首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
Chile was one of many countries that initiated environmental impact assessments in the 1990s, and has relied on their use for species conservation and territorial planning without the use of larger-scale environmental and ecological planning. The capacity of Chile's environmental impact assessment system (SEIA) to evaluate resident freshwater fishes and the potential impacts of water projects and aquaculture activities – two categories of projects that create direct threats to freshwater fishes – are assessed. Of the 3997 such submissions to the SEIA, only 0.6% conducted any freshwater fish assessment, and only 0.1% conducted any quantitative assessment of expected impacts from the associated project. The small number of assessments was characterized by poor study design, inconsistent sampling methodology, and species misidentification. Traditional assessments failed to include freshwater fish ecology in the general assessment framework. The new strategic environmental evaluation system only underscores the need for vastly improved field sampling protocols and assessment methodologies.  相似文献   

2.
Assessing the environmental impact (EI) of regulatory planning (a lower tier in the Chinese urban planning system) has significant implications for improving the environmental performance of the future built environment. Current environmental impact assessments generally focus on microscale and macroscale, while mesoscale studies at region level are lacking. To fill this gap, this paper proposes an LCA-based environmental impact assessment model for regulatory planning, which focuses on embodied EI of urban construction and operational EI associated with the operation of the built environment. To ensure the regulatory plans both meet the environmental limits and fit well with environmental policy requirements, this paper also presents a new impact analysis method by integrating environmental carrying capacity analysis and distance to target method. The Statutory Plan of Shenzhen Futian Free Trade Zone 03-T2 is used as a case study to test and demonstrate the applying process and functions of the proposed method. Results indicate that the proposed model can effectively quantify the future environmental impact associated with a regional development plan, and can potentially be used as a tool for urban administrators to make decisions on regulatory planning revision and provide references for environmental management.  相似文献   

3.
The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes and outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.  相似文献   

4.
Concepts, planning and design procedures are examined that are needed in the development of long-term stream monitoring programs in forested regions. A long-term stream monitoring program is viewed as the key component for bringing together management organizations, researchers and decision-makers to improve the management of natural resources. The keystones of such ecosystem monitoring are long-term data records that provide the basis for analysis of environmental assessment objectives, predictions and analysis of outcomes which in-turn can be used to modify and improve future projects. Management organizations that initiate long-term monitoring programs are urged to use monitoring actions and information to facilitate decision-making processes that pertain to conserving and allocating resources for future beneficial uses. Recommendations are provided for careful planning and definition of interactive activities of monitoring programs and that should provide information feedbacks that can be used to evaluate issues pertaining to beneficial uses of resources. Procedural requirements and literature sources are suggested for developing long-term stream monitoring programs. They include reviews of background and historical information to provide precise definitions of long-term objectives, planning considerations and monitoring methods. Examples are given of specific procedures that need to be identified during the planning process. They include the application of management standards to variable conditions encountered within natural ecosystems and the detection of the timing of recovery phases of stream ecosystem development following a disturbance. These procedures are viewed as being essential for improving applications of management standards and perceived thresholds to stream and watershed ecosystems monitoring programs.  相似文献   

5.
6.
Community-based ecosystem monitoring activities in Canada are increasing in response to a number of factors including: (i) the needs of decision-makers for timely information on local environmental changes; (ii) limited use of government monitoring data and information by decision makers; (iii) government cuts to monitoring programs; (iv) the increasingly recognized need to include stakeholders in planning and management processes; and (v) the desire of citizens to contribute to environmental protection. To date there has been no network coordination of community based monitoring in Canada. This paper reports on the establishment of the Canadian Community Monitoring Network by Environment Canada's Ecological Monitoring and Assessment Network Coordinating Office and the Canadian Nature Federation. Information on research prepared in support of network establishment is presented along with a discussion of the potential of the network.  相似文献   

7.
Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.  相似文献   

8.
Highway construction or expansion projects are among major activities of economic development especially in developing countries. However, road development consistently can lead to major damages to the environment, including habitat fragmentation and ecological instabilities and a considerable threat to fauna and flora. At this point, Environmental Impact Assessment (EIA) in road developments is needed to address and evaluate the ecological issues in decision-making. The object of this study is to strengthen the consideration of ecological issues, i.e., biodiversity in the existing EIA tools. This paper regards a network method as a means to make informed planning decisions by the lessons from a case study. The results indicate that network method is well suited to be applied in ecological impacts assessment. However, some limitations such as complexity and time consumed make casual networks unpopular. Also, impact of traffic noise on acoustic communication (wildlife and human) was performed. It has been shown that sound level for human is much higher than admissible standards. Finally, the study expresses some mitigation measures to improve the acquisition for environmental impact assessment process.  相似文献   

9.
In this article a comprehensive approach for the evaluation of possible health effects in an environmental impact assessment (EIA) is described, illustrated with the example of Amsterdam Airport Schiphol. Unlike many EIAs, we estimated quantitatively the impact of aircraft-related pollution in terms of the number of affected people for aircraft noise annoyance, odour annoyance and hypertension. In addition, an analysis of health registry data on cardiovascular and respiratory diseases and a short survey on annoyance and risk perception were carried out. The scope of a health impact assessment depends on the situation, available knowledge and data, concern in the population about the impact and the number of people concerned. It is important to pay attention to the perception of risks and concerns from all parties involved. Moreover, the results demonstrate that far more people outside the area for which standards apply were affected than inside.  相似文献   

