首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
IntroductionWith the development of industries and increased diversity of their associated hazards, the importance of identifying these hazards and controlling the Occupational Health and Safety (OHS) risks has also dramatically augmented. Currently, there is a serious need for a risk management system to identify and prioritize risks with the aim of providing corrective/preventive measures to minimize the negative consequences of OHS risks. In fact, this system can help the protection of employees’ health and reduction of organizational costs. Method: The present study proposes a hybrid decision-making approach based on the Failure Mode and Effect Analysis (FMEA), Fuzzy Cognitive Map (FCM), and Multi-Objective Optimization on the basis of Ratio Analysis (MOORA) for assessing and prioritizing OHS risks. After identifying the risks and determining the values of the risk assessment criteria via the FMEA technique, the attempt is made to determine the weights of criteria based on their causal relationships through FCM and the hybrid learning algorithm. Then, the risk prioritization is carried out using the MOORA method based on the decision matrix (the output of the FMEA) and the weights of the criteria (the output of the FCM). Results: The results from the implementation of the proposed approach in a manufacturing company reveal that the score at issue can overcome some of the drawbacks of the traditional Risk Priority Number (RPN) in the conventional FMEA, including lack of assignment the different relative importance to the assessment criteria, inability to take into account other important management criteria, lack of consideration of causal relationships among criteria, and high dependence of the prioritization on the experts’ opinions, which finally provides a full and distinct risk prioritization.  相似文献   

2.
A significant number of pipeline operators use pipeline integrity management (PIM) to improve pipeline safety and reliability. Risk assessment is a critical step in PIM, because it determines the necessity of conducting the following steps in PIM for certain pipelines. Risk acceptance criteria are required in the process of risk assessment. Individual risk and societal risk are most frequently adopted as the two indicators of the risk acceptance criteria. To the best of the authors’ knowledge, quantitative societal risk acceptance criteria, especially for gas distribution pipelines, do not exit. The aim of this paper is to establish the societal risk acceptance criteria for gas distribution pipelines. Hence, FN curves were established using historical incident data from 2002 to 2017 provided by the U.S. Department of Transportation (DOT). Linear regression and the ALARP principle are used in evaluating the limits of the negligible line and intolerable line to obtain a graphical societal risk acceptance criterion for gas distribution pipelines. A line having a slope of −1.224, and an anchor point of (1, 8.413 × 10−7) is proposed as the negligible line. Further, the intolerable line has a slope of −1.224, and an anchor point of (1, 2.524 × 10−6). Both the negligible risk and the intolerable risk for the gas distribution pipeline are lower than the current societal risk acceptance criteria for hazardous installations. The reasons for these relatively lower risk acceptance criteria are discussed.  相似文献   

3.
本文阐述了定量风险评价的指标、模型和一般程序,给出了定量风险评价的标准,采用定量风险评价的方法对某企业规划建设的炼化一体化项目进行个人风险和社会风险水平计算。个人风险计算结果表明,该炼化一体化项目所在厂区内没有出现1×10-3的风险等值线,1×10-4、1×10-5和1×10-6的风险等值线也没有超出厂区边界,说明该炼化一体化项目厂区内部和周边人员所面临的个人风险是可以接受的。社会风险计算结果表明,该炼化一体化项目的社会风险曲线处在可容许区范围内,没有进入不可容许区和ALARP区,说明该项目的社会风险也是可以接受的。本文采用的定量风险评价方法可为规划或已建炼化一体化项目进行风险水平评估提供必要的参考依据。  相似文献   

4.
综合安全评价(FSA)方法   总被引:22,自引:2,他引:22  
为提高国际海运安全管理的决策水平,国际海事组织(IMO)接受并倡导由英国海运界提出的综合安全评价(FSA)方法,笔者对FSA方法作了本质性分析和应用性研究。阐述了FSA的由来,5个组成步骤及相互关系和流程,揭示了FSA与风险管理和安全系统工程的渊源;介绍了危险识别的7种工具;对步骤二“风险评估”重点引入了半定量分析方法和定量分析方法,并用集合论观点讨论了事故频率和后果严重度的计算方法;介绍了风险控制方案的“成本与效益评估”的数学模型;归纳了FSA方法的优缺点。指出FSA是一种集风险评价和成本/效益评估于一体,兼顾技术性与经济性,可广泛兼容具体评价方法和普遍适用各类风险评价的框架性方法,但具体应用需要有效整合适用的定性和定量方法。  相似文献   

