首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 171 毫秒
1.
ABSTRACT: The effects of variable discharges during the summer on the dissolved oxygen (DO) content and water temperature upstream and downstream of the Conowingo Hydroelectric Power Station were investigated. The DO dynamics are controlled primarily by meteorological factors that are independent of the mode of hydrostation operation. DO stratification occurred during the summer in Conowingo Pond, but thermal stratification was not observed. The magnitude and duration of off-peak discharges including a run-of-the-river operation did not affect DO stratification in Conowingo Pond; little vertical mixing occurred. However, strong winds and/or high river flows temporarily destroyed DO stratification. The run-of-the-river operation or off-peak continuous discharge schemes did not provide better DO conditions downstream of the hydrostation than the peaking operation with intermittent off-peak releases. A statistical model predicted that a DO of 5 ppm occurs 0.6 miles downstream of the powerhouse when the natural river flow is consistently greater than 15,000 cfs and water temperature is less than 80°F. A mean daily DO of at least 4 ppm was predicted to occur over 80 percent of the time during the 92-day summer period. Farther downstream (1.3 miles from the powerhouse) a mean daily DO of at least 4 ppm was predicted to occur 90 percent of the time in summer.  相似文献   

2.
ABSTRACT: Effects of aquatic macrophytes are not considered in most standard water quality models. This study used field measurements and water quality models to help determine the effects of aquatic macrophytes on dissolved oxygen (DO) concentrations in a shallow tailwater reservoir. Installation of a hydropower plant and macrophytes (primarily Potamogeton and Chara) in a large shallow portion of the lake are possible causes of reduced DO levels in the tailwater reservoir. A water quality model (WASP5) was used to quantify the various DO sources and sinks and to evaluate the effects of the hydropower operations on DO levels in the lake. It was found that the macrophytes in Lake Ogallala had a significant effect on the DO levels in the lake. At an average macrophyte density of about 6,360 g/m2 (wet weight) in 2000, the DO fluctuated daily from about 3 mg/l to about 12 mg/l. At an average macrophyte density of about 2,120 g/m2 (wet weight) in 2002, the DO fluctuated from about 5 mg/l to about 9 mg/l daily. The model predicted that the DO would remain near 5 mg/l without macrophytes. The photo‐synthetic and respiration rates developed in the model (4.4 mg/g‐hr and 1.4 mg/g‐hr, respectively) agree well with literature values.  相似文献   

3.
Investigations were conducted into the treatment of effluents produced during manufacturing processes at both a chemicals production facility and a paint manufacturing facility. A comparison of costs of wastewater treatment at both facilities was also performed. The untreated effluents from both facilities were high in biological oxygen demand (BOD), chemical oxygen demand (COD), and total dissolved solids (TDS). In addition, the effluents from the two facilities deviated significantly in dissolved oxygen (DO) content and pH levels. However, both facilities ultimately released treated wastewater with allowable amounts or levels of BOD, COD, TDS, DO, and pH as permitted by the Department of the Environment, Ministry of Environment and Forests, Bangladesh (DOE). The effluent treatment plants (ETP) at both facilities contained combinations of chemical and biological treatment processes. The treatment processes used at the chemicals production facility and at the paint manufacturing facility were continuous and semi‐batch processes, respectively. The biological treatment section of the ETP at the chemicals production facility has both anaerobic and aerobic units, while the paint manufacturing facility has only an aerobic unit. Annual installation and operation costs of the ETP at the chemicals production facility was Bangladeshi Taka (Tk) 1,300,000 ($16,667 US dollars) and Tk 800,000 ($10,257), respectively. The annual installation and operation costs of the ETP at the paint manufacturing facility were Tk 3,050,000 ($39,103) and Tk 6,200,000 ($79,488), respectively.  相似文献   

