首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Brazil's Tucuruí Dam provides valuable lessons for improving decision-making on major public works in Amazonia and elsewhere. Together with social impacts, which were reviewed in a companion paper, the project's environmental costs are substantial. Monetary costs include costs of construction and maintenance and opportunity costs of natural resources (such as timber) and of the money invested by the Brazilian government. Environmental costs include forest loss, leading to both loss of natural ecosystems and to greenhouse gas emissions. Aquatic ecosystems are heavily affected by the blockage of fish migration and by creation of anoxic environments. Decay of vegetation left in the reservoir creates anoxic water that can corrode turbines, as well as producing methane and providing conditions for methylation of mercury. Defoliants were considered for removing forest in the submergence area but plans were aborted amid a public controversy. Another controversy surrounded impacts of defoliants used to prevent regrowth along the transmission line. Mitigation measures included archaeological and faunal salvage and creation of a “gene bank” on an island in the reservoir. Decision-making in the case of Tucuruí was virtually uninfluenced by environmental studies, which were done concurrently with construction. The dam predates Brazil's 1986 requirement of an Environmental Impact Assessment. Despite limitations, research results provide valuable information for future dams. Extensive public-relations use of the research effort and of mitigation measures such as faunal salvage were evident. Decision-making was closely linked to the influence of construction firms, the military, and foreign financial interests in both the construction project and the use of the resulting electrical power (most of which is used for aluminum smelting). Social and environmental costs received virtually no consideration when decisions were made, an outcome facilitated by a curtain of secrecy surrounding many aspects of the project. Despite improvements in Brazil's system of environmental impact assessment since the Tucuruí reservoir was filled in 1984, many essential features of the decision-making system remain unchanged.  相似文献   

2.
Summary Environmental issues are rarely straightforward. The construction of the Tellico Dam not only proved to be an exceptionally complex environmental problem but also developed into a major political issue in its own right. Following the discovery of a previously unknown species of fish near the site of the nearly completed dam, environmentalists began a long legal battle to halt construction work and protect the habitat of the fish. The United States Supreme Court found in their favour, but local political interests, through a series of clever manoeuvres, succeeded in exempting the dam from all legislation to secure its completion. The blatant use of political expediency to resolve an environmental dilemma makes the Tellico Dam a classic case study for students of environmental policy and decision-making.Graham Bennett was born in London in 1948 and graduated from the School of Environmental Sciences at the University of East Anglia where he also completed his doctoral research. Since 1980 he has been working in The Netherlands as an Associate in the Department of Environmental Science at the Catholic University of Nijmegen. His research interests lie in the field of environmental management and he is currently involved in the study of environmental policy making in Britain and The Netherlands with particular reference to the control of pollution by local authorities.  相似文献   

3.
The Balbina Dam in Brazil's state of Amazonas floods 2360 km2 of tropical forest to generate an average of only 112.2 MW of electricity. The flat topography and small size of the drainage basin make output small. Vegetation has been left to decompose in the reservoir, resulting in acidic, anoxic water that will corrode the turbines. The shallow reservoir contains 1500 islands and innumerable stagnant bays where the water's residence time will be even longer than the average time of over one year. Balbina was built to supply electricity to Manaus, a city that has grown so much while the dam was under construction that other alternatives are already needed. Government subsidies explain the explosive growth, including Brazil's unified tariff for electricity. Alternative power sources for Manaus include transmission from more distant dams or from recently discovered oil and natural gas deposits. Among Balbina's impacts are loss of potential use of the forest and displacement of about one third of the surviving members of a much-persecuted Amerindian tribe: the Waimiri-Atroari. The dam was closed on 1 October 1987 and the first of five generators began operation in February 1989. The example of Balbina points to important ways that the decision-making process could be improved in Brazil and in the international funding agencies that have directly and indirectly contributed to the project. Environmental impact analyses must be completed prior to decisions on overall project implementation and must be free of influence from project proponents. The current environmental impact assessment system in Brazil, as in many other countries, has an undesirable influence on science policy, in addition to failing to address the underlying causes of environmentally destructive development processes and inability to halt irreversible projects like Balbina.  相似文献   

