首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 265 毫秒
1.
Undamming Rivers: A Review of the Ecological Impacts of Dam Removal   总被引:26,自引:4,他引:22  
Dam removal continues to garner attention as a potential river restoration tool. The increasing possibility of dam removal through the FERC relicensing process, as well as through federal and state agency actions, makes a critical examination of the ecological benefits and costs essential. This paper reviews the possible ecological impacts of dam removal using various case studies. Restoration of an unregulated flow regime has resulted in increased biotic diversity through the enhancement of preferred spawning grounds or other habitat. By returning riverine conditions and sediment transport to formerly impounded areas, riffle/pool sequences, gravel, and cobble have reappeared, along with increases in biotic diversity. Fish passage has been another benefit of dam removal. However, the disappearance of the reservoir may also affect certain publicly desirable fisheries. Short-term ecological impacts of dam removal include an increased sediment load that may cause suffocation and abrasion to various biota and habitats. However, several recorded dam removals have suggested that the increased sediment load caused by removal should be a short-term effect. Preremoval studies for contaminated sediment may be effective at controlling toxic release problems. Although monitoring and dam removal studies are limited, a continued examination of the possible ecological impacts is important for quantifying the resistance and resilience of aquatic ecosystems. Dam removal, although controversial, is an important alternative for river restoration.  相似文献   

2.
ABSTRACT: The proposed removal of Ballville Dam was assessed by (1) using a new Geographic Information Systems (GIS) based method for calculating reservoir sediment storage, (2) evaluating sediment properties and contamination from core data, and (3) assessing downstream impacts from sediment routing calculations. A 1903 (pre‐dam) map was manipulated using GIS to recreate the reservoir bathymetry at time of dam construction and used in combination with a detailed 1993 bathymetric survey to calculate sediment volumes and thickness. Reservoir sediment properties and geochemistry were determined from 14 sediment vibracores. Annual sedimentation rates varied from 1.7 to 4.3 g/cm2/yr based on Cesium‐137 (137Cs) and Lead‐210 (210Pb) geochronology and dated flood layers. The pore fluid geochemistry (Ba, Co, Cu, Mn) of four cores showed surficial enrichments in Cu, while Co and Mn show secondary peaks within the sediments. GIS calculations showed that a designed channel through the former reservoir able to accommodate the 10 percent Probable Maximum Flood (PMF) would require removing approximately 0.35 million m3 of sediment (27 percent of the reservoir fill), either by dredging at a cost of up to $6.3 million or by releasing fine grained sediment downstream. A sediment routing model was applied for the critical 6 km downstream using four cross sections. The sediment routing model predicts that, for flows exceeding minimum Mean Daily Flow (1924 to 1998 data), greater than 90 percent of this sediment would be transported through downstream reaches into Lake Erie (Sandusky Bay).  相似文献   

3.
Kibler, Kelly, Desiree Tullos, and Mathias Kondolf, 2011. Evolving Expectations of Dam Removal Outcomes: Downstream Geomorphic Effects Following Removal of a Small, Gravel‐Filled Dam. Journal of the American Water Resources Association (JAWRA) 1‐16. DOI: 10.1111/j.1752‐1688.2011.00523.x Abstract: Dam removal is a promising river restoration technique, particularly for the vast number of rivers impounded by small dams that no longer fulfill their intended function. As the decommissioning of small dams becomes increasingly commonplace in the future, it is essential that decisions regarding how and when to remove these structures are informed by appropriate conceptual ideas outlining potential outcomes. To refine predictions, it is necessary to utilize information from ongoing dam removal monitoring to evolve predictive tools, including conceptual models. Following removal of the Brownsville Dam from the Calapooia River, Oregon, aquatic habitats directly below the dam became more heterogeneous over the short term, whereas changes further downstream were virtually undetectable. One year after dam removal, substrates of bars and riffles within 400 m downstream of the dam coarsened and a dominance of gravel and cobble sediments replaced previously hardpan substrate. New bars formed and existing bars grew such that bar area and volume increased substantially, and a pool‐riffle structure formed where plane‐bed glide formations had previously dominated. As the Brownsville Dam stored coarse rather than fine sediments, outcomes following removal differ from results of many prior dam removal studies. Therefore, we propose a refined conceptual model describing downstream geomorphic processes following small dam removal when upstream fill is dominated by coarse sediments.  相似文献   