4.
随着一系列梯级水电站的建成运行,因上游电站泄水引起下游河道型水库水体中总溶解气体(TDG)过饱和,导致库区鱼类患气泡病甚至死亡的风险增加。针对河道型水库过饱和TDG释放预测问题,建立河道型水库的纵向一维过饱和TDG释放预测模型,研究不同洪水条件下河道型水库在变水位运行条件下的水动力学和过饱和TDG释放特性,分析了过饱和TDG沿程释放和代表性断面的TDG过程,探讨了横断面滩地区域的水深变化和鱼类补偿水深的满足性。结果表明降低来流的TDG水平是减小其不利影响的重要手段,在来流TDG饱和度一定时,河道型水库适当以高水位运行能够为滩地区域鱼类提供足够的躲避水深。本文结果对梯级电站优化调度以减缓TDG影响的研究和方案实施提供了技术支撑,在梯级水电开发河流的水生态保护方面具有重要意义。  相似文献   

5.
Kim, Ungtae and Jagath J. Kaluarachchi, 2009. Climate Change Impacts on Water Resources in the Upper Blue Nile River Basin, Ethiopia. Journal of the American Water Resources Association (JAWRA) 45(6):1361‐1378. Abstract: Climate change affects water resources availability of international river basins that are vulnerable to runoff variability of upstream countries especially with increasing water demands. The upper Blue Nile River Basin is a good example because its downstream countries, Sudan and Egypt, depend solely on Nile waters for their economic development. In this study, the impacts of climate change on both hydrology and water resources operations were analyzed using the outcomes of six different general circulation models (GCMs) for the 2050s. The outcomes of these six GCMs were weighted to provide average future changes. Hydrologic sensitivity, flow statistics, a drought index, and water resources assessment indices (reliability, resiliency, and vulnerability) were used as quantitative indicators. The changes in outflows from the two proposed dams (Karadobi and Border) to downstream countries were also assessed. Given the uncertainty of different GCMs, the simulation results of the weighted scenario suggested mild increases in hydrologic variables (precipitation, temperature, potential evapotranspiration, and runoff) across the study area. The weighted scenario also showed that low‐flow statistics and the reliability of streamflows are increased and severe drought events are decreased mainly due to increased precipitation. Joint dam operation performed better than single dam operation in terms of both hydropower generation and mean annual storage without affecting the runoff volume to downstream countries, but enhancing flow characteristics and the robustness of streamflows. This study provides useful information to decision makers for the planning and management of future water resources of the study area and downstream countries.  相似文献   

6.
While collaborative governance has many benefits for environmental planning and management, those benefits are not politically feasible if they impact on process efficiency. This study assesses collaboration's effect on the duration of water permitting processes, specifically the United States’ Federal Energy Regulatory Commission's hydropower relicensing process. Collaboration was measured using a survey of participants in 24 recent hydropower relicensing processes. A Cox proportional hazards model with mixed effects assessed the relationship between collaboration, regulatory framework, hydropower facility characteristics, and relicensing process duration. Collaboration was not associated with time to license. Instead, process duration depended on the regulatory framework (especially the switch to the Integrated Licensing Process and presence of endangered species) and facility characteristics (generating capacity and facility type). The results suggest that agencies should consider engaging collaboratively during planning and permitting, given that collaboration's benefits to decision quality do not incur a cost on overall process time.  相似文献   

7.
In developing countries, large dam projects continue to be launched, primarily to secure a time-stable freshwater supply and to generate hydropower. Meanwhile, calls for environmentally sustainable development put pressure on the dam-building industry to integrate ecological concerns in project planning and decision-making. Such integration requires environmental impact statements (EISs) that can communicate the societal implications of the ecological effects in terms that are understandable and useful to planners and decision-makers. The purpose of this study is to develop a basic framework for assessing the societal implications of the river ecological effects expected of a proposed large dam project. The aim is to facilitate a comparison of desired and potential undesired effects on-site and downstream. The study involves two main tasks: to identify key river goods and services that a river system may provide, and to analyze how the implementation of a large dam project may alter the on-site capacity and downstream potentials to derive river goods and services from the river system. Three river goods and six river services are identified. River goods are defined as extractable partly man-made products and river services as naturally sustained processes. By four main types of flow manipulations, a large dam project improves the on-site capacity to derive desired river goods, but simultaneously threatens the provision of desirable river goods and services downstream. However, by adjusting the site, design, and operational schedule of the proposed dam project, undesirable effects on river goods and services can be minimized.  相似文献   

