首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   9篇
  免费   0篇
环保管理   1篇
综合类   2篇
基础理论   4篇
污染及防治   2篇
  2020年   1篇
  2016年   1篇
  2008年   1篇
  2005年   1篇
  1994年   1篇
  1984年   1篇
  1982年   2篇
  1979年   1篇
排序方式: 共有9条查询结果,搜索用时 15 毫秒
1
1.
The use of mathematical modelling for investigation of the efficiency of existing monitoring sites for the impact of SO(2) emissions from power stations in the state of Kuwait is described. The Industrial Source Complex Short Term (ISCST3) model is utilised to obtain the spatial and temporal variations of SO(2) over residential areas. Statistical comparison between the 50 highest daily measured and predicted SO(2) concentrations at six monitoring sites shows that the model is capable of generating results with accuracy of 60--94%. An important conclusion of this work is that the existing locations of the Kuwait-EPA monitoring stations are not suitable for measuring the actual impact of SO(2). Therefore, there is a need for relocation of these sites to register the highest levels of SO(2) emitted from the current power stations in the state of Kuwait.  相似文献   
2.
An interactive optimization methodology for allocating the number and configuration of an Air Quality Monitoring Network (AQMN) in a vast area to identify the impact of multiple pollutants is described. A mathematical model based on the multiple cell approach (MCA) was used to create monthly spatial distributions for the concentrations of the pollutants emitted from different emission sources. These spatial temporal patterns were subject to a heuristic optimization algorithm to identify the optimal configuration of a monitoring network. The objective of the optimization is to provide maximum information about multi-pollutants (i.e., CO, NO(x) and SO(2)) emitted from each source within a given area. The model was applied to a network of existing refinery stacks and the results indicate that three stations can provide a total coverage of more than 70%. In addition, the effect of the spatial correlation coefficient (R(C)) on total area coverage was analyzed. The modeling results show that as the cutoff correlation coefficient R(C) is increased from 0.75 to 0.95, the number of monitoring stations required for total coverage is increased. A high R(C) based network may not necessarily cover the entire region, but the covered region will be well represented. A low R(C) based network, on the other hand, would offer more coverage of the region, but the covered region may not be satisfactorily represented.  相似文献   
3.
The landscape architecture profession is a source of creative thinking and planning which is relatively untapped within the mining industry in the United States of America. The landscape architect has been active in European operations for years as indicated by the four examples presented. The landscape architect can provide an important interface with mine design and engineering and environmental affairs. To initiate this interface within the United States, and increase its effectiveness, six objectives are presented and discussed.  相似文献   
4.
Petrochemical Industries Company (PIC) in Kuwait has mitigated the pollution problem of ammonia and urea dust by replacing the melting and prilling units of finished-product urea prills with an environmentally friendly granulation process. PIC has financed a research project conducted by the Coastal and Air Pollution Program’s research staff at the Kuwait Institute for Scientific Research to assess the impact of pollution control strategies implemented to maintain a healthy productive environment in and around the manufacturing premises. The project was completed in three phases: the first phase included the pollution monitoring of the melting and prilling units in full operation, the second phase covered the complete shutdown period where production was halted completely and granulation units were installed, and the last phase encompassed the current modified status with granulation units in full operation. There was substantial decrease in ammonia emissions, about 72%, and a 52.7% decrease in urea emissions with the present upgrading of old melting and prilling units to a state-of-the-art technology “granulation process” for a final finished product. The other pollutants, sulfur dioxide (SO2), nitrogen oxides (NOx), and volatile organic compounds (VOCs), have not shown any significant change, as the present modification has not affected the sources of these pollutants.

Implications: Petrochemical Industries Company (PIC) in Kuwait has ammonia urea industries, and there were complaints about ammonia and urea dust pollution. PIC has resolved this problem by replacing “melting and prilling unit” of final product urea prills by more environmentally friendly “granulation unit.” Environmental Pollution and Climate Program has been assigned the duty of assessing the outcome of this change and how that influenced ammonia and urea dust emissions from the urea manufacturing plant.  相似文献   

5.
Prenatal diagnosis choices were reviewed in 473 women who presented for genetic counselling prior to 11 weeks' gestation for the indication of advanced maternal age. Group A consisted of 336 patients who were unaware of a possible association between chorionic villus sampling (CVS) and limb defects. Group B consisted of 137 patients who were provided this information. Fifty-one per cent of patients in group A and 45 per cent of patients in group B chose CVS. This difference was not significant by χ2 analysis (P = 0·7). Patterns of prenatal diagnosis procedure utilization from 1987 to 1992 revealed a significant reduction in CVS utilization accompanied by a corresponding increase in amniocentesis after the association between CVS and limb defects was publicized. Referrals for CVS counselling also significantly declined. However, acceptance rates did not change for those patients who received genetic counselling. First-trimester genetic counselling, including a discussion regarding a possible association between CVS and limb defects, helps patients make informed decisions concerning prenatal diagnosis options, and, in our population, resulted in no change in CVS acceptance rates.  相似文献   
6.
While larger mineral resource development projects offer new jobs and provide a stimulus to the economy of the area where they are sited, they may also pose problems in rural areas associated with rapid population growth. The purpose of an impact management programme is to anticipate and alleviate project effects that are generally perceived as undesirable and to enhance effects that are beneficial to site area communities. While the effective management of project effects is the end towards which all impact assessment efforts are directed, an integrated approach to impact management has been notably lacking. This paper suggests a systems framework for meeting this need by: (1) reviewing the need for impact management efforts; (2) discussing the objectives of, and considerations in, designing impact management programmes; (3) presenting a conceptual framework for, and key components of, such a programme; and (4) suggesting an approach for implementing such a system as an integral part of the project development process.  相似文献   
7.
Deer movements around surface coal mines were investigated in Preston Country, West Virginia, USA. Seventy-two deer crossings were counted on 29 surface mines with only 8% found on highwalls with more than 20% rock or stone. Thus, although slope was important, the percentage of dirt on the highwall determined use as a crossing location for deer. The average distance between all deer crossing was 209.7 m but the distance between the end of the highwall and the nearest highwall crossing was 248.7 m indicating reluctance of deer to cross mines when they could walk around them. Winter snow track counts showed fewer deer within 90 m of the top edge of the highwall. Four land bridges traversed the highwall and were heavily utilized by deer, especially in March, April, May, October and November. The surface mine bench was used as a fawn bedding area, but little feeding occurred on this portion of the mine.  相似文献   
8.
Reclamation of processed oil shale disposal areas in the arid and semi-arid regions of Utah, Colorado and Wyoming faces several challenging problems. Shallow topsoil, harsh climate and limited water supply and low suitability of processed oil shale as a plant growth medium must be addressed if any reclamation plan is to be successful.A prototype reclamation plan that addressed the harsh environmental conditions was proposed early in the development of oil shale in eastern Utah. Studies to validate the reclamation plan were initiated in 1978 on a simulated oil shale disposal area at Anvil Points, Colorado.Four native shrubs, one forb and a grass, were successfully established by planting container-grown transplants into a topsoil-filled V-shaped trench. Supplemental water was provided from an adjacent water harvesting slope. The roots of the transplanted species grew into the adjacent shale from the soil trench, thus indicating their adaptability to the adverse oil shale conditions.Support for this research was provided by the White River Shale Corporation, Salt Lake City, Utah.  相似文献   
9.
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号