10.
Environmental benchmarks are widely used in Canadian environmental assessment as a standard against which to monitor air or water quality in response to human activities in the environment. Recent work in Canada has developed the concept of ecological benchmarks as a complement to environmental benchmarks. However, implementation of ecological benchmarks may be challenging. This paper presents an analogy between ecological benchmarks and the more commonly used environmental benchmarks, as an attempt to increase understanding and use of ecological benchmarks in resource management, assessment, and monitoring. Ecological benchmarks, and their corresponding indicators, will be challenging to identify and use. However, through the use of the principles of adaptive management, effective ecological indicators and benchmarks can be established. Although it is essential that ecological benchmarks are site-specific, the analogy and general principles outlined here are applicable to assessment and monitoring in any part of the world.  相似文献   

11.
A longstanding critique of project-level environmental assessment is that it is weak at addressing cumulative effects, and because of this many argue that cumulative effects are best managed at a regional scale. However, in the absence of regional management it is important that project-level assessment supports cumulative effects management as best as possible. In this paper we present case study socio-economic impact assessments of liquefied natural gas development on Aboriginal groups on Canada's west coast. The case studies use an analytical structure modified from typical Canadian practice including unambiguous and non-arbitrary significance thresholds grounded in stakeholder values to focus baselines, impact assessment, and significance determination on cumulative effects. This approach is found to be more capable of informing decision-makers on cumulative effects as well as more rigorous and transparent than typical assessments. Much of this approach is not conceptually new, but at least in western Canada such an approach is not typically used or meaningfully implemented by practitioners. As such, the case studies serve to illustrate how practice can bolster project-level assessment.  相似文献   

12.
LEONARD ORTOLANO has written a textbook, Environmental Planning and Decision Making, that is ideal for introducing undergraduates to the field of environmental planning. His three chapters on environmental impact assessment (from 16 chapters overall) present a range of impact assessment methods in a helpful decision-making context. Specific techniques for considering biological factors in planning, evaluating the visual qualities of the environment, assessing noise impacts, assessing air quality impacts, and assessing impacts on water resources are also covered in five additional chapters. Professional planners and engineers should find this introduction to the approaches employed by specialists of various kinds helpful. With the permission of the publisher, John Wiley and Sons, we here reprint Chapter 15, “Estimating Air Quality Impacts,” from Ortolano's excellent book. This straightforward presentation of a six-step process for establishing the air quality impacts of proposed development projects is a model of clarity.  相似文献   

13.
This study applies a process of detailed assessment to summarize the potential impact of a proposed construction or other activity on the environment before implementation of an investment plan. The aim of the study was to develop a general methodology for analysis and evaluation of environmental issues connected with planned activities and proposed projects (especially buildings and engineering constructions, required implementation of environmental impact assessment process) using a risk analysis method, thus enabling the best option among the proposed activities to be chosen. The methodology was developed for conditions in Slovakia but could be arranged for any other country considering national conditions, requirements, standards and legislative. Application of the developed methodology in environmental impact assessment could create preconditions for more effective implementation of the EIA process. This paper provides a framework for the risk analysis component of the scoping phase within the EIA process. The process outlined in this paper will assist with determination of an estimation of risks to environmental and health of proposed activities.  相似文献   

14.
结合文献调研以及江苏省试点区(县)工作开展情况,从区域环境风险源布局规划、地方环境应急管理、应急资源优化配置、区域突发环境事件应急预案编制等方面对行政区突发环境事件风险评估在环境管理中的应用进行探讨。指出了行政区突发环境事件风险评估工作面临的问题,提出,在统一评估标准的基础上,结合区域环境风险特征及试点地区工作经验,不断优化完善指标体系,补充各地先进做法,制定符合本行政区实际情况的区域突发环境事件风险评估技术指南。  相似文献   

15.
Monitoring activities in protected areas have a long history. Internal planning and management needs early led to ecological inventories. More recently the increasing number and awareness of external threats to parks has led to a variety of monitoring programs. Efforts to use protected areas, and especially biosphere reserves, as ecological baselines, have reinforced this trend. And as protected areas are increasingly recognized to be islands with complex internal and regional interactions, holistic, systems approaches to inventory, monitoring, and assessment of their state are being developed. This paper begins by reviewing threats to parks and the origins and importance of inventory and monitoring activities. A review of resource survey methods follows. Ecosystem science and environmental monitoring are introduced as a foundation for consideration of several newer approaches to monitoring and assessing the state of natural environments. These newer approaches are stress/response frameworks, landscape ecology, ecosystem integrity, and state of the environment reporting. A final section presents some principles for monitoring the state of protected areas. Examples are drawn from experience with Canadian national parks.  相似文献   

16.
17.
浅谈基层单位环境监测专项经费的管理   总被引:2,自引:2,他引:0  
随着环境监测事业的不断发展,中央财政对环保监测事业经费投入大幅上升,资金安排规模逐年加大,加强环境监测项目经费管理显得尤其重要.文章提出如何科学地编制环境监测项目支出预算,并深入分析了环境监测项目管理存在的问题,进一步提出了加强项目支出预算的管理途径地方法.  相似文献   

18.
Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare.  相似文献   

19.
In recent years, climate change has caused a significant impact on the human living environment, and the greenhouse effect caused by gases such as carbon dioxide cannot be ignored. From the viewpoint of environmental management, Strategic Environmental Assessment (SEA) has the functions of value judgment, prediction, and behavioral orientation on the possible impact of strategic planning. Integrating climate change factors into the SEA process can help planners and decision-makers better highlight the importance of climate change in policy and planning stages. Therefore, by combining the development of the SEA of China with relevant international experience, we explore the integration of climate change factors into the SEA framework and construct a technical procedure for such an assessment. A suggestive assessment indicator system for the SEA based on low-carbon targets was established for evaluating the impact of the implementation of strategic planning on low-carbon development goals. The objective is to mitigate the impact of climate change via the SEA and to ensure that the assessment plays an important role in tackling climate change and promoting sustainable development.  相似文献   

20.
Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号