8.
水电站的建设会造成坝址下游河段减水,对水环境和水生生物造成不利影响,因此电站生态流量的确定和泄放措施的可行性对于维护河流生态环境至关重要。以硕曲河去学水电站为例,基于可行性研究阶段提出的生态流量泄放措施方案,采用数学模型和理论分析方法,从生态流量取水水温、泄洪洞事故条件下生态流量保证率以及水资源的合理高效利用等方面进一步对生态流量泄放方案进行了优化比选。提出的优化方案提高了生态流量取水口的布置高程,在泄洪洞之外单独布置生态泄放系统,并增设生态流量发电机组等。对比分析表明,该优化方案在改善生态流量的下泄水温、提高生态流量泄放保证率、合理高效利用水能资源等方面具有较大优势。本研究为水电工程中生态流量泄放措施保障等方面提供了科学依据和技术参考。  相似文献   

9.
A deterministic, one-dimensional, unsteady numerical model has been developed, tested, and applied to simulate mean daily dissolved oxygen (DO) characteristics in 27 lake classes in the state of Minnesota. Reaeration and photosynthesis are the oxygen sources, while respiration, sedimentary, and biochemical water column oxygen demand are the sinks of oxygen in the model. The lake classes are differentiated by surface area (A s), maximum depth (H max), and trophic status expressed as Secchi depth (Z s). Because lake stratification is most important to lake oxygen dynamics, simulated DO characteristics are plotted in terms of a stratification parameterA s/H max 0.25 and Secchi depthZ s. Simulations provide DO profiles on a daily time scale. Specific DO characteristics of ecological and environmental interest are epilimnetic DO, hypolimnetic DO, DO gradient from surface to bottom, and DO minima and maxima. Specific results are as follows: Simulated mean daily and weekly DO values in the epilimnion of all lakes for both past and future climate scenarios are near saturation over the summer season. Hypolimnetic DO values depend strongly on lake morphometry, trophic status, and time throughout the summer season. Future climate conditions are specified as the historical records from 1955 to 1979, adjusted (monthly) by the 2 × CO2 GISS model output to account for doubling of atmospheric CO2. With this climate change, weekly averaged epilimnetic DO is projected to drop by less than 2 mg/liter, and will remain above 7 mg/liter throughout the open water season. The hypolimnetic DO reductions after climate change are on the order of 2–8 mg/liter. Periods of anoxia are longer by as much as 80 days. Those changes would alter water quality dynamics in lakes and have a profound effect on lake ecosystems including indigenous fishes. The results presented are useful for evaluating environmental management options.  相似文献   

10.
Future climate change is a source of growing concerns for the supply of energy and resources, and it may have significant impacts on industry and the economy. Major effects are likely to arise from changes to the freshwater resources system, due to the connection of energy generation to these water systems. Using future climate data downscaled by a stochastic weather generator, this study investigates the potential impacts of climate change on long‐term reservoir operations at the Chungju multipurpose dam in South Korea, specifically considering the reliability of the supply of water and hydropower. A reservoir model, Hydrologic Engineering Center‐Reservoir System Simulation (HEC‐ResSim), was used to simulate the ability of the dam to supply water and hydropower under different conditions. The hydrologic model Soil and Water Assessment Tool was used to determine the HEC‐ResSim boundary conditions, including daily dam inflow from the 6,642 km2 watershed into the 2.75 Gm3 capacity reservoir. Projections of the future climate indicate that temperature and precipitation during 2070‐2099 (2080s) show an increase of +4.1°C and 19.4%, respectively, based on the baseline (1990‐2009). The results from the models suggest that, in the 2080s, the average annual water supply and hydropower production would change by +19.8 to +56.5% and by +33.9 to 92.3%, respectively. Model simulations suggest that under the new climatic conditions, the reliability of water and hydropower supply would be generally improved, as a consequence of increased dam inflow.  相似文献   

11.
ABSTRACT: Two case studies highlighting the institutional arrangements and decision-making processes used to attempt to allocate water on large scale river systems in two countries are presented. In both cases the implementation of river plans has been blocked by conflicts between those who wish to use water for irrigation, hydropower, or municipal purposes and those who wish to maintain instream flows for fish and wildlife. To date conflict has blocked the implementation of a large hydropower scheme on the Danube River, downstream from Vienna, Austria, and the construction of municipal and agricultural projects, as well as the relicensing of an existing hydropower facility on the Platte River in Nebraska. Analysis of the decision-making processes and institutional settings of both cases led to the identification of problem areas and development of recommendations that would support the achievement of compromise solutions for management.  相似文献   

