首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Factors influencing sediment availability are assessed and erosion rates are quantified for an off‐highway vehicle (OHV) trail system in the Ouachita Mountains of Arkansas. As of May 2012, the Wolf Pen Gap trail system included 77.0 km of "trails" which consist of county roads; open and closed Forest Service roads; and open and closed OHV trails. For a given trail length, the sediment volume available to be eroded is determined by bare trail width and sediment depth. Four condition types are defined that group trail sections based on statistically different trail widths or depths. Trail construction method appears to influence sediment availability differences more than erosion potential (as indexed by trail slope gradient and length). The range for annual trail erosion rates is estimated as 75 and 210 tonne/ha/yr. The high and low rates are obtained using two independent methods. The 210 tonne/ha/yr rate is computed from mean sediment capture at 30 sediment traps installed for 0.5–1.0 year. The 75 tonne/ha/yr rate is computed assuming all available trail sediment measured in a one‐time sampling is eroded over the next year. We argue in support of this assumption and suggest both rate values may be conservative. Trail erosion rates and sediment trap observations indicate frequent trap cleanout will be needed to continue sediment capture from All Terrain Vehicle trails.  相似文献   

2.
The flow of sediment particles in rivers is a big challenge to develop hydropower plants across the sediment-laden rivers. Hard particles such as quartz and feldspar are available in high amount in the Asian mountain range. The abrasive action of these particles causes the hydro turbines to suffer from erosion in particular at high- and medium-head hydroelectric power plants. This has become a serious economic issue due to maintenance costs and production losses. The treatment without prevention is simply unsustainable. Facilities for sediment exclusion, typically sand traps as well as turbine design, and materials have been improved considerably. In the present paper, studies have been discussed extensively undertaken by several investigators in this field. Based on literature survey several aspects related to reducing the sediment load on turbines, useful ways to improve the turbine surface performance and various erosion models to characterize the effect of erosion on the performance of turbines have been discussed. To calibrate and validate the developed erosion models, more measurements from both physical model tests in laboratories and continuous monitoring of sediment parameters and their impact on the operational hydro turbines are required. As well as the state-of-art in the modeling and simulation using computational fluid dynamics (CFD) has made it possible to optimize the hydraulic design of hydro turbines in order to minimize the erosion level without much sacrifice in the efficiency. To mitigate the hydro-abrasive erosion effects on the performance of turbines, significant improvements have been achieved so far and development is ongoing.  相似文献   

3.
Forestry best management practices (BMPs) reduce sedimentation by minimizing soil erosion and trapping sediment. These practices are particularly important in relation to road construction and use due to the heightened potential for sediment delivery at stream crossings. This study quantifies the implementation and effectiveness of BMPs at 75 randomly selected forest road stream crossings on recent timber harvests in the Mountains, Piedmont, and Coastal Plain regions of Virginia. Road characteristics at stream crossings were used to estimate erosion using the Universal Soil Loss Equation for Forests and the Water Erosion Prediction Project for Roads. Stream crossings were evaluated based on the Virginia Department of Forestry (VDOF) BMP manual guidelines and categorized as BMP?, BMP‐standard, or BMP+ based on the quality of road template, drainage, ground cover, and stream crossing structure. BMP implementation scores were calculated for each stream crossing using VDOF audit questions. Potential erosion effects due to upgrading crossings were estimated by adjusting ground cover percentage and approach length parameters in the erosion models. Results indicate that erosion rates decrease as BMP implementation scores increase (p < 0.05). BMP‐standard and BMP+ ratings made up 83% of crossings sampled, with an average erosion rate of 6.8 Mg/ha/yr. Hypothetical improvements beyond standard BMP recommendations provided minimal additional erosion prevention.  相似文献   