4.
This is a study of the scientific component of an effort to restore an urban river by removing a low-head dam. The Secor Dam is owned by a local government entity near Toledo, Ohio. The proposed removal of the last structure impeding flow on the Ottawa River has broad appeal, but the owner is concerned about liability issues, particularly potential changes to the flood regime, the presence of contaminated sediments behind the dam, and possible downstream transport of reservoir sediments. Assessing sediment contamination involved sediment sampling and analysis of trace metals and organic contaminants. Forecasting sediment transport involved field methods to determine the volume and textural properties of reservoir and upstream sediment and calculations to determine the fate of reservoir sediments. Forecasting changes in the flood regime involved HEC-RAS hydrological models to determine before and after dam removal flood scenarios using LiDAR data imported into an ArcGIS database. The resulting assessment found potential sediment contamination to be minor, and modeling showed that the removal of the dam would have minimal impacts on sediment transport and flood hazards. Based on the assessment, the removal of the dam has been approved by its owners.  相似文献   

5.
ABSTRACT: There is a pressing need for tools to predict the rates, magnitudes, and mechanisms by which sediment is removed from a reservoir following dam removal, as well as for tools to predict where this sediment will be deposited downstream and how it will impact downstream channel morphology. In the absence of adequate empirical data, a good initial approach is to examine the impacts of dam removal within the context of the geomorphic analogies of channel evolution models and sediment waves. Channel changes at two dam breaching sites in Wisconsin involved a succession of channel forms and processes consistent with an existing channel evolution model. Sediment transported downstream after removal of other dams suggests that reservoir sediment may be translated downstream either as a distinct wave or gradually eroded away. More extensive data collection on existing dam removals is warranted before undertaking the removal of a large number of dams. However, if removal is to proceed based on current knowledge, then geomorphic analogies can be used as the foundation for sediment management and stabilization schemes.  相似文献   

6.
ABSTRACT: Dam removal has been proposed as an effective method of river restoration, but few integrative studies have examined ecological responses to the removal of dams. In 1999, we initiated an interdisciplinary study to determine ecological responses to the removal of a 2 m high dam on lower Manatawny Creek in southeastern Pennsylvania. We used an integrative monitoring program to assess the physical, chemical, and biological responses to dam removal. Following removal in 2000, increased sediment transport has led to major changes in channel form in the former impoundment and downstream reaches. Water quality did not change markedly following removal, probably because of the impoundment's short hydraulic residence time (less than two hours at base flow) and infrequent temperature stratification. When the impoundment was converted to a free flowing reach, the composition of the benthic macroinvertebrate and fish assemblages in this portion of Manatawny Creek shifted dramatically from lentic to lotic taxa. Some fish species inhabiting the free flowing reach downstream from the dam were negatively affected by large scale sediment transport and habitat alteration following dam removal, but this appears to be a short term response. Based on our observations and experiences in this study, we provide a list of issues to evaluate when considering future dam removals.  相似文献   

7.
ABSTRACT: In Yegua Creek, a principal tributary of the Brazos River in Texas, surveys of a 19 km channel reach downstream of Somerville Dam show that channel capacity decreased by an average of 65 percent in a 34 year period following dam closure. The decrease corresponds with an approximately 85 percent reduction in annual flood peaks. Channel depth has changed the most, decreasing by an average of 61 percent. Channel width remained stable with an average decrease of only 9 percent, reflecting cohesive bank materials along with the growth of riparian vegetation resulting from increased low flows during dry summer months. Although large changes in stream channel geometry are not uncommon downstream of dams, such pronounced reductions in channel capacity could have long‐term implications for sediment delivery through the system.  相似文献   

8.
One uncertainty associated with large dam removal is the level of downstream sediment deposition and associated short‐term biological effects, particularly on salmonid spawning habitat. Recent studies report downstream sediment deposition following dam removal is influenced by proximity to the source and river transport capacity. The impacts of dam removal sediment releases are difficult to generalize due to the relatively small number of dam removals completed, the variation in release strategies, and the physical nature of systems. Changes to sediment deposition and associated streambed composition in the Elwha River, Washington State, were monitored prior to (2010‐2011) and during (2012‐2014) the simultaneous removal of two large dams (32 and 64 m). Changes in the surface layer substrate composition during dam removal varied by year and channel type. Riffles in floodplain channels downstream of the dams fined and remained sand dominated throughout the study period, and exceeded levels known to be detrimental to incubating salmonids. Mainstem riffles tended to fine to gravel, but appear to be trending toward cobble after the majority of the sediment was released and transported through system. Thus, salmonid spawning habitats in the mainstem appear to have been minimally impacted while those in floodplain channels appear to have been severely impacted during dam removal.  相似文献   