4.
/ There are tens of thousands of small dams in the United States; many of these aging structures are deteriorating. Governments and dam owners face decisions regarding repair or removal of these structures. Along with the many benefits society derives from dams and their impoundments, numerous recent ecological studies are revealing the extensive alteration and degradation of river ecosystems by dams. Dam removal-a principal restoration strategy-is an infrequent event. The major reasons for removal have been public safety and the high costs associated with repair; the goal of river ecosystem restoration now warrants greater attention. Substantial study is being given to the environmental aspects of dams and dam removals, but very little attention has been given to the socioeconomic and institutional dimensions associated with the removal of dams, although these factors play a significant role in the removal decision-making process. Based on a case study of dam removals in Wisconsin-where more than 30 of the state's 3600 small dams have been removed in the past few decades-legal, financial, and socioeconomic issues associated with dam removal are documented and assessed. Dam removal has been complex and contentious, with limited community-based support for removal and loss of the impounded waters. In cases examined here, the estimated costs of repairing a dam averaged more than three times the cost of removal. The availability of governmental financing has been a key determinant in removal decisions. Watershed-scale ecological considerations are not major factors for most local interests. As watershed management and restoration increasingly include dam removal options as part of an integrated strategy, more attention will need to be focused on socioeconomic factors and stakeholder perspectives-variables that strongly influence the viability of this management alternative.KEY WORDS: Dam removal; River restoration; Institutions; Stakeholders  相似文献   

5.
Development projects are rapidly changing the landscape in Brazilian Amazonia. Environmental impact assessments have been required since 1986, and the regulatory system is evolving as precedents are set by each new development project. The Jatapu Dam in Roraima provides an illustration of underlying impediments to assessment of environmental costs and to due consideration being given to these assessments when decisions are made. The high priority placed on the dam by the Roraima state government is unexplainable in terms of economic returns. The place of the dam in a long-term political strategy provides the best of several possible explanations, any one of which is incompatible with a rational weighing of economic and environmental costs and benefits. A number of lessons can be drawn from the experience of Jatapu, but some of the problems have no solution. The barriers to rational decision making illustrated by Jatapu apply to development projects in many parts of the world.  相似文献   

6.
This article develops a decision-making framework for environmental management that integrates technical, economic, political and legal, and ethical decision levels. It attempts to show how these decision levels can be ordained, integrated and interconnected and postulates a hierarchic concentric sphere system that proposes an environmental management model for long-term solutions. This model can be used as a check list for environmental management decision-making and also as a guide for environmental conflict resolution where environmental problems necessitate several levels of decision making. It integrates various environmental ethical positions and evaluates political decisions into a comprehensive, broadly applicable multidisciplinary approach. The objective of this decision-making model is to interconnect into a simplified sequence different levels of environmental management processes in order to account for sustainability, efficacy, efficiency and the acceptability of environmental management processes in the long term. This is done by observing when an environmental problem needs to be solved within a certain sphere of solutions and when it requires wider frameworks, how these can be established and how this process proves that solidarity is the widest and most reasonable sphere.  相似文献   

7.
“Avança Brasil” (Forward Brazil) is a package of 338 projects throughout Brazil; the portion of the plan to be carried out in Brazil's Legal Amazon region totals US$43 billion over 8 years, US$20 billion of which would be for infrastructure causing environmental damage. Brazil's environmental impact assessment system is not yet capable of coping with the challenge presented by Avança Brasil. Generic problems with the licensing process include stimulation of a lobby in favor of construction before decisions are made on the advisability of the projects, the “dragging effect” of third parties, whereby economic activity is attracted to the infrastructure but escapes the environmental impact assessment system, a tendency for consulting firms to produce favorable reports, a bureaucratic emphasis on the existence of steps without regard to the content of what is said, and the inability to take account of the chain of events unleashed when a given project is undertaken.The environmental and social costs of forest loss are high; among them is loss of opportunities for sustainable use of the forest, including loss of environmental services such as biodiversity maintenance, water cycling, and carbon storage. The benefits of export infrastructure are meager, especially from the point of view of generating employment. Much of the transportation infrastructure is for soybeans, while the hydroelectric dams contribute to processing aluminum. The example of Avança Brasil makes clear the need to rethink how major development decisions are made and to reconsider a number of the plan's component projects.  相似文献   