4.
Abstract: Unpaved roads are a primary sediment source in forested watersheds. Validation of erosion models and improvements to road management require information on road erosion rates and the factors controlling erosion. This study measured sediment yields from twenty ~0.05 ha unsurfaced (native) road plots in Belt Supergroup and glacial till parent materials of western Montana, and investigated the factors controlling erosion. Annual sediment yields for individual plots ranged from 0 to 96.9 Mg/ha/yr over 3 years (2002‐2004). Annual mean sediment yield ranged from 2.1 Mg/ha in 2003 to 9.9 Mg/ha in 2004 with an overall mean of 5.4 Mg/ha/yr. The mean of log‐transformed sediment yields for sites in glacial till parent materials was higher than Belt Supergroup parent materials (p = 0.063). A regression model with road slope, time since last grading, roadbed gravel content, and precipitation as predictive variables explained 68% of the variability in sediment yield (F = 28.2; p < 0.0001). Road erosion in western Montana is limited by low erodibility of the dominant parent materials and low rainfall. Management procedures such as reducing the frequency of grading can significantly reduce sediment yields from forest roads.  相似文献   

5.
Human alterations to the Iowa landscape, such as elimination of native vegetation for row crop agriculture and grazing, channelization of streams, and tile and ditch drainage, have led to deeply incised channels with accelerated streambank erosion. The magnitude of streambank erosion and soil loss were compared along Bear Creek in central Iowa. The subreaches are bordered by differing land uses, including reestablished riparian forest buffers, row crop fields, and continuously grazed riparian pastures. Erosion pins were measured from June 1998 to July 2002 to estimate the magnitude of streambank erosion. Total streambank soil loss was estimated by using magnitude of bank erosion, soil bulk density, and severely eroded bank area. Significant seasonal and yearly differences in magnitude of bank erosion and total soil loss were partially attributed to differences in precipitation and associated discharges. Riparian forest buffers had significantly lower magnitude of streambank erosion and total soil loss than the other two riparian land uses. Establishment of riparian forest buffers along all of the nonbuffered subreaches would have reduced stream‐bank soil loss by an estimated 77 to 97 percent, significantly decreasing sediment in the stream, a major water quality problem in Iowa.  相似文献   

6.
We quantified annual sediment deposition, bank erosion, and sediment budgets in nine riverine wetlands that represented a watershed continuum for 1 year in the unregulated Yampa River drainage basin in Colorado. One site was studied for 2 years to compare responses to peak flow variability. Annual mean sediment deposition ranged from 0.01 kg/m2 along a first-order subalpine stream to 21.8 kg/m2 at a sixth-order alluvial forest. Annual mean riverbank erosion ranged from 3 kg/m-of-bank at the first-order site to 1000 kg/m at the 6th-order site. Total sediment budgets were nearly balanced at six sites, while net export from bank erosion occurred at three sites. Both total sediment deposition (R2 = 0.86, p < 0.01) and bank erosion (R2 = 0.77, p < 0.01) were strongly related to bankfull height, and channel sinuosity and valley confinement helped to explain additional variability among sites. The texture and organic fraction of eroded and deposited sediment were relatively similar in most sites and varied among sites by watershed position. Our results indicate that bank erosion generally balances sediment deposition in riverine wetlands, and we found no distinct zones of sediment retention versus export on a watershed continuum. Zones of apparent disequilibrium can occur in unregulated rivers due to factors such as incised channels, beaver activity, and cattle grazing. A primary function of many western riverine wetlands is sediment exchange, not retention, which may operate by transforming materials and compounds in temporary sediment pools on floodplains. These results are considered in the context of the Hydrogeomorphic approach being implemented by the U.S. government for wetland resource management.  相似文献   

