policy making is causing significant direct and indirect environmental problems and that almost every aspect of governmental policy has an economic aspect, EIAs on economic policies are of the utmost urgency. The purpose of this study is to review the EIA work that has been carried out on trade policy in China through four case studies, and illustrate how trade policy EIAs can be helpful in achieving better environmental outcomes in the area of trade. Through the trade policy EIA case studies we try to argue for the feasibility of conducting EIAs on economic policies in China. We also discuss the implications of the case studies from the point of view of how to proceed with EIAs on economic policy and how to promote their practice.  相似文献   

8.
Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take place within an EIA setting. More specifically, we have identified uncertainties involved in each decision-making step and discussed the extent to which these can be treated and managed in the context of an activity or project that may have environmental impacts. To further demonstrate the relevance of the techniques identified, we have examined the extent to which the EIA guidelines currently used in Colombia consider and provide guidance on managing the uncertainty involved in these assessments. Some points that should be considered in order to provide greater robustness in impact assessments in Colombia have been identified. These include the management of stakeholder values, the systematic generation of project options, and their associated impacts as well as the associated management actions, and the evaluation of uncertainties and assumptions. We believe that the relevant and specific techniques reported here can be a reference for future evaluations of other EIA guidelines in different countries.  相似文献   

9.
10.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

11.
Pressures are mounting for the simplification of environmental impact assessment (EIA). This phenomenon is drawing increasing scholarly attention, but studies have not gone far beyond speculating what could happen as a result of recently implemented or proposed regulatory changes. This paper takes a more longitudinal look at simplified EIAs. The main objective was to analyze the perceived outcomes of a number of simplified EIA processes, using Brazil as the empirical context. More specifically, this paper aimed at understanding: 1) how simplified EIAs have been conceptualized and implemented in southeastern Brazil; and 2) how developers and civil servants in that region perceive the outcomes of simplified EIAs. This study adopted a sequential mixed method research approach. Data was collected through literature reviews, 261 telephone-based interviews and 10 face-to-face interviews. Degrees of EIA simplification can vary significantly within and across jurisdictions. In any case, simplification is often framed as a win-win solution to EIA ineffectiveness, through which regulatory and procedural changes are made to ease the process, while, at the same time, maintaining or providing better environmental protection. This approach is more frequently applied to potentially low-impact processes. Chi-square tests of the data collected through telephone interviews in the Brazilian state of Minas Gerais indicated that developers tend to perceive EIA processes as difficult and slow regardless of how simplified it is. Most civil servants, who were directly involved in the implementation of simplified EIAs in state environmental agencies, argued that simplified EIAs are driven mostly by environmental agencies, as these institutions have long been unable to cope with an ever-increasing load of license applications. Policy outcomes of simplified EIAs in the territory are not sufficiently monitored by state agencies. Civil servants revealed concerns about the potential long term effects of EIA simplification on the ground, as they have had limited resources for audits and inspections.  相似文献   

12.
Assessment of the displacement impacts of offshore wind farms on seabirds is impeded by a lack of evidence regarding species-specific reactions to developed sites and the potential ecological consequences faced by displaced individuals. In this study, we present a method that makes best use of the currently limited understanding of displacement impacts. The combination of a matrix table displaying the full range of potential displacement and mortality levels together with seasonal potential biological removal (PBR) assessments provides a tool that increases confidence in the conclusions of impact assessments. If unrealistic displacement levels and/or mortality rates are required to equal or approach seasonal PBRs, this gives an indication of the likeliness of adverse impacts on the assessed population. This approach is demonstrated by assessing the displacement impacts of an offshore wind farm cluster in the German North Sea on the local common guillemot (Uria aalge) population.  相似文献   

13.
The Western Australian Environmental Protection Authority (EPA) in 2002 released Position Statement, No. 3, Terrestrial Biological Surveys as an Element of Biodiversity Protection outlining how terrestrial fauna survey data are to be used and interpreted in the preparation of environmental impact assessments (EIA). In 2004, the EPA released its Guidance for the Assessment of Environmental Factors, Terrestrial Fauna Surveys for Environmental Impact Assessment in Western Australia, No. 56. This paper briefly assesses the adequacy of recent terrestrial fauna surveys undertaken to support publicly released EIAs and indicates that the EPA is not always adhering to its own position and guidance statements. This paper argues that the current fauna survey guidelines are in need of improvement. The approach and requirements of some other Australian states are briefly assessed to identify similarities and where improvements can be made to the Western Australian (WA) guidelines. This paper concludes with suggestions on how the process and the guidelines in WA can be revised to more adequately assess the impact of developments on terrestrial vertebrate biodiversity and ecosystem function. These suggestions may have relevance for other areas where fauna surveys are undertaken to support EIAs.  相似文献   