5.
为实现对油气管道风险的有效控制,结合油气管道的特点,基于成本收益分析方法改进风险控制决策过程。首先,确定风险控制目标,对所建议的措施进行初步筛选,并根据行业现状确定基线场景;之后,量化筛选后的措施的成本与收益,通过计算成本收益率(CBR)或规避事故隐含成本(ICAF)来确定相应措施的合理性;最后,依据上述分析制定风险控制决策。结果表明:不同措施的CBR或ICAF值不同,CBR或ICAF值较低的措施应被优先实施;而当CBR或ICAF值超过标准值时,相应措施是不合理的,应不予以实施。  相似文献   

6.
Asset integrity is a major concern of process facilities. Monitoring and assessing asset integrity is a challenging task due to the involvement of various dependent and independent parameters. Monitoring and assessing asset performance through indicators is one easily doable option. Lack of an appropriate set of indicators quantification technique and measurement cohesion limits the use of an indicator system. To overcome this, in the present paper a hierarchical framework is prepared to for asset integrity monitoring and assessment. The hierarchical structure is used to characterize the asset and relate it to an organization’s strategic goal. The hierarchical structure is based on three major areas of asset integrity, namely: mechanical, personnel and process. Further, it provides an opportunity to follow a bottom-up perspective for identifying multilevel level indicators. The proposed approach uses a risk metric to classify asset integrity through the integration of leading and lagging indicators’ outcome. The analytical hierarchy process is used to determine the weights, or for prioritization of each level indicator and for the aggregation of the indicators to classify risk. To test the proposed model, a benchmark study is conducted. The estimated asset integrity index value provides a tangible asset’s performance index. The system of indicators and their integration provide a comprehensive view of the process facility’s status and also reveal which sections of the facility need more attention.  相似文献   

7.
Risk-based route evaluation is necessary for decision making by authorities for regulating hazardous materials (hazmats) transport vehicles. The paper highlights risk estimation and its representation for three highway study routes in western India using frequency analysis through logic diagrams and scenario based detailed consequence analysis of accidental releases considering 26 hazmats from UN Classes-2, 3, 6 and 8 categories. The 3 routes have been evaluated based on several layers of analysis namely hazmat-wise, route-segment-wise, route-wise and overall assessment including presentation of normalized risk figures. The results show that compared to the risk on city route segment, individual risks on other two routes are higher and extend beyond ALARP (As Low As Reasonably Practicable) region when assessed against HSE, UK risk criteria, whereas, societal risks on all three routes are within the ALARP except some part in the higher fatality area. But, considering the general mortality rates in India and sustained economic growth, the authors proposed widening of the ALARP region for individual risk tolerability of transportation activity of essential commodities that benefits society to a large extent in this developing economy. However, specific risk reduction measures have also been suggested to improve upon the risk picture in the study area.  相似文献   

8.
In refineries and processing plants, the enormous amount of piping is more complex in distribution than other types of equipment. In general, compared with other types of equipment in these industries, more difficulty in inspection planning is encountered.

However, under-inspection or over-inspection can occur due to the lack of jurisdictional requirements on the inspection interval and method for piping, or the inspection interval being based only on piping service classifications in the existing regulations, such as API 570. This can result in unacceptable risks, along with costly loss of resources.

To lessen the piping risk level, more and more companies have adopted and applied risk based inspection (RBI) methodology, leading to risk reduction and cost benefits since the last decade. This study applied RBI methodology to optimize the inspection strategy of the piping in a refinery and petrochemical plants in Taiwan. Two actual case studies were corroborated better with quantitative RBI methodology than without the methodology in terms of risk and cost reductions.  相似文献   


9.
Alarm flooding is a major safety issue in today's processing facilities. Important recommendations are available for alarm management; however, they are often violated in practice, especially in the alarm systems implemented through the distributed control system. An effective process alarm prioritization and management system is desired for a safe and effective operation of a process facility.In present work, authors address two main issues related to an alarm system – the reliability and the prioritization of the alarms. The main objective is to deal with the alarm-flooding problem in process facilities. A multi alert voting system based on sensor redundancy approach is proposed to improve the reliability. A quantitative risk-based alarm management approach is proposed to address the flooding issue. In the risk-based approach, an integrated model consisting of the probability (P), the impact (I) of the potential hazards, and the process safety time is proposed to prioritize these raised alarms.The proposed approach is further explained by a reactor system with pressure and temperature variable monitoring and controls, where the hazards associated with two alerts caused by over high pressure and over high temperature are analyzed and integrated with response time for alarms generation and prioritization.  相似文献   