7.
Abstract: Sediments and soils were analyzed using stable carbon and nitrogen isotope ratio mass spectrometry and carbon and nitrogen elemental analyses to evaluate the their ability to indicate land‐use and land management disturbance and pinpoint loading from sediment transport sources in forested watersheds disturbed by surface coal mining. Samples of transported sediment particulate organic matter were collected from four watersheds in the Southern Appalachian forest region of southeastern Kentucky. The four watersheds had different surface coal mining history that were classified as undisturbed, active mining, and reclaimed conditions. Soil samples were analyzed including reclaimed grassland soils, undisturbed forest soils, geogenic organic matter associated with coal fragments in mining spoil, and soil organic matter from un‐mined grassland soils. Statistically significant differences were found for all biogeochemical signatures when comparing transported sediments from undisturbed watersheds and surface coal mining disturbed watersheds, and the results were attributed to differences in erosion sources and the presence of geogenic organic matter. Sediment transport sources in the surface coal mining watersheds were analyzed using Monte Carlo mass balance un‐mixing and it was found that: δ15N showed the ability to differentiate streambank erosion and surface soil erosion; and δ13C showed the ability to differentiate soil organic matter and geogenic organic matter. Results from the analyses suggest that streambank erosion downstream of surface coal mining sites is an especially significant source of sediment in coal mining disturbed watersheds. Further, the results suggest that the sediment transport processes governing streambank erosion loads are taking longer to reach geomorphologic equilibrium in the watershed as compared with the surface erosion processes. The dual‐isotope technique provides a useful method for further investigation of the impact of surface coal mining in the uplands of the watershed upon the geomorphologic state of the channel and the source of organic matter in aquatic systems impacted by surface coal mining.  相似文献   

8.
ABSTRACT: In this study three components of the Rosgen Level III Stream Reach Condition Assessment were tested for their ability to predict short-term erosion rates. Rosgen's bank erosion potential (BEP) ratings and near bank stress (NBS) estimates and the Pfankuch channel stability ratings were evaluated. Thirty-six banks with a range of BEP ratings and NBS estimates were selected on the 101 km Upper Illinois River in northeast Oklahoma. The Upper Illinois River is a meandering, gravel-dominated, riffle/pool channel. Cumulative erosion data measured with bank pins after four 2.0 to 2.5-year return period flows from September 1996 to July 1997 were used in the analyses. When integrated as indicated in Rosgen (1996), the BEP indices and NBS estimates were poor predictors of bank erosion. Individually, the grouped BEP ratings and Pfankuch ratings performed relatively well compared to grouped NBS estimates in predicting erosion; however, the variability of erosion was large within each rating group. Linear regression between erosion and BEP numerical indices and Pfankuch scores was significant (a = 0.05), but variability was high (illustrated by low r2 values). Regression between erosion and NBS estimates was not significant.  相似文献   

9.
Managed forests generally produce high water quality, but degradation is possible via sedimentation if proper management is not implemented during forest harvesting. To mitigate harvesting effects on total watershed sediment yield, it is necessary to understand all processes that contribute to these effects. Forest harvesting best management practices (BMPs) focus almost exclusively on overland sediment sources, whereas in‐and‐near stream sources go unaddressed although they can contribute substantially to sediment yield. Thus, we propose a new framework to classify forest harvesting effects on stream sediment yield according to their direct and indirect processes. Direct effects are those caused by erosion and sediment delivery to surface water from overland sources (e.g., forest roads). Indirect effects are those caused by a shift in hydrologic processes due to tree removal that accounts for increases in subsurface and surface flows to the stream such that alterations in water quality are not predicated upon overland sediment delivery to the stream, but rather in‐stream processes. Although the direct/indirect distinction is often implicit in forest hydrology studies, we have formalized it as a conceptual model to help identify primary drivers of sediment yield after forest harvesting in different landscapes. Based on a literature review, we identify drivers of these effects in five regions of the United States, discuss current forest management BMPs, and identify research needs.  相似文献   

10.
Schilling, Keith E., Thomas M. Isenhart, Jason A. Palmer, Calvin F. Wolter, and Jean Spooner, 2011. Impacts of Land‐Cover Change on Suspended Sediment Transport in Two Agricultural Watersheds. Journal of the American Water Resources Association (JAWRA) 47(4):672‐686. DOI: 10.1111/j.1752‐1688.2011.00533.x Abstract: Suspended sediment is a major water quality problem, yet few monitoring studies have been of sufficient scale and duration to assess the effectiveness of land‐use change or conservation practice implementation at a watershed scale. Daily discharge and suspended sediment export from two 5,000‐ha watersheds in central Iowa were monitored over a 10‐year period (water years 1996‐2005). In Walnut Creek watershed, a large portion of land was converted from row crop to native prairie, whereas in Squaw Creek land use remained predominantly row crop agriculture. Suspended sediment loads were similar in both watersheds, exhibiting flashy behavior typical of incised channels. Modeling suggested that expected total soil erosion in Walnut Creek should have been reduced 46% relative to Squaw Creek due to changes in land use, yet measured suspended sediment loads showed no significant differences. Stream mapping indicated that Walnut Creek had three times more eroding streambank lengths than did Squaw Creek suggesting that streambank erosion dominated sediment sources in Walnut Creek and sheet and rill sources dominated sediment sources in Squaw Creek. Our results demonstrate that an accounting of all sources of sediment erosion and delivery is needed to characterize sediment reductions in watershed projects combined with long‐term, intensive monitoring and modeling to account for possible lag times in the manifestation of the benefits of conservation practices on water quality.  相似文献   