9.
Hummel, Ryan, Jennifer G. Duan, and Shiyan Zhang, 2012. Comparison of Unsteady and Quasi‐Unsteady Flow Models in Simulating Sediment Transport in an Ephemeral Arizona Stream. Journal of the American Water Resources Association (JAWRA) 48(5): 987‐998. DOI: 10.1111/j.1752‐1688.2012.00663.x Abstract: Hydrodynamic and sediment transport models are useful engineering tools for predicting unsteady flood flow and sediment transport. Many models such as HEC‐RAS, HEC‐6, and IALLUVIAL apply quasi‐unsteady flow model, whereas others apply the unsteady flow model. It remains unknown if a quasi‐unsteady flow model is sufficiently accurate for simulating sediment transport in rapidly varied unsteady flood events, especially in ephemeral rivers in arid and semiarid regions. This study compared the quasi‐unsteady HEC‐RAS 4.1 model with one‐dimensional (1D) Finite Volume Method (FVM) based model in simulating flood flow and sediment transport in the Pantano Wash, a dryland river in the state of Arizona. The objective is to determine which sediment transport method is appropriate in predicting bed elevation changes in an ephemeral stream, Pantano Wash, and if an unsteady model is more accurate than a quasi‐unsteady flow model in predicting sediment transport. Results showed that the quasi‐unsteady HEC‐RAS model and the 1D FVM yielded similar results of bed degradation and aggradation for this dryland stream, although the FVM model predicted better flood hydrographs. Among the seven sediment transport formulas embedded in HEC‐RAS, Yang’s and Engelund‐Hansen’s equations gave the best matches with the field measurements for this particular case study.  相似文献   

10.
Abstract: This study used an innovative GIS/remote sensing approach to study historical river channel changes in the Huron River, a wandering gravel‐bedded river in northern Ohio. Eight sets of historical aerial photographs (1958‐2003) span the construction of a low‐head dam (1969), removal of the spillway (1994), and removal of the dam itself (2002). Construction of the dam modified stream gradients >4 km upstream of the small impounded reservoir. This study tracked changes in the polygon size, shape, and centroid position of 12 sand‐gravel bars through a study reach 0.2‐4.1 km upstream of the dam. These bars were highly responsive, tending to migrate obliquely downstream and toward the outer bank at rates up to 9 m/year. Historical changes in the size and position of the bars can be interpreted as the downstream translation of one or more sediment waves. Prior to dam construction, a sediment wave moved downstream through the study reach. Following construction of the dam, this sediment wave became stationary and degraded in situ by dispersion. The growth of bars throughout the study reach during this time interval resulted in a progressive increase in channel sinuosity. Removal of the spillway rejuvenated downstream translation of a sediment wave through the study reach and was followed by a reduction in channel sinuosity. These results illustrate that important geomorphologic changes can occur upstream of low‐head dams. This may be a neglected area of research about the effects of dams and dam removals.  相似文献   

11.
Water quality and stream habitat in agricultural watersheds are under greater scrutiny as hydrologic pathways are altered to increase crop production. Agricultural drainage ditches function to remove water quickly from farmed landscapes. Conventional ditch designs lack the form and function of natural stream systems and tend to be unstable and provide inadequate habitat. In October of 2009, 1.89 km of a conventional drainage ditch in Mower County, Minnesota, was converted to an alternative system with a two‐stage channel to investigate the improvements in water quality, stability, and habitat. Longitudinal surveys show a 12‐fold increase in the pool‐riffle formation. Cross‐sectional surveys show an average increase in bankfull width of approximately 10% and may be associated to an increased frequency in large storm events. The average increase in bankfull depth was estimated as 18% but is largely influenced by pool formation. Rosgen Stability Analyses show the channel to be highly stable and the banks at a low risk of erosion. The average bankfull recurrence interval was estimated to be approximately 0.30 years. Overall, the two‐stage ditch design demonstrates an increase in fluvial stability, creating a more consistent sediment budget, and increasing the frequency of important instream habitat features, making this best management practice a viable option for addressing issues of erosion, sediment imbalance, and poor habitat in agricultural drainage systems.  相似文献   