10.
This paper provides a risk assessment method of sheltering in-place for high-pressure natural gas wells with hydrogen sulphide. In this paper, the shelter-in-place risk is estimated by integrating the health consequences of an individual taking one kind of emergency response to the emergency orders of sheltering in place from the emergency decision makers and the probability of the corresponding emergency response action. The probability of the corresponding emergency response action in the proposed method is estimated through the accident probability analysis and the probability analysis of taking a certain response action. The health consequence estimation is based on air exchange rate test of the shelter buildings as well as accident consequence calculation. The evaluation of shelter-in-place risks based on “as low as reasonably practicable (ALARP)” guidelines was employed to provide suggestions for emergency management under both normal conditions and off normal conditions. A case study of risk assessment of sheltering in the local residential houses in Xuanhan County of Sichuan Province, China was taken as an example to illustrate the proposed risk assessment process of shelter-in-place and its application in the decision-making process for emergency management.  相似文献   

11.
The overall objective of the maintenance process is to increase the profitability of the operation and optimize the total life cycle cost without compromising safety or environmental issues. Risk assessment integrates reliability with safety and environmental issues and therefore can be used as a decision tool for preventive maintenance planning. Maintenance planning based on risk analysis minimizes the probability of system failure and its consequences (related to safety, economic, and environment). It helps management in making correct decisions concerning investment in maintenance or related field. This will, in turn, result in better asset and capital utilization.

This paper presents a new methodology for risk-based maintenance. The proposed methodology is comprehensive and quantitative. It comprises three main modules: risk estimation module, risk evaluation module, and maintenance planning module. Details of the three modules are given. A case study, which exemplifies the use of methodology to a heating, ventilation and air-conditioning (HVAC) system, is also discussed.  相似文献   


12.
Erik Vanem 《Safety Science》2012,50(4):958-967
Ethics are concerned with distinguishing between what actions are “right” and “wrong” and what values are “good” and “bad”, etc. and there is a long academic tradition in discussing ethics and ethical theories. Risk acceptance criteria, on the other hand, distinguish between levels of risks that are acceptable and levels that are intolerable. In some sense, one may say that risk acceptance criteria distinguishes between “good” and “bad” systems and activities with regards to the risk they expose the society or elements of a society to and there is thus an obvious link between ethics and risk acceptance criteria or to risk management at large. However, there are few references in the literature that explores this link, and in this paper, the ethical foundation of fundamental principles of risk acceptance criteria will be elaborated upon.This paper considers some important principles for establishing risk acceptance criteria for safety critical systems and activities. The various principles and the philosophies behind them might at first sight seem contradictory and exclusive, but it is demonstrated how they may coexist in one and the same regulatory regime; They may complement each other in order to achieve the overall safety objectives of society. Then, some brief considerations of the ethical foundations for the principles will be given and some relevant examples of actual risk acceptance criteria will be given from the maritime industries. However, it is believed that the principles and discussions are of general interest and apply to all areas of technical risk and to safety regulations in a broader perspective.  相似文献   

13.
14.
Ensuring the safe operation of hydropower stations is one of the key challenges for electric generation. Clearly the safe operation of such systems can only be archived with proper and effective maintenance scheduling. The objective of this study is to analyze, rank and prioritize the risk factors responsible for equipment failures of a hydraulic turbine generator unit (HTGU) based on operating data and expert elicitation. Here a simple qualitative risk evaluation model is proposed able to consider seven typical failures in HTGU. The proposed tool is applied for the risk prioritization of equipment failures, e.g. shaft torsion, misalignment, rotating fault, axis bend, runner fault, water guide, and wicket gate of a hydropower station in China. The obtained results have been compared against the actual statistics of equipment failures of a hydropower station in China, considered showing good agreement. All of these results provide theoretical guidance for digitalization realization of equipment failures.  相似文献   

15.
Conventional hazard evaluation techniques such as what-if checklist and hazard and operability (HAZOP) studies are often used to recognise potential hazards and recommend possible solutions. They are used to reduce any potential incidents in the process plant to as low as reasonably practicable (ALARP) level. Nevertheless, the suggested risk reduction alternatives merely focus on added passive and active safety systems rather than preventing or minimising the inherent hazards at source through application of inherently safer design (ISD) concept. One of the attributed reasons could be the shortage of techniques or tools to support implementation of the concept. Thus, this paper proposes a qualitative methodology that integrates ISD concept with hazard review technique to identify inherent hazards and generate ISD options at early stage of design as proactive measures to produce inherently safer plant. A modified theory of inventive problem solving (TRIZ) hazard review method is used in this work to identify inherent hazards, whereby an extended inherent safety heuristics tool is developed based on established ISD principles to create potential ISD options. The developed method namely Qualitative Assessment for Inherently Safer Design (QAISD) could be applied during preliminary design stage and the information required to apply the method would be based on common process and safety database of the studied process. However, user experiences and understanding of inherent safety concept are crucial for effective utilisation of the QAISD. This qualitative methodology is applied to a typical batch reactor of toluene nitration as a case study. The results show several ISD strategies that could be considered at early stage of design in order to prevent and minimise the potential of thermal runaway in the nitration process.  相似文献   