11.
Abstract: A study was conducted between September 2003 and September 2006 to obtain baseline sediment inventories and monitor sediment transport and storage along a 3.7 km length of the channel of Valley Creek within Valley Forge National Historical Park, Pennsylvania. Valley Creek is a tributary of the Schuylkill River and drains an urbanizing 60.6 km2 watershed that currently has 18% impervious land cover. Numerous field methods were employed to measure the suspended sediment yield, longitudinal profile, cross‐sections, banklines, and particle size distribution of the streambed. Suspended sediment yield for the watershed was measured at a USGS gage located just upstream of the park boundary between July 2004 and July 2005, the period corresponding to field surveys of bank erosion and channel change. The estimated suspended sediment yield of 95.7 t/km2/year is representative of a year with unusually high discharge, including a storm event that produced a peak of 78 m3/s, the second highest discharge on record for the USGS gage. Based on the median annual streamflow for the 24 years of record at the USGS gage from 1983 to 2006, the median annual sediment yield is estimated to be closer to 34 t/km2/year, considerably lower than median and mean values for other sites within the region. The mass of silt, clay, and fine sand derived from bank erosion along the 3.7 km study reach during the field survey period accounts for an estimated 2,340 t, equivalent to about 43% of the suspended sediment load. The mass of fine sediment stored in the bed along the study reach was estimated at 1,500 t, with about 330 t of net erosion during the study period. Although bank erosion appears to be a potentially dominant source of sediment by comparison with annual suspended sediment load, bed sediment storage and potential for remobilization is of the same order of magnitude as the mass of sediment derived from bank erosion.  相似文献   

12.
ABSTRACT: The watershed model GAMES is used for the evaluation of a targeting approach to control fluvial sedimentation arising from soil erosion in agricultural areas. The data considered for the analysis consists of output from the application of the model to existing and hypothetical soil and crop management systems in two small watersheds of southern Ontario, one in the rolling uplands and the other in a very flat lowland area. The model output includes estimates of spring sediment yield from field-size cells to the stream outlet for existing agricultural management conditions, and estimates of sediment yield resulting from the successive implementation of two levels of soil erosion controls under four remedial measures strategies. The results reveal that, for the rolling upland watershed exhibiting a wide range of soil erosion and sediment yield rates, targeted control programs can be expected to provide an extremely effective approach to sediment control. For flat lowland watersheds, exhibiting relatively uniform soil erosion and sediment yield rates, the strategy of targeting controls may be somewhat more effective than a random approach to control, but not as efficient as in the case of watersheds in more rolling terrain. It is evident from the study that a screening model such as GAMES provides a very useful tool for the planning and evaluation of erosion and sediment control programs.  相似文献   

13.
ABSTRACT: A dynamic sediment discharge model was developed and proposed for the simulation of watershed systems. It war developed from an expansion of splash and flow erosion relationships under steady state conditions. It was described as a general erosion model that can be reduced to forms comparable to many conceptual soil erosion and sediment yield models. The model incorporates eight parameters such as rainfall intensities, runoff rates, and previous sediment discharges. The model was tested with two small watersheds with simulation results which were very satisfactory compared to the data.  相似文献   