12.
We examined the effects of the Zemko Dam removal on the Eightmile River system in Salem, Connecticut, USA. The objective of this research was to quantify spatiotemporal variation in fish community composition in response to small dam removal. We sampled fish abundance over a 6-year period (2005–2010) to quantify changes in fish assemblages prior to dam removal, during drawdown, and for three years following dam removal. Fish population dynamics were examined above the dam, below the dam, and at two reference sites by indicator species analysis, mixed models, non-metric multidimensional scaling, and analysis of similarity. We observed significant shifts in fish relative abundance over time in response to dam removal. Changes in fish species composition were variable, and they occurred within 1 year of drawdown. A complete shift from lentic to lotic fishes failed to occur within 3 years after the dam was removed. However, we did observe increases in fluvial and transition (i.e., pool head, pool tail, or run) specialist fishes both upstream and downstream from the former dam site. Our results demonstrate the importance of dam removal for restoring river connectivity for fish movement. While the long-term effects of dam removal remain uncertain, we conclude that dam removals can have positive benefits on fish assemblages by enhancing river connectivity and fluvial habitat availability.  相似文献   

13.
ABSTRACT: A controlled burn at Bandelier National Monument got out of control and burned about 43,000 acres (17,400 hectares) near Los Alamos, New Mexico, in May 2000. The wildfire caused dramatic changes in infiltration capacity and wettability of soils in many of the watersheds above Los Alamos National Laboratory (LANL) and destroyed the duff layer, dramatically reducing the interception and infiltration capacity of the formerly forested watersheds. These sudden changes in basin hydrology necessitated a rapid assessment of hydrology and hydraulics for the canyons running through LANL property to evaluate flood risk, plan emergency flood protection measures, and assess potential sediment and actinide transport. This paper presents the results of hydrologic and hydraulic modeling of Los Alamos Canyon following the wildfire. The large scale modeling effort, with over 13,000 cross sections for the hydraulic model (5,000 for Los Alamos Canyon, 8,000 for Guaje Canyon), relied heavily on a geographic information system (GIS) for model input and floodplain delineation. The HEC‐geoRAS model provided good integration between the hydraulic model (HEC‐RAS, Version 3.0.1) and the GIS (ArcView, v. 3.3). These modeling results are being used in drainage master planning efforts at LANL and in the development of sediment transport models using HEC‐6T. Sediment transport modeling results will be used to develop actinide transport models for the canyons at LANL.  相似文献   

14.
ABSTRACT: Bathymetric and sedimentation surveys were conducted using a dual frequency (28/200 kHz) echo sounder system in two reservoirs (Lee Creek Reservoir and Lake Shepherd Springs) in the Ozark Plateau of northwestern Arkansas. Echo sounder survey data were merged within geographic information system (GIS) software to provide detailed visualization and analyses of current depths, pre‐impoundment topography, distribution, thickness, and volume estimates of lacustrine sediment, time averaged sediment accumulation rates, long term average annual sediment flux, and water storage capacity. Calculated long term average sediment accumulation rates were used to model sediment infilling and projected lifetimes of each reservoir. Results from echo sounder surveys and GIS analyses suggest that the Lee Creek Reservoir has a projected lifetime of approximately 500 years compared to a projected lifetime for Lake Shepherd Springs of approximately 3,000 years. Estimated differences in projected lifetimes of these reservoirs reflected differences in initial reservoir volume and long term average annual sediment flux from the respective watersheds related to watershed area, physiography, land cover, and land use. The universal soil loss equation (USLE) model generated sediment fluxes an order of magnitude larger from the watersheds of both reservoirs compared to the geophysical data estimates. This study demonstrated the utility of merging geophysical survey (echo sounder) data within a GIS as an aid to understanding patterns of reservoir sedimentation. These data and analyses also provide a baseline relevant to understanding sedimentation processes and are necessary for development of long term management plans for these reservoirs and their watersheds.  相似文献   