16.
HAZID方法浅析   总被引:3,自引:0,他引:3  
结合实际工程建设项目开展危险源辨识(HAZID)分析的情况,介绍了HAZID分析方法的广义和狭义概念内涵,主要分析步骤、每步主要工作内容、典型引导词、分析形式和特点,并将HA-ZID方法与常用的过程危险源方法、尤其是HAZOP分析方法进行了对比,以帮助读者更好地理解、运用此方法。本文拟推荐的HAZID分析方法将危险化学品行业的风险管理向前延伸到项目的早期阶段(如项目论证、可行性研究、基础工程设计或初步设计阶段),可以帮助项目组在项目建设早期认识与项目有关的健康、安全、环境(HSE)各方面问题的重要性和相关性,所辨识出的关键危险源及其危险,为下一步有重点、有目的地开展项目HSE风险管理确定了关注重点。在早期阶段进行HAZID分析,还可以有机会以最小的代价实现对项目厂址和总图布置的调整、工艺方案和设计原则的优化,可以避免后期再发现HSE隐患、必须整改时可能存在的不可实施性,或对项目费用、进度等产生严重负面影响。  相似文献   

17.
This study presents an assessment model that examines quantity and quality factors for equipment risk management in the petrochemical industry. The proposed model has five dimensions—financial performance, logistical support, service level, learning and innovation, and risk control. This evaluation model uses 13 strategy subjects and 78 performance-measurement indicators. Performance assessment indicators are initially established and revised based on expert opinions collected via a questionnaire. Further, the analytical network process (ANP) is utilized to calculate the weights of indicators in each layer and to construct assessment models with applicable and valuable references. To determine model practicability, this study assesses four subsidiaries of the case company. Each subsidiary has a capitalization exceeding TWD 50 billion. In addition to evaluating company performance in terms of each dimension and indicator, the proposed model provides a valuable reference for decision-making in equipment risk management.  相似文献   

18.
Safety and risk assessment are characterised by aspects, like subjectivity and objectivity. In this paper, relations between safety and risk are described. When a risk analysis is performed, it is important to realise that decision-making about risks is very complex, and not only technical aspects but also economical, environmental, comfort related, political, psychological and societal acceptance are aspects that play an important role. In order to balance safety measures with aspects, such as environmental, quality, and economical aspects, a weighted risk analysis methodology is proposed in this paper. This paper also provides a theoretical background regarding the scope of safety assessment in relation to the decision-making in complex urban development projects adjacent to or above transport routes of hazardous materials. In Western Europe, such projects are realised due to shortage of space. The weighted risk analysis is an interesting tool comparing different risks, such as investments, economical losses and the loss of human lives, in one-dimension (e.g., money), since both investments and risks could be expressed solely in money. Finally, the weighted risk analysis approach is applied in a case study of Bos and Lommer, Amsterdam.  相似文献   

19.
Urban rail network safety is a critical sector of urban public safety. However, there is no uniform standard for the safety evaluation of the urban rail network. This paper presents a novel methodology by integrating a multilevel decision tree with a fuzzy analytical approach to enhance urban rail network safety. The proposed methodology overcomes serious limitations such as subjectivity in the data and independence of the variables in decision-making processes. The proposed methodology is applied to the risk evaluation of the selected Chongqing rail transit lines and the Expo Line. The risk analysis is considered using the field data collected from these transit lines. The applied case studies confirm the general applicability of the methodology and the multilevel decision tree network. The main risk factors identified for the Chongqing rail traffic system are the terrorist threat, emergency management, and aging infrastructure which need to be investigated as a priority to mitigate risk associated with these infrastructures.  相似文献   

20.
Selection problems are common in process engineering. In most cases, it is necessary to rank alternatives based on multiple criteria (e.g., cost, safety, environmental impact), which are often conflicting. In addition, some criteria may be fundamentally difficult to quantify due to data scarcity, in which case subjective assessments need to be used as a proxy. Decision analysis tools such as the analytic hierarchy process (AHP) are useful to ensure decision-making is done rationally. In this work, we propose a fuzzy AHP variant, wherein pairwise comparison of decision elements by domain experts is expressed with triangular fuzzy numbers. This approach allows the degree of confidence of the expert to be quantified explicitly; it also allows inconsistencies in judgment to be reconciled within the bounds of the fuzzy numbers to generate reasonable values for the weighting factors. We demonstrate the methodology on three case studies, involving the comparison of different types of chlor-alkali electrolytic cells, CO2 capture techniques in cement plants and wastewater treatment options for municipal wastewater.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号