14.
15.
Setegn, Shimelis G., Bijan Dargahi, Ragahavan Srinivasan, and Assefa M. Melesse, 2010. Modeling of Sediment Yield From Anjeni-Gauged Watershed, Ethiopia Using SWAT Model. Journal of the American Water Resources Association (JAWRA) 46(3):514-526. DOI: 10.1111/j.1752-1688.2010.00431.x Abstract: The Soil and Water Assessment Tool (SWAT) was tested for prediction of sediment yield in Anjeni-gauged watershed, Ethiopia. Soil erosion and land degradation is a major problem on the Ethiopian highlands. The objectives of this study were to evaluate the performance and applicability of SWAT model in predicting monthly sediment yield and assess the impacts of subbasin delineation and slope discretization on the prediction of sediment yield. Ten years monthly meteorological, flow and sediment data were used for model calibration and validation. The annual average measured sediment yield was 24.6 tonnes/ha. The annual average simulated sediment yield was 27.8 and 29.5 tones/ha for calibration and validation periods, respectively. The study found that the observed values showed good agreement with the simulated sediment yield with Nash-Sutcliffe efficiency (NSE) = 0.81, percent bias (PBIAS) = 28%, RMSE-observations standard deviation ratio (RSR) = 0.23, and coefficient of determination (R²) = 0.86 for calibration and NSE = 0.79, PBIAS = 30%, RSR = 0.29, and R² = 0.84 for validation periods. The model can be used for further analysis of different management scenarios that could help different stakeholders to plan and implement appropriate soil and water conservation strategies.  相似文献   

16.
In some watersheds, streambanks are a source of two major pollutants, phosphorus (P) and sediment. P originating from both uplands and streambanks can be transported and stored indefinitely on floodplains, streambanks, and in closed depressions near the stream. The objectives of this study were to (1) test the modified streambank erosion and instream P routines for the Soil and Water Assessment Tool (SWAT) model in the Barren Fork Creek watershed in northeast Oklahoma, (2) predict P in the watershed with and without streambank‐derived P, and (3) determine the significance of streambank erosion P relative to overland P sources. Measured streambank and channel parameters were incorporated into a flow‐calibrated SWAT model and used to estimate streambank erosion and P for the Barren Fork Creek using modified streambank erosion and instream P routines. The predicted reach‐weighted streambank erosion was 40 kg/m vs. the measured 42 kg/m. Streambank erosion contributed 47% of the total P to the Barren Fork Creek and improved P predictions compared to observed data, especially during the high‐flow events. Of the total P entering the stream system, approximately 65% was removed via the watershed outlet and 35% was stored in the floodplain and stream system. This study successfully applied the SWAT model's modified streambank erosion and instream P routines and demonstrated that streambank‐derived P can improve P modeling at the watershed scale. Editor's note: This paper is part of the featured series on SWAT Applications for Emerging Hydrologic and Water Quality Challenges. See the February 2017 issue for the introduction and background to the series.  相似文献   

17.
ABSTRACT: The two‐dimensional soil erosion model CASC2D‐SED simulates the dynamics of upland erosion during single rainstorms. The model is based on the raster‐based surface runoff calculations from CASC2D. Rainfall precipitation is distributed in time and space. Infiltration is calculated from the Green‐Ampt equations. Surface runoff is calculated from the diffusive wave approximation to the Saint‐Venant equations in two‐dimensions. Watershed data bases in raster Geographical Information System (GIS) provide information on the soil type, size fractions, soil erodibility, cropping management, and conservation practice factors for soil erosion calculations. Upland sediment transport is calculated for the size fractions (sand, silt, and clay), and the model displays the sediment flux, the amount of suspended sediment, and the net erosion and deposition using color graphics. The model has been tested on Goodwin Creek, Mississippi. The peak discharge and time to peak are within ± 20 percent and sediment transport rates within ?50 percent to 200 percent.  相似文献   

