首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
污染及防治   1篇
评价与监测   1篇
  2021年   1篇
  2007年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
The environmentally prevalent polybrominated diphenyl ether (PBDE) #47 and polychlorinated biphenyls (PCBs) #28 and #118 were challenged for 24 hours with a novel biomass-supported Pd catalyst (Bio-Pd(0)). Analysis of the products via GC-MS revealed the Bio-Pd(0) to cause the challenged compounds to undergo stepwise dehalogenation with preferential loss of the least sterically hindered halogen atom. A mass balance for PCB #28 showed that it is degraded to three dichlorobiphenyls (33.9%), two monochlorobiphenyls (12%), and biphenyl (30.7%). The remaining mass was starting material. In contrast, while PCB #118 underwent degradation to yield five tetra- and five trichlorinated biphenyls, no less chlorinated products or biphenyl were detected, and the total mass of degraded products was 0.3%. Although the Bio-Pd(0) material was developed for treatment of PCBs, a mass balance for PBDE #47 showed that the biocatalyst could prove a potentially useful method for treatment of PBDEs. Specifically, 10% of PBDE #47 was converted to identifiable lower brominated congeners, predominantly the tribrominated PBDE #17 and the dibrominated PBDE #4, 75% remained intact, while 15% of the starting mass was unaccounted for.  相似文献   
2.

Wastewater treatment plants (WWTP) are highly non-linear operations concerned with huge disturbances in flow rate and concentration of pollutants with uncertainties in the composition of influent wastewater. In this work, the activated sludge process model with seven reactor configuration in the ASM3bioP framework is used to achieve simultaneous removal of nitrogen and phosphorus. A total of 8 control approaches are designed and implemented in the advanced simulation framework for assessment of the performance. The performance of the WWTP (effluent quality index and global plant performance) and the operational costs are also evaluated to compare the control approaches. Additionally, this paper reports a comparison among proportional integral (PI) control, fuzzy logic control, and model-based predictive control (MPC) configurations framework. The simulation outcomes indicated that all three control approaches were able to enhance the performance of WWTP when compared with open loop operation.

  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号