8.
The core element of the Costa Rican forestry policy is a financial instrument called the environmental service payment. This instrument rewards forest owners for the environmental services (the mitigation of greenhouse gases, the protection of watersheds and scenic beauty, and the development of biodiversity) their forests provide. In this article, the experiences with this new instrument are analyzed by focusing on the way interests are represented and access is granted, the openness of information exchange, whether social learning occurred, and whether decision-making authority is shared. The analysis is based on a survey conducted in the Huetar Norte Region and on in-depth interviews with the major stakeholders. The Costa Rican case indicates that financial instruments can be used to share responsibilities and that stakeholders can successfully cooperate on forest issues. It also shows that such a participatory approach is only promising if certain cultural, economic, organizational, and political conditions are met.  相似文献   

9.
环境信息公开作为信息化时代环境治理的新型武器,对我国这样一个具有特殊财政体制和政治激励模式的发展中国家而言,其在污染防治攻坚战中的效果有待深入探究。本文基于城市污染源监管信息公开指数(PITI),以2008—2016年120个城市数据为样本,采用动态面板数据模型和系统GMM估计方法,实证检验了环境信息公开的污染减排效应,并重点分析了不同城市区位和城市规模下存在的异质性效应。结果表明:环境信息公开有助于污染防治,改善环境质量,还能有效缓解财政分权引致的环境污染问题。环境信息公开对污染排放的抑制作用呈现“马太效应”,对东、中、西部地区和大、中、小城市的影响均依次递减。对东、中部地区和大、中型城市,其治污效应较显著,而在西部地区和小城市尚不见效。积极推动全面环境信息公开,构建环境多元共治的长效机制,是决胜污染防治攻坚战的关键所在。  相似文献   

10.
The Colorado River system exhibits the characteristics of a heavily over-allocated or 'closing water system'. In such systems, development of mechanisms to allow resource users to acknowledge interdependence and to engage in negotiations and agreements becomes necessary. Recently, after a decade of deliberations and environmental assessments, the Glen Canyon Dam Adaptive Management Program (GCDAMP) was established to monitor and analyze the effects of dam operations on the Grand Canyon ecosystem and recommend adjustments intended to preserve and enhance downstream physical, cultural and environmental values. The Glen Canyon Dam effectively separates the Colorado into its lower and upper basins. Dam operations and adaptive management decisions are strongly influenced by variations in regional climate. This paper focuses on the management of extreme climatic events within the Glen and Grand Canyon Region of the Colorado River. It illustrates how past events (both societal and physical) condition management flexibility and receptivity to new information. The types of climatic information and their appropriate entry points in the annual cycle of information gathering and decision-making (the 'hydro-climatic decision calendar') for dam operations and the adaptive management program are identified. The study then describes how the recently implemented program, lessons from past events, and new climate information on the Colorado River Basin, facilitated responses during the major El Ni?o-Southern Oscillation (ENSO) event of 1997-1998. Recommendations are made for engaging researchers and practitioners in the effective use of climatic information in similar settings where the decision stakes are complex and the system uncertainty is large.  相似文献   

11.
The type of contract model may have a significant influence on achieving project objectives, including environmental and climate change goals. This research investigates non-standard contract models impacting greenhouse gas emissions (GHG) in transport infrastructure construction in Australia. The research is based on the analysis of two case studies: an Early Contractor Involvement (ECI) contract and a Design and Construct (D&C) contract with GHG reduction requirements embedded in the contractor selection. Main findings support the use of ECIs for better integrating decisions made during the planning phase with the construction activities, and improve environmental outcomes while achieving financial and time savings.  相似文献   