15.
Future climate change is a source of growing concerns for the supply of energy and resources, and it may have significant impacts on industry and the economy. Major effects are likely to arise from changes to the freshwater resources system, due to the connection of energy generation to these water systems. Using future climate data downscaled by a stochastic weather generator, this study investigates the potential impacts of climate change on long‐term reservoir operations at the Chungju multipurpose dam in South Korea, specifically considering the reliability of the supply of water and hydropower. A reservoir model, Hydrologic Engineering Center‐Reservoir System Simulation (HEC‐ResSim), was used to simulate the ability of the dam to supply water and hydropower under different conditions. The hydrologic model Soil and Water Assessment Tool was used to determine the HEC‐ResSim boundary conditions, including daily dam inflow from the 6,642 km2 watershed into the 2.75 Gm3 capacity reservoir. Projections of the future climate indicate that temperature and precipitation during 2070‐2099 (2080s) show an increase of +4.1°C and 19.4%, respectively, based on the baseline (1990‐2009). The results from the models suggest that, in the 2080s, the average annual water supply and hydropower production would change by +19.8 to +56.5% and by +33.9 to 92.3%, respectively. Model simulations suggest that under the new climatic conditions, the reliability of water and hydropower supply would be generally improved, as a consequence of increased dam inflow.  相似文献   

16.
Control of sedimentation in large reservoirs requires soil conservation at the catchment scale. In large, heterogeneous catchments, soil conservation planning needs to be based on sound information, and set within the framework of a sediment budget to ensure that all of the potentially significant sources and sinks are considered. The major sources of sediment reaching the reservoir, Lake Argyle, in tropical northwestern Australia, have been determined by combining measured sediment fluxes in rivers with spatial tracer-based estimates of proportional contributions from tributaries of the main stream entering the lake, the Ord River. The spatial tracers used are mineral particle magnetics, the strontium isotopic ratio, and the neodymium isotopic ratio. Fallout of 137Cs has been used to estimate the proportion of the sediment in Lake Argyle eroded from surface soils by sheet and rill erosion, and, by difference, the proportion eroded from subsurface soils by gully and channel erosion. About 96% of the sediment in the reservoir has come from less than 10% of the catchment, in the area of highly erodible soils formed on Cambrian-age sedimentary rocks. About 80% of the sediment in the reservoir has come from gully and channel erosion. A major catchment revegetation program, designed to slow sedimentation in the reservoir, appears to have had little effect because it did not target gullies, the major source of sediment. Had knowledge of the sediment budget been available before the revegetation program was designed, an entirely different approach would have been taken.  相似文献   

17.
The operation of Trinity and Lewiston Dams on the Trinity River in northern California in the United States, combined with severe watershed erosion, has jeopardized the existence of prime salmonid fisheries. Extreme streamflow depletion and stream sedimentation below Lewiston have resulted in heavy accumulation of coarse sediment on riffle gravel and filling of streambed pools, causing the destruction of spawning, nursery, and overwintering habitat for prized chinook salmon (Salmo gairdnerii) and steelhead trout (Oncorhynchus tschawytscha). Proposals to restore and maintain the degraded habitat include controlled one-time remedial peak flows or annual maintenance peak flows designed to flush the spawning gravel and scour the banks, deltas, and pools. The criteria for effective channel restoration or maintenance by streambed flushing and scouring are examined here, as well as the mechanics involved.The liabilities of releasing mammoth scouring-flushing flows approximating the magnitude that preceded reservoir construction make this option unviable. The resulting damage to fish habitat established under the postproject streamflow regime, as well as damage to human settlements in the floodplain, would be unacceptable, as would the opportunity costs to hydroelectric and irrigation water users. The technical feasibility of annual maintenance flushing flows depends upon associated mechanical and structural measures, particularly instream maintenance dredging of deep pools and construction of a sediment control dam on a tributary where watershed erosion is extreme. The cost effectiveness of a sediment dam with a limited useful economic life, combined with perpetual maintenance dredging, is questionable.  相似文献   