14.
Environmental impact assessment (EIA) processes are grounded on the assumption that producing information about environmental impacts will yield better environmental decisions. Despite the ubiquity of EIA as a policy tool, there is scant evidence of its environmental, social, or economic impacts. Focusing on Environmental Impact Statements (EIS) prepared for water and energy-related projects under the US National Environmental Policy Act, this analysis addresses two questions: (1) What is the balance of environmental impacts associated with infrastructure decisions?; and (2) How does the content of stakeholder feedback received during the review phase differ from draft EIS content, and does this correspond to any changes in the final EIS? We demonstrate the use of automated text mining approaches to identify the distribution of impacts, measure the content of public comments, and observe whether values reflected in comments are associated with a shift in emphases between the draft and final EIS. EISs are shown to convey evenly distributed focus across multiple impact areas. However, we observe no substantive change in focal emphasis between draft and final issuances. This calls into question assumptions about the role that public participation plays in bringing new information to light or changing the course of action.  相似文献   

15.
16.
While the development of maritime economic activity is increasingly encouraged, the consideration of its impacts constitutes a real challenge. The limitations of the implementation of the mitigation hierarchy have been widely discussed in scientific literature, yet data on marine biodiversity offset practices remains scarce. In this study, we investigated the use of Environmental Impact Assessments (EIAs) as suitable instruments to achieve the No Net Loss objective. Drawing on a French approach developed for the initial assessment of the European Marine Strategy Framework Directive, we examined the pressures and impacts related to various marine development projects and the effectiveness of the mitigation hierarchy in limiting these. An analysis of 55 recent French environmental impact studies showed that only 7% of the proposed measures had the aim of offsetting predicted degradation of sites of remarkable biodiversity. This can be partly explained by the lack of a clear definition of ‘significant impact’, which varies greatly depending on what is impacted, in turn allowing socio-economic activities to benefit more easily from offset. Furthermore, offsetting does not always constitute the final step of the mitigation hierarchy, highlighting the need to reinforce avoidance and reduction steps. Although we acknowledge the role of EIA in mitigating the negative impacts of development projects, synergies with other European marine environmental policies such as the Marine Strategy Framework Directive (MSFD) and the Maritime Spatial Planning directive (MSP) should be developed in order to improve current practices.  相似文献   

17.
Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

18.
The Environmental Impact Assessment (EIA) Act of 1992 aimed to make the environment a central theme in development in Nigeria. Nevertheless, the extent of engagement with local cultures in the Nigerian EIA process is not statutorily guaranteed. While most EIAs in Nigeria have been for oil and gas projects in the Niger Delta, and have focused strongly on the biophysical environment, socio-economic and cultural aspects have remained marginal. The palpable neglect of community perceptions and cultural diversity in social impact assessment (SIA) in this region prone to conflict has tended to alienate the people in the decision-making process. Thus, despite claims to compliance with regulatory requirements for EIAs, and numerous purported sustainable development initiatives by international oil companies (IOCs), the region continues to face multiple sustainability challenges. This paper situates local perceptions and cultural diversity in participatory development and canvasses the integration of community perceptions and cultural diversity into SIA in the Niger Delta region. It is argued that doing this would be critical to ensuring acceptance and success of development actions within the context of local culture while also contributing to sustainable development policy in the region.  相似文献   

19.
This paper examines the spread and development of ‘environmental impact assessment’ (EIA) since the enactment of the U.S. Environmental Policy Act on January 1, 1970, which established for the first time under any jurisdiction the formal requirement that an EIA be made and that an ‘environmental impact statement’ (EIS) be filed prior to implementation of certain major development projects. The paper is divided into three parts. In the first part, we briefly review the forms of EIA introduced in the western industrial countries and contrast these with developments in the socialist countries of Eastern Europe, and in the Third World. The approaches to EIA adopted by five countries — the United States, Australia, Canada, the Federal Republic of Germany, and the Soviet Union — are used to illustrate the types of national approaches that have been followed. In the second part of the paper, we use some questions raised by impact assessments as codified in legislation or regulations at the national level to highlight some of the limitations of impact assessment. Finally, we turn to international impact assessments and describe the modest progress made to date. Key impediments to the development of appropriate conceptual and institutional frameworks and methodologies for international EIAs are noted. In conclusion, we offer some suggestions about needed actions at both the national and international levels.  相似文献   

20.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号