12.
ABSTRACT: This paper describes a modelling method which simplifies the evaluation of water quality policies for nonserial (branching) river systems. The method introduces dummy facilities at the junctions of the major tributary branches with the mainstream as replacements for the facilities and activities on the tributaries. The cost functions for the dummy facilities and the DO and BOD concentrations at the junctions as determined for each tributary are introduced into the mainstream serial system model which is then solved for the optimal values of the mainstream treatment plant efficiencies, the dummy facility effeciencies, and the tributary system DO and BOD concentrations using nonlinear programming. Given the optimum values for the dummy facility efficiencies and the values for the tributary system DO and BOD concentrations, the optimum values for the tributary treatment plant efficiencies are found using nonlinear programming. The method is applied to a river system with a mainstream and one major tributary which contain industrial and municipal organic and thermal polluters and their associated wastewater treatment plants.  相似文献   

13.
研究了二段式接触氧化工艺处理城市生活垃圾填埋渗滤液的强化预处理单元溶解氧变化对单元运行效果的影响。监测了0.2mg/L,0.4mg/L,0.6mg/L,0.8mg/L,1.0mg/L五个DO水平下,COD、NH3-N在0~30h内降解状况,降解曲线在较低的DO条件下,高效段较短,而DO越高,高效段越长。同时,对不同DO水平下C/N随时间的变化也进行了检测,为达到不同的C/N水平提供了工况选择上的参考。分析了降解曲线的特征及其工程应用的价值,提出了常规条件下该单元较优的溶解氧工况水平。  相似文献   

14.
ABSTRACT: A flood control reservoir protects valuable developments on the downstream flood plain by storing flood waters and releasing them at a rate that will reduce the downstream damage. The water surface level of the flood pool behind the dam can fluctuate considerably during the occurrence of a large magnitude flood causing the inundation of trees, low vegetation, and water based recreation facilities located in those areas of the flood pool area that are normally well above the water level. The amount of damage that will occur in the upper levels of the flood storage area will depend on the depth and duration of the inundation that occurs. This, in turn, is directly related to the operating policy for the reservoir. A dynamic programming optimization model of flood control reservoir operation is presented. This model determines the reservoir operating schedule that minimizes downstream flood damages. Various constraints are added to the model to account for the environmental impacts of long periods of flood storage.  相似文献   

15.
ABSTRACT: In this study a set of equations was developed which can be used to separate the time varying effects from observed dissolved oxygen (DO) data. A steady state DO profile thus derived allows a reasonable stream stimulation such that both the model and the data used in its formulation do not contain DO due to biological activities. Biological DO production and consumption are complex phenomena. By excluding these highly variable processes, this method simplifies stream DO modeling considerably. The net oxygen input due to these processes exist only part of the day, but, in the stream waste assimilative capacity analysiis and waste load allocation, one would focus his attention on critical condition. Hence, unless the change of stream ecology is the main concern, it is desirable to formulate a stream water quality model without this time varying term.  相似文献   

16.
Abstract: Selection of a biochemical oxygen demand (BOD) reaction model to incorporate into dissolved oxygen (DO) water quality models is an overlooked choice available to river water quality modelers. Data from rivers can serve in screening methods to discriminate between competing water quality models. In this study, 15 published BOD and DO datasets based on a 7 year long study of the Bormida River in Italy are used to calibrate three‐multiorder BOD models: first‐order, three‐halves order, and second‐order, which are then included in three corresponding DO models which incorporate these BOD models. The adequacy of the first‐order, three‐halves order and second‐order BOD models was evaluated by calculating the root mean square error between a model and data. A similar procedure was followed to evaluate three DO models, each of which incorporated one of the three BOD models. The first‐order BOD model most frequently fit the river data best, followed by the three‐halves order and the second‐order BOD models. The DO model incorporating a first‐order BOD model most frequently fit the data best, followed by the DO order incorporating second‐order BOD and the DO model incorporating three‐halves order BOD.  相似文献   