18.
Chen, Li, Rina Schumer, Anna Knust, and William Forsee, 2011. Impact of Temporal Resolution of Flow‐Duration Curve on Sediment Load Estimation. Journal of the American Water Resources Association (JAWRA) 48(1): 145‐155. DOI: 10.1111/j.1752‐1688.2011.00602.x Abstract: Estimates of a channel’s annual sediment transport capacity typically incorporate annualized flow‐duration curves. Average daily flow data, commonly used to develop flow‐duration curves, may not adequately describe sediment‐transporting flows in arid and semiarid ephemeral streams. In this study, we examined impacts of varied temporal resolution flow data on annual sediment load estimation. We derived flow‐duration curves for eight sites in the Southwestern United States based on both 15‐min and daily‐averaged flow data. We then estimated sediment loads for both flow‐duration curves using the Sediment Impact Analysis Method, implemented in HEC‐RAS. When average daily flow is used to generate flow‐duration curves, sediment load estimation is lower by up to an order of magnitude. This trend is generally unaffected by uncertainty associated with sediment particle size or hydraulic roughness. The ratio of sediment loads estimated by 15‐min versus daily‐averaged flow‐duration curves is strongly correlated with channel slope, being greater on steep‐slope channels. Sediment loads estimated by the two types of flow‐duration curves are closely correlated, suggesting possible relationships for improving predictions when high‐temporal resolution data are unavailable. Results also suggest that the largest flow contributes significantly to total sediment load, and thus will greatly impact ephemeral stream geomorphology in arid and semiarid regions.  相似文献   

19.
ABSTRACT: Riffles in moderately entrenched stream reaches with gradients of 2 percent to 4 percent that have received excessive sediment from upstream have a distinctly different and higher proportion of smaller mobile particles than riffles in systems that are in dynamic equilibrium. The mobile fraction on the riffle can be estimated by comparing the relative abundance of various particle sizes present on the riffle with the dominant large particles on an adjacent bar. Riffle particles smaller than the dominant large particles on the bar are interpreted as mobile. The mobile percentile of particles on the riffle is termed “Riffle Stability Index” (RSI) and provides a useful estimate of the degree of increased sediment supply to riffles in mountain streams. The RSI addresses situations in which increases in gravel bedload from headwaters activities is depositing material on riffles and filling pools, and it reflects qualitative differences between reference and managed watersheds. The RSI correlates well with other measures of stream channel physical condition, such as V and the results of fish habitat surveys. Thus, it can be used as an indicator of stream reach and watershed condition and also of aquatic habitat quality.  相似文献   

20.
Abstract: Many rivers and streams of the Mid‐Atlantic Region, United States (U.S.) have been altered by postcolonial floodplain sedimentation (legacy sediment) associated with numerous milldams. Little Conestoga Creek, Pennsylvania, a tributary to the Susquehanna River and the Chesapeake Bay, is one of these streams. Floodplain sedimentation rates, bank erosion rates, and channel morphology were measured annually during 2004‐2007 at five sites along a 28‐km length of Little Conestoga Creek with nine colonial era milldams (one dam was still in place in 2007). This study was part of a larger cooperative effort to quantify floodplain sedimentation, bank erosion, and channel morphology in a high sediment yielding region of the Chesapeake Bay watershed. Data from the five sites were used to estimate the annual volume and mass of sediment stored on the floodplain and eroded from the banks for 14 segments along the 28‐km length of creek. A bank and floodplain reach based sediment budget (sediment budget) was constructed for the 28 km by summing the net volume of sediment deposited and eroded from each segment. Mean floodplain sedimentation rates for Little Conestoga Creek were variable, with erosion at one upstream site (?5 mm/year) to deposition at the other four sites (highest = 11 mm/year) despite over a meter of floodplain aggradation from postcolonial sedimentation. Mean bank erosion rates range between 29 and 163 mm/year among the five sites. Bank height increased 1 m for every 10.6 m of channel width, from upstream to downstream (R2 = 0.79, p < 0.0001) resulting in progressively lowered hydraulic connectivity between the channel and the floodplain. Floodplain sedimentation and bank erosion rates also appear to be affected by the proximity of the segments to one existing milldam, which promotes deposition upstream and scouring downstream. The floodplain and bank along the 28‐km reach produced a net mean sediment loss of 5,634 Mg/year for 2004‐2007, indicating that bank erosion was exceeding floodplain sedimentation. In particular, the three segments between the existing dam and the confluence with the Conestoga River (32% of the studied reach) account for 97% of the measured net sediment budget. Future research directed at understanding channel equilibria should facilitate efforts to reduce the sediment impacts of dam removal and legacy sediment.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号