12.
The Hetch Hetchy System provides San Francisco with most of its water supply. O'Shaughnessy Dam is one component of this system, providing approximately 25 percent of water storage for the Hetch Hetchy System and none of its conveyance. Removing O'Shaughnessy Dam has gained interest for restoring Hetch Hetchy Valley. The water supply feasibility of removing O'Shaughnessy Dam is analyzed by examining alternative water storage and delivery operations for San Francisco using an economic engineering optimization model. This model ignores institutional and political constraints and has perfect hydrologic foresight to explore water supply possibilities through reoperation of other existing reservoirs. The economic benefits of O'Shaughnessy Dam and its alternatives are measured in terms of the quantity of water supplied to San Francisco and agricultural water users, water treatment costs, and hydropower generation. Results suggest there could be little water scarcity if O'Shaughnessy Dam were to be removed, although removal would be costly due to additional water treatment costs and lost hydropower generation.  相似文献   

13.
Cities, regional governments and their local utilities are taking leading roles in programmes to reduce greenhouse gas emissions. Agenda 21 highlighted the need for such local action to achieve the goals of the 1992 Earth Summit and the United Nations Framework Convention on Climate Change. This trend of increasing local action was demonstrated dramatically in Canada in 2006 when the newly elected federal government cancelled many of the previous government's climate change programmes. The EnerGuide for Houses Program illustrates the growing importance of local decisions where the federal government developed a home energy rating system that was delivered through a range of partnerships across the country. Despite all political parties voting to increase funding for the programme in 2005, the Conservative government cancelled it in May 2006. The response by provincial and local governments was immediate. Their actions revealed the ability and desire among lower-tier governments to sustain popular climate change initiatives. Both the political responses and financial implications are included in the examination of the shift in environmental responsibility from the national to the local sphere.  相似文献   

14.
This review of the literature on environmental auditing and the potential role of accountants distinguishes between compliance audits and audits of the environmental management system. After an extensive introduction to the concept, this review focuses on the similarities and differences between an environmental audit and a financial statement audit. The general approach to both types of audits is similar, except that environmental audits are largely unregulated. Both audits place an emphasis on the evaluation of control systems, which is an argument in favor of external auditors playing a role in environmental audits. Another argument for including external accountants is their code of ethics. However, these professionals seem to be reluctant to enter the field of environmental auditing. It is argued that this reluctance is because of a lack of generally accepted principles for conducting environmental audits. If external accountants are engaged in environmental auditing, they should be part of multidisciplinary teams that also include scientists and engineers to avoid a too strong focus on procedures. Rather than treating these audits as totally different, it is proposed that there be a move towards integrated, or even universal, audits.  相似文献   

15.
Cities, regional governments and their local utilities are taking leading roles in programmes to reduce greenhouse gas emissions. Agenda 21 highlighted the need for such local action to achieve the goals of the 1992 Earth Summit and the United Nations Framework Convention on Climate Change. This trend of increasing local action was demonstrated dramatically in Canada in 2006 when the newly elected federal government cancelled many of the previous government's climate change programmes. The EnerGuide for Houses Program illustrates the growing importance of local decisions where the federal government developed a home energy rating system that was delivered through a range of partnerships across the country. Despite all political parties voting to increase funding for the programme in 2005, the Conservative government cancelled it in May 2006. The response by provincial and local governments was immediate. Their actions revealed the ability and desire among lower-tier governments to sustain popular climate change initiatives. Both the political responses and financial implications are included in the examination of the shift in environmental responsibility from the national to the local sphere.  相似文献   