17.
Incorporation of environmental flow releases from reservoirs has proven to be challenging due to fear of losses to existing water uses. Moreover environmental flow requirements (EFR) have not often been operationalized. This study compares the possibility of implementing dynamic EFR based on natural flows lagged against an upstream unregulated gauging point with static EFR. It simulates different scenarios with a high flow release in the wet season and analyses its impacts on hydropower production. This method accounts fully for the natural variability of environmental flows, implying less pressure on existing water uses during relatively dry years. Joint operation of two cascading dams vs. individual operation for EFR was also explored. These approaches were tested for the Zambezi River basin in Southern Africa using a water resources model, WAFLEX. Historic data on reservoir water levels, releases and power generation of the hydropower schemes were synthesized. Combining these yielded a validated series of monthly flow data for a 28 year period (1982‐2010). The results show that Kariba and Cahora Bassa reservoirs face a reduction in power produced when they would annually release an environmental flow. However, the dynamic EFR method entails smaller hydropower losses. Joint environmental flow operations will reduce overall basin power production more than if Cahora Bassa alone would release an environmental flow. However, such joint operation would be more beneficial to the ecosystem.  相似文献   

18.
One uncertainty associated with large dam removal is the level of downstream sediment deposition and associated short‐term biological effects, particularly on salmonid spawning habitat. Recent studies report downstream sediment deposition following dam removal is influenced by proximity to the source and river transport capacity. The impacts of dam removal sediment releases are difficult to generalize due to the relatively small number of dam removals completed, the variation in release strategies, and the physical nature of systems. Changes to sediment deposition and associated streambed composition in the Elwha River, Washington State, were monitored prior to (2010‐2011) and during (2012‐2014) the simultaneous removal of two large dams (32 and 64 m). Changes in the surface layer substrate composition during dam removal varied by year and channel type. Riffles in floodplain channels downstream of the dams fined and remained sand dominated throughout the study period, and exceeded levels known to be detrimental to incubating salmonids. Mainstem riffles tended to fine to gravel, but appear to be trending toward cobble after the majority of the sediment was released and transported through system. Thus, salmonid spawning habitats in the mainstem appear to have been minimally impacted while those in floodplain channels appear to have been severely impacted during dam removal.  相似文献   

19.
ABSTRACT: The spatial and temporal variability of dissolved oxygen (DO), biochemical oxygen demand (BOD), nitrate concentration and total coliform (TC) were investigated at nine sampling stations distributed along the main rivers of the Piracicaba River Basin, a 12,400 km2 catchment located in São Paulo State, one of the most developed regions of Brazil. Spatially, a downstream impoverishment of water quality conditions was observed, as seen by the decrease of DO, and increase of BOD, nitrate, and TC. These changes were probably caused by accumulating downstream discharge of domestic and industrial sewage. Temporal evaluation of 18 years of data showed that DO decreased with time for the majority of the sampling stations, while BOD, nitrate, and TC increased. A law, approved at the end of 1991, proposed a new water tax for river water extraction for industrial and agricultural use. The amount of this tax is determined according to the water quality of the extracted water. Therefore, the evaluation of the water quality status in this basin is a first step to help resources managers to determine the values for this tax.  相似文献   

20.
Abstract: Many arctic lakes freeze completely in winter. The few that retain unfrozen water for the entire winter period serve as overwintering fish habitat. In addition to serving as fish habitat, water in arctic lakes is needed for industrial and domestic use. Permits for water extraction seek to maximize water use without impacting dissolved oxygen (DO) levels and endangering fish habitat. The relationship between lake volume, winter DO budget, and extraction of water through pumping has historically not been well understood. A management model that could estimate end‐of‐winter DO would improve our understanding of the potential impacts of different management strategies. Using under‐ice DO measurements (November to April) taken from two natural lakes and one flooded gravel mine on the North Slope of Alaska, a physically based model was developed to predict end‐of‐winter DO concentration, water‐column DO profiles, and winter oxygen depletion rate in arctic lakes during periods of ice cover. Comparisons between the measured and model‐predicted oxygen profiles in the three study lakes suggest that the depth‐based DO modeling tool presented herein can be used to adequately predict the amount of DO available in arctic lakes throughout winter.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号