18.
This paper recounts our predictions of channel evolution of the Black Vermillion River (BVR) and sediment yields associated with the evolutionary sequence. Channel design parameters allowed for the prediction of stable channel form and coincident sediment yields. Measured erosion rates and basin‐specific bank erosion curves aided in prediction of the stream channel succession time frame. This understanding is critical in determining how and when to mitigate a myriad of instability consequences. The BVR drains approximately 1,062 km2 in the glaciated region of Northeast Kansas. Once tallgrass prairie, the basin has been modified extensively for agricultural production. As such, channelization has shortened the river by nearly 26 km from pre‐European dimensions; shortening combined with the construction of numerous flow‐through structures have produced dramatic impacts on discharge and sediment dynamics. Nine stream reaches were established within three main tributaries of the BVR in 2007. Reaches averaged 490 m in length, were surveyed, and assessed for channel stability, while resurveys were conducted annually through 2010 to monitor change. This work illustrates the association of current stream state, in‐channel sediment contributions, and prediction of future erosion rates based on stream evolution informed by multiple models. Our findings suggest greater and more rapid sedimentation of a federal reservoir than has been predicted using standard sediment prediction methods.  相似文献   

19.
Abstract: Earlier measurements of stream channel geometry on 19 reaches were repeated to provide a longitudinal study of stream channel adjustment over 13 years (1987‐2000) in the urbanizing Gwynns Falls, Maryland watershed. We observed both enlargement and reduction in channel size, depending on the extent of upstream development, the timing and location of urbanization and upstream channel adjustment, and the presence of hydrologic constrictions and grade controls. Based on a relatively simple visual assessment of the composition, size, and extent of instream sediment storage, we categorized stream reaches into three phases: aggraded (7 sites), early erosion (7 sites), and late erosion (5 sites). Aggraded sites had point and lateral bars mantled with fine‐grained sediment and experienced some reduction in cross‐sectional area, primarily through the deposition of fine‐grained material on bars in the channel margins. Early erosion sites had smaller bars and increases in channel cross‐sectional area as a consequence of the evacuation of in‐channel fine‐grained sediment. Fine‐grained sediments were either entirely absent or found only at a few high bar elevations at late erosion sites. Sediment evacuation from late erosion sites has both enlarged and simplified channels, as demonstrated by an increase in cross‐sectional area and a strong decrease in channel width variation. Channel cross‐sectional area enlargement, reduced channel width variation, and channel incision were ubiquitous at erosion sites. As a result, overbank flows were less common in the erosion sites as determined by high water marks left by a 2‐year flood that occurred during the study period. Principal causes for channel changes appear to be increased high flow durations and reduced sediment supply. Spatial variation in channel conditions could not be tied simply to sub‐basin impervious cover or watershed area. In‐channel sediment storage is a useful indicator of channel form and adjustment. When combined with information on development and sedimentation conditions in the contributing drainage, instream sediment storage can be used to effectively assess future channel adjustments.  相似文献   

20.
ABSTRACT: Erosion and sedimentation data from research watersheds in the Silver Creek Study Area in central Idaho were used to test the prediction of logging road erosion using the R1-R4 sediment yield model, and sediment delivery using the “BOISED” sediment yield prediction model. Three small watersheds were instrumented and monitored such that erosion from newly constructed roads and sediment delivery to the mouths of the watersheds could be measured for four years following road construction. The errors for annual surface erosion predictions for the two standard road tests ranged from +31.2 t/ha/yr (+15 percent) to -30.3 t/ha/yr (-63 percent) with an average of zero t/ha/yr and a standard deviation of the differences of 18.7 t/ha/yr. The annual prediction errors for the three watershed scale tests had a greater range from -40.8 t/ha/yr (-70 percent) to +65.3 t/ha/yr (+38 percent) with a mean of -1.9 t/ha/yr and a standard deviation of the differences of 25.2 t/ha/yr. Sediment yields predicted by BOISED (watershed scale tests) were consistently greater (average of 2.5 times) than measured sediment yields. Hillslope sediment delivery coefficients in BOISED appear to be overly conservative to account for average site conditions and road locations, and thus over-predict sediment delivery. Mass erosion predictions from BOISED appear to predict volume well (465 tonnes actual versus 710 tonnes predicted, or a 35 percent difference) over 15 to 20 years, however mass wasting is more episodic than the model predicts.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号