16.
Although the benefits of dam construction are numerous, particularly in the context of climate change and growing global demand for electricity, recent experience has shown that many dams have serious negative environmental, human, and political consequences. Despite an extensive literature documenting the benefits and costs of dams from a single disciplinary perspective, few studies have simultaneously evaluated the distribution of biophysical, socio-economic, and geopolitical implications of dams. To meet the simultaneous demands for water, energy, and environmental protection well into the future, a broader view of dams is needed. We thus propose a new tool for evaluating the relative costs and benefits of dam construction based on multi-objective planning techniques. The Integrative Dam Assessment Modeling (IDAM) tool is designed to integrate biophysical, socio-economic, and geopolitical perspectives into a single cost/benefit analysis of dam construction. Each of 27 different impacts of dam construction is evaluated both objectively (e.g., flood protection, as measured by RYI years) and subjectively (i.e., the valuation of said flood protection) by a team of decision-makers. By providing a visual representation of the various costs and benefits associated with two or more dams, the IDAM tool allows decision-makers to evaluate alternatives and to articulate priorities associated with a dam project, making the decision process about dams more informed and more transparent. For all of these reasons, we believe that the IDAM tool represents an important evolutionary step in dam evaluation.  相似文献   

17.
从组织保障、法规政策、监督管理、经济、技术等角度提出了保障南水北调工程环境管理工作有效实施的保障措施,并从加强统一领导和部门协调,推广和完善环境保护目标责任制,法制建设,对重大决策、规划与建设项目实施全过程监督和环境监测能力建设等方面进行了初步探讨.  相似文献   

18.
The article explores the historical process of creating unjust environmental conditions in one geographical area in the Finnish capital, Helsinki. The study traces back the decision-making processes about placing environmentally burdensome, communal facilities, such as power plants, waste disposal and other infrastructural facilities. Also the lack of environmental amenities is investigated. The study covers a time period from the latter half of the nineteenth century to the 1980s. The historical analysis of the development of land-use decisions in the city is based on documentary and archival sources about the decision-making processes and it is conducted in the framework of distributive and procedural environmental justice. Four different periods of siting policies are identified. The motives for land-use decisions at each phase reflect geographical, political and historical reasoning. The concept of path dependency is introduced to explain, how environmental injustices were reproduced because of past paths of siting policies locked in subsequent decisions and created a negative twist of accumulating environmental burden.  相似文献   

19.
国家“十四五”环境经济政策改革路线图   总被引:6,自引:6,他引:0       下载免费PDF全文
"十三五"时期环境经济政策对建立我国生态文明建设长效机制发挥了重要作用,"十四五"时期需要通过进一步深化环境经济政策改革与创新以适应新时代生态文明建设需要。本文研究提出了我国"十四五"时期环境经济政策改革思路、框架与重点,认为我国"十四五"时期环境经济政策改革要深入贯彻习近平生态文明思想,系统考虑政策改革创新面临的新形势和新要求,推进建立"两山"转化和环境质量达标的长效激励机制,突出环境质量持续改善激励、突出经济过程全链条调控,突出政策手段的系统优化与协同增效,突出政策执行能力保障。继续推进生态环境财政制度改革,深化绿色价格税费机制创新,推进建立多元化、市场化生态补偿制度,健全生态环境权益交易机制,完善绿色金融体系,并同步推进完善生态环境价值核算、环境信息公开和信用体系、资源环境名录、政策绩效评估等政策实施配套能力建设,构建全面支撑生态文明建设的环境经济政策体系,推进环境治理体系和治理能力现代化。  相似文献   

20.
中国煤电行业的发展伴随着各种环境风险,本文以典型煤电企业为例,在产能过剩、能效标准提高、环境保护税、全国碳市场、水资源税和非水可再生能源规划目标的风险约束下,建立环境成本内部化和环境风险分析工具,考虑不同压力情境下对煤电企业价值的影响,构建环境风险影响财务成本的压力测试框架。结果表明,对单个风险而言,产能过剩和碳市场风险对企业价值的影响是大多数地区在不同情景中面临的主要风险驱动因素。对于综合风险压力测试而言,各地区1 000MW超超临界机组乐观情景及悲观情景的企业价值距合理回报预期企业价值相差小,而300MW和600MW亚临界机组因能效水平低、经营成本高等原因在环境风险压力下企业价值偏离合理回报较多。随着环境风险严重程度的不断增加,环境压力测试有助于煤电企业和金融机构了解环境风险对企业财务状况的影响,从而对投资决